GERC · Gujarat Electricity Regulatory Commission
Procurement of Energy from Renewable Sources (Third Amendment) Regulations, 2022 — Draft
Gujarat Electricity Regulatory Commission (Procurement of Energy from Renewable Sources) (Third Amendment) Regulations, 2022
Draft amendmentDated 30 Jan 2022
Draft
A proposal that has since been finalised as the Procurement of Energy from Renewable Sources (Third Amendment) Regulations, 2022.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a draft amendment by the Gujarat Electricity Regulatory Commission to its 2010 renewable-procurement regulations, put out for previous publication (consultation), with the notification number left blank and no issue date printed (p1). It is short — four operative clauses plus a signature block — and does three things.
First, it rewrites the definition of "renewable energy sources" in Regulation 2(p), retaining the list of eligible non-conventional technologies (small/mini/micro hydro up to and including 25 MW, wind, solar, biomass, bagasse, bio-fuel cogeneration, municipal waste) and adding that large hydro projects above 25 MW commissioned after 8 March 2019 count only towards the Hydro Power Purchase Obligation, with a narrow route for LHP energy to serve solar and other non-solar RPO once compliance reaches 85% (p1–2).
Second, it replaces Table II of Regulation 4.1 — the table earlier substituted by the 2018 Second Amendment — setting out the year-wise minimum RPO percentages for wind, solar, HPO, others and total from FY 2017-18 to FY 2023-24 (p2).
Third, it substitutes para 2 of Regulation 4.1 with a set of provisos (p2–3): how HPO is to be met from eligible large hydro (including pumped storage) commissioned between 08.03.2019 and 31.03.2024, limited to 70% of generated capacity for 12 years and excluding free power and Local Area Development Fund contributions; the availability of a Hydro Energy Certificate mechanism to distribution licensees; use of State-consumed free power towards HPO; and carry-over of a shortfall in one renewable category into the others. A final proviso continues the FY 2023-24 targets into FY 2024-25 and beyond unless the Commission specifies otherwise.
The regulations extend to the whole of Gujarat and take effect from Gazette publication, the date of which is not printed (p1).
Read with this
The regulation
- Dated 17 Apr 2010Procurement of Energy from Renewable Sources Regulations, 2010
Amendments and corrections
Commencement notices and reasons
- Dated 17 Apr 2010Procurement of Energy from Renewable Sources Regulations, 2010 — Statement of Reasons
- Dated 1 Jul 2015Applicability of Procurement of Energy from Renewable Sources to Captive and Open Access Users — Notification No. 2 of 2015
- Dated 20 Apr 2018Procurement of Energy from Renewable Sources Regulations, 2010 — Second Amendment, 2018 — Statement of Reasons
- Dated 8 Apr 2022Procurement of Energy from Renewable Sources (Third Amendment) Regulations, 2022 — Statement of Reasons
Procedures and orders made under it
- Dated 16 Jul 2010Designating State Nodal Agency for REC, 2010
Proposed changes (drafts with no final yet)
- Dated 30 Sep 2024Procurement of Energy from Renewable Sources Regulations, 2024 — Draft
- Dated 30 Sep 2024Annexure or form: Appendix-I — RPO Compliance Format
Earlier drafts
- Dated 6 Nov 2013Gujarat Procurement of Energy from Renewable Sources (First Amendment) Regulations, 2013
- Dated 20 Nov 2013Procurement of Energy from Renewable Sources (First Amendment) Regulations, 2013 — Corrigendum to Draft Notification
- Dated 30 Jan 2022Explanatory memorandum: Procurement of Energy from Renewable Sources (Third Amendment) Regulations, 2022 — Explanatory Memorandum — Draft
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.