GERC · Gujarat Electricity Regulatory Commission
Procurement of Energy from Renewable Sources Regulations, 2010 — Statement of Reasons
Procurement of Energy from Renewable Sources Regulations, 2010
Statement of reasonsDated 17 Apr 2010
Replaced by Procurement of Energy from Renewable Sources Regulations, 2025
See that regulation for the date it took effect and for anything it keeps in force.
The commission's reasons for the Procurement of Energy from Renewable Sources Regulations, 2010 or one of its amendments.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The document is the Gujarat Electricity Regulatory Commission's Statement of Reasons for its proposed Procurement of Energy from Renewable Sources Regulations, 2010 (p1, p21). It is not the regulation itself; it records the Commission's background, the objections received, its analysis, and its decisions to be incorporated before publication in the Official Gazette (p21).
Pages 1–4 set out the statutory and policy background: the Electricity Act's renewable promotion mandate, the National Action Plan on Climate Change, the National Electricity Policy and Tariff Policy, the earlier 2005 Regulation No. 15, the 2009 draft, the public notice, and the litigation history that made that draft non-existent (p1–4). Pages 4–5 describe the fresh 2010 draft, 24 stakeholder responses and the 4 March 2010 public hearing.
Pages 5–11 deal with preliminary objections. The Commission rejects a challenge to its jurisdiction, finding power under section 86(1)(e) read with sections 61(h) and 181 of the Electricity Act (p5–9). It also retains Renewable Energy Certificate provisions on the basis of CERC's REC framework and the Forum of Regulators model (p9–11). Pages 11–15 justify applying RPO to open access consumers and captive users, while limiting it for the present to captive plants of 5 MW or more (p14–15). Pages 15–16 hold that only cogeneration from renewable sources counts toward RPO. Pages 16–18 revise the RPO trajectory by source category after a GEDA assessment and decide not to fix a longer-term trajectory. Pages 18–19 align definitions with CERC REC regulations. Pages 19–21 cover default consequences and the default fund, grid connectivity, cross-subsidy and third-party sale, and the State Agency, before directing Gazette publication of the 08/01/2010 draft with changes (p21).
Read with this
The regulation
- Dated 17 Apr 2010Procurement of Energy from Renewable Sources Regulations, 2010
Amendments and corrections
Commencement notices and reasons
- Dated 1 Jul 2015Applicability of Procurement of Energy from Renewable Sources to Captive and Open Access Users — Notification No. 2 of 2015
- Dated 20 Apr 2018Procurement of Energy from Renewable Sources Regulations, 2010 — Second Amendment, 2018 — Statement of Reasons
- Dated 8 Apr 2022Procurement of Energy from Renewable Sources (Third Amendment) Regulations, 2022 — Statement of Reasons
Procedures and orders made under it
- Dated 16 Jul 2010Designating State Nodal Agency for REC, 2010
Proposed changes (drafts with no final yet)
- Dated 30 Sep 2024Procurement of Energy from Renewable Sources Regulations, 2024 — Draft
- Dated 30 Sep 2024Annexure or form: Appendix-I — RPO Compliance Format
Earlier drafts
- Dated 6 Nov 2013Gujarat Procurement of Energy from Renewable Sources (First Amendment) Regulations, 2013
- Dated 20 Nov 2013Procurement of Energy from Renewable Sources (First Amendment) Regulations, 2013 — Corrigendum to Draft Notification
- Dated 30 Jan 2022Procurement of Energy from Renewable Sources (Third Amendment) Regulations, 2022 — Draft
- Dated 30 Jan 2022Explanatory memorandum: Procurement of Energy from Renewable Sources (Third Amendment) Regulations, 2022 — Explanatory Memorandum — Draft
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.