GERC · Gujarat Electricity Regulatory Commission
Procurement of Energy from Renewable Sources (Third Amendment) Regulations, 2022
Gujarat Electricity Regulatory Commission (Procurement of Energy from Renewable Sources) (Third Amendment) Regulations, 2022
AmendmentDated 8 Apr 2022Notification No. 01 of 2022 dated 08/04/2022
Replaced by Procurement of Energy from Renewable Sources Regulations, 2025
See that regulation for the date it took effect and for anything it keeps in force.
Amends the Procurement of Energy from Renewable Sources Regulations, 2010.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Third Amendment to the GERC (Procurement of Energy from Renewable Sources) Regulations, 2010, notified as Notification No. 01 of 2022 and signed at Gandhinagar on 08/04/2022 (p1, p4). It extends to the whole of Gujarat and takes effect from publication in the Official Gazette; no Gazette date is printed (p1).
Three things are changed. First, the definition of "renewable energy sources" in Regulation 2(p) is substituted, so that eligible sources now include small/mini/micro hydro up to and including 25 MW, wind, solar, biomass, bagasse, bio-fuel cogeneration, urban or municipal waste, and large hydro above 25 MW commissioned on or after 8 March 2019 per the Ministry of Power notification of that date; the substituted clause also makes energy from such large hydro eligible to meet the Hydro Power Purchase Obligation (HPO) (p1–2).
Second, Table II of the 2018 Second Amendment Regulations is replaced with a new table of year-wise minimum Renewable Power Purchase Obligation percentages, split across wind, solar, HPO, and "others" and totalled by year from 2017-18 to 2024-25 (p2). Third, paragraph 2 of Regulation 4.1 is substituted with a set of provisos governing how HPO may be met: eligibility of large hydro and pumped storage plants, a cap on the share of generated capacity counted and the number of years it counts for, free power and Local Area Development Fund treatment, exclusion of hydro imported from outside India, a Hydro Energy Certificate mechanism, use of State/discom free power towards HPO, cross-technology substitution when a technology shortfall occurs, and continuation of FY 2024-25 targets into FY 2025-26 and beyond unless the Commission specifies otherwise (p3–4).
Read with this
The regulation
- Dated 17 Apr 2010Procurement of Energy from Renewable Sources Regulations, 2010
Amendments and corrections
Commencement notices and reasons
- Dated 17 Apr 2010Procurement of Energy from Renewable Sources Regulations, 2010 — Statement of Reasons
- Dated 1 Jul 2015Applicability of Procurement of Energy from Renewable Sources to Captive and Open Access Users — Notification No. 2 of 2015
- Dated 20 Apr 2018Procurement of Energy from Renewable Sources Regulations, 2010 — Second Amendment, 2018 — Statement of Reasons
- Dated 8 Apr 2022Procurement of Energy from Renewable Sources (Third Amendment) Regulations, 2022 — Statement of Reasons
Procedures and orders made under it
- Dated 16 Jul 2010Designating State Nodal Agency for REC, 2010
Proposed changes (drafts with no final yet)
- Dated 30 Sep 2024Procurement of Energy from Renewable Sources Regulations, 2024 — Draft
- Dated 30 Sep 2024Annexure or form: Appendix-I — RPO Compliance Format
Earlier drafts
- Dated 6 Nov 2013Gujarat Procurement of Energy from Renewable Sources (First Amendment) Regulations, 2013
- Dated 20 Nov 2013Procurement of Energy from Renewable Sources (First Amendment) Regulations, 2013 — Corrigendum to Draft Notification
- Dated 30 Jan 2022Procurement of Energy from Renewable Sources (Third Amendment) Regulations, 2022 — Draft
- Dated 30 Jan 2022Explanatory memorandum: Procurement of Energy from Renewable Sources (Third Amendment) Regulations, 2022 — Explanatory Memorandum — Draft
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.