Procurement of Energy from Renewable Sources (Third Amendment) Regulations, 2022

Gujarat Electricity Regulatory Commission (Procurement of Energy from Renewable Sources) (Third Amendment) Regulations, 2022

AmendmentDated 8 Apr 2022Notification No. 01 of 2022 dated 08/04/2022

Replaced by Procurement of Energy from Renewable Sources Regulations, 2025

See that regulation for the date it took effect and for anything it keeps in force.

Amends the Procurement of Energy from Renewable Sources Regulations, 2010.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Third Amendment to the GERC (Procurement of Energy from Renewable Sources) Regulations, 2010, notified as Notification No. 01 of 2022 and signed at Gandhinagar on 08/04/2022 (p1, p4). It extends to the whole of Gujarat and takes effect from publication in the Official Gazette; no Gazette date is printed (p1).

Three things are changed. First, the definition of "renewable energy sources" in Regulation 2(p) is substituted, so that eligible sources now include small/mini/micro hydro up to and including 25 MW, wind, solar, biomass, bagasse, bio-fuel cogeneration, urban or municipal waste, and large hydro above 25 MW commissioned on or after 8 March 2019 per the Ministry of Power notification of that date; the substituted clause also makes energy from such large hydro eligible to meet the Hydro Power Purchase Obligation (HPO) (p1–2).

Second, Table II of the 2018 Second Amendment Regulations is replaced with a new table of year-wise minimum Renewable Power Purchase Obligation percentages, split across wind, solar, HPO, and "others" and totalled by year from 2017-18 to 2024-25 (p2). Third, paragraph 2 of Regulation 4.1 is substituted with a set of provisos governing how HPO may be met: eligibility of large hydro and pumped storage plants, a cap on the share of generated capacity counted and the number of years it counts for, free power and Local Area Development Fund treatment, exclusion of hydro imported from outside India, a Hydro Energy Certificate mechanism, use of State/discom free power towards HPO, cross-technology substitution when a technology shortfall occurs, and continuation of FY 2024-25 targets into FY 2025-26 and beyond unless the Commission specifies otherwise (p3–4).

Standard name
RPO Regulations
Primary topics
Renewable purchase obligation (RPO / RCO)

Read with this

Procedures and orders made under it

Proposed changes (drafts with no final yet)

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document