Skip to content

GERC · Gujarat Electricity Regulatory Commission

Procurement of Energy from Renewable Sources (First Amendment) Regulations, 2013 — Corrigendum to Draft Notification

GUJARAT ELECTRICITY REGULATORY COMMISSION (PROCUREMENT OF ENERGY FROM RENEWABLE SOURCES) (FIRST AMENDMENT) REGULATIONS, 2013

Corrigendum to a draftDated 20 Nov 2013

Corrigendum to a draft that is not on Voltaic.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

On 6 November 2013 the Gujarat Electricity Regulatory Commission issued a draft amendment to its 2010 regulations on procurement of energy from renewable sources — the (Procurement of Energy from Renewable Sources) (First Amendment) Regulations, 2013 — and published public notices in English and Gujarati newspapers the same day, inviting stakeholder comments by 8 December 2013 (p1).

This short corrigendum responds to a typographical error found, on verification of the record, on page 2 of that draft: in the substitution of Table 1 of Regulation 4.1 of the Principal Regulations, which carries the renewable purchase obligation percentages (p2). It sets out the corrected table, giving RPO percentages year by year from 2010-11 to 2016-17, split into total, wind, solar and 'others' (biomass, bagasse, MSW etc.) (p2). Paragraph 4 states that all other contents of the draft amended regulations dated 06.11.2013 remain unchanged (p2).

The corrigendum is signed by the Commission's Secretary and carries no date or number of its own (p1–2).

Standard name
RPO Regulations
Primary topics
Renewable purchase obligation (RPO / RCO)

Read with this

Procedures and orders made under it

Proposed changes (drafts with no final yet)

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document