GERC · Gujarat Electricity Regulatory Commission
Procurement of Energy from Renewable Sources Regulations, 2010
Gujarat Electricity Regularory Commission (Proculement of En.rgy from Renewable Sources) Regulations' 2010
RegulationDated 17 Apr 2010Notification No' 3 of 2010 dated l7 April,2010
Replaced by Procurement of Energy from Renewable Sources Regulations, 2025
See that regulation for the date it took effect and for anything it keeps in force.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Gujarat Electricity Regulatory Commission (Procurement of Energy from Renewable Sources) Regulations, 2010, issued as Notification No. 3 of 2010, create Gujarat’s renewable purchase obligation (RPO) framework. They are made under sections 61, 66, 86(1)(e) and 181 of the Electricity Act 2003 and extend to the whole State of Gujarat (p1). They bind distribution licensees and, once clause 8 is separately notified, captive and open access consumers using conventional captive plants of 5 MW and above or procuring conventional power through open access/third-party sale (p3, p5).
The operative core is clause 4: Table I sets year-wise minimum RPO percentages for 2010-11 to 2012-13, split between solar and non-solar sources; the Commission may revise targets; FY 2009-10 RPO is governed by the earlier Notification No. 15 of 2005; and the 2012-13 level continues beyond 2012-13 until revised (p3–4). Clause 5 treats CERC renewable energy certificates (RECs) as valid compliance instruments, with separate solar and non-solar certificate obligations and a 15-day deposit requirement with the Commission (p4). Clause 6 provides for a designated State Agency for accreditation, recommending projects for registration and quarterly compliance reporting (p4).
Clause 7 requires distribution licensees to estimate renewable purchases in tariff/ARR petitions, adjusts RPO for actual consumption, adds shortfalls to the next year while denying credit for excess purchases, and makes non-compliance liable to compensation (p4–5). Clause 8 applies the RPO to captive/open access consumers, requires annual data by 30 April, and allows REC-based compliance (p5). Clause 9 empowers the Commission to direct defaulting obligated entities to deposit an amount based on shortfall and CERC forbearance price into a separate fund, usable for RECs and RE evacuation infrastructure; it also provides carry-forward relief for genuine difficulty (p5). Clause 10 gives renewable generators open access irrespective of capacity, with grid connectivity per Indian/State Grid Codes and CEA prescriptions (p5–6). Clause 11 exempts third-party renewable sales from cross-subsidy surcharge but disallows banking and requires 15-minute ABT metering and set-off (p6). Clause 13 repeals the earlier 2005 regulation (p6).
Read with this
Amendments and corrections
Commencement notices and reasons
- Dated 17 Apr 2010Procurement of Energy from Renewable Sources Regulations, 2010 — Statement of Reasons
- Dated 1 Jul 2015Applicability of Procurement of Energy from Renewable Sources to Captive and Open Access Users — Notification No. 2 of 2015
- Dated 20 Apr 2018Procurement of Energy from Renewable Sources Regulations, 2010 — Second Amendment, 2018 — Statement of Reasons
- Dated 8 Apr 2022Procurement of Energy from Renewable Sources (Third Amendment) Regulations, 2022 — Statement of Reasons
Procedures and orders made under it
- Dated 16 Jul 2010Designating State Nodal Agency for REC, 2010
Proposed changes (drafts with no final yet)
- Dated 30 Sep 2024Procurement of Energy from Renewable Sources Regulations, 2024 — Draft
- Dated 30 Sep 2024Annexure or form: Appendix-I — RPO Compliance Format
Earlier drafts
- Dated 6 Nov 2013Gujarat Procurement of Energy from Renewable Sources (First Amendment) Regulations, 2013
- Dated 20 Nov 2013Procurement of Energy from Renewable Sources (First Amendment) Regulations, 2013 — Corrigendum to Draft Notification
- Dated 30 Jan 2022Procurement of Energy from Renewable Sources (Third Amendment) Regulations, 2022 — Draft
- Dated 30 Jan 2022Explanatory memorandum: Procurement of Energy from Renewable Sources (Third Amendment) Regulations, 2022 — Explanatory Memorandum — Draft
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.