Skip to content

GERC · Gujarat Electricity Regulatory Commission

Procurement of Energy from Renewable Sources (Second Amendment) Regulations, 2018

Gujarat Electricity Regulatory Commission (Procurement of Energy from Renewable Sources) (Second Amendment) Regulations, 201 8

AmendmentDated 20 Apr 2018No.01 of 2018

Replaced by Procurement of Energy from Renewable Sources Regulations, 2025

See that regulation for the date it took effect and for anything it keeps in force.

Amends the Procurement of Energy from Renewable Sources Regulations, 2010.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Second Amendment to the GERC (Procurement of Energy from Renewable Sources) Regulations, 2010 (the Principal Regulations). It substitutes the Renewable Purchase Obligation (RPO) table earlier introduced by the First Amendment Regulations, 2014 with two new tables (Tables I and II) covering FY 2010-11 through FY 2021-22, specifying minimum purchase percentages by source category — wind, solar, and others (biomass, bagasse, MSW and hydro) — and the total RPO (p1–2). It also substitutes paragraph 2 of Regulation 4.1 of the Principal Regulations, providing that where the minimum specified quantum from a given source is not available in a financial year, additional renewable energy from another source may be used to meet the total RPO (p2).

A new third paragraph is added to Regulation 4.1 requiring distribution licensees to compulsorily procure 100% of power produced from all Waste-to-Energy projects in Gujarat, in proportion to their total procurement from all sources, at tariffs discovered through competitive bidding under the Gujarat Waste to Energy Policy, 2016, subject to the ceiling of the Commission's generic tariff (p2).

The regulations extend to the whole of Gujarat and come into force from the date of publication in the Official Gazette (p1).

Standard name
RPO Regulations
Primary topics
Renewable purchase obligation (RPO / RCO), Renewable energy tariff

Read with this

Procedures and orders made under it

Proposed changes (drafts with no final yet)

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document