GERC · Gujarat Electricity Regulatory Commission
Procurement of Energy from Renewable Sources (Second Amendment) Regulations, 2018
Gujarat Electricity Regulatory Commission (Procurement of Energy from Renewable Sources) (Second Amendment) Regulations, 201 8
AmendmentDated 20 Apr 2018No.01 of 2018
Replaced by Procurement of Energy from Renewable Sources Regulations, 2025
See that regulation for the date it took effect and for anything it keeps in force.
Amends the Procurement of Energy from Renewable Sources Regulations, 2010.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Second Amendment to the GERC (Procurement of Energy from Renewable Sources) Regulations, 2010 (the Principal Regulations). It substitutes the Renewable Purchase Obligation (RPO) table earlier introduced by the First Amendment Regulations, 2014 with two new tables (Tables I and II) covering FY 2010-11 through FY 2021-22, specifying minimum purchase percentages by source category — wind, solar, and others (biomass, bagasse, MSW and hydro) — and the total RPO (p1–2). It also substitutes paragraph 2 of Regulation 4.1 of the Principal Regulations, providing that where the minimum specified quantum from a given source is not available in a financial year, additional renewable energy from another source may be used to meet the total RPO (p2).
A new third paragraph is added to Regulation 4.1 requiring distribution licensees to compulsorily procure 100% of power produced from all Waste-to-Energy projects in Gujarat, in proportion to their total procurement from all sources, at tariffs discovered through competitive bidding under the Gujarat Waste to Energy Policy, 2016, subject to the ceiling of the Commission's generic tariff (p2).
The regulations extend to the whole of Gujarat and come into force from the date of publication in the Official Gazette (p1).
Read with this
The regulation
- Dated 17 Apr 2010Procurement of Energy from Renewable Sources Regulations, 2010
Amendments and corrections
Commencement notices and reasons
- Dated 17 Apr 2010Procurement of Energy from Renewable Sources Regulations, 2010 — Statement of Reasons
- Dated 1 Jul 2015Applicability of Procurement of Energy from Renewable Sources to Captive and Open Access Users — Notification No. 2 of 2015
- Dated 20 Apr 2018Procurement of Energy from Renewable Sources Regulations, 2010 — Second Amendment, 2018 — Statement of Reasons
- Dated 8 Apr 2022Procurement of Energy from Renewable Sources (Third Amendment) Regulations, 2022 — Statement of Reasons
Procedures and orders made under it
- Dated 16 Jul 2010Designating State Nodal Agency for REC, 2010
Proposed changes (drafts with no final yet)
- Dated 30 Sep 2024Procurement of Energy from Renewable Sources Regulations, 2024 — Draft
- Dated 30 Sep 2024Annexure or form: Appendix-I — RPO Compliance Format
Earlier drafts
- Dated 6 Nov 2013Gujarat Procurement of Energy from Renewable Sources (First Amendment) Regulations, 2013
- Dated 20 Nov 2013Procurement of Energy from Renewable Sources (First Amendment) Regulations, 2013 — Corrigendum to Draft Notification
- Dated 30 Jan 2022Procurement of Energy from Renewable Sources (Third Amendment) Regulations, 2022 — Draft
- Dated 30 Jan 2022Explanatory memorandum: Procurement of Energy from Renewable Sources (Third Amendment) Regulations, 2022 — Explanatory Memorandum — Draft
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.