Summary
Summary written by software. Check the regulator's original before you rely on it.
The Explanatory Memorandum accompanies the draft Gujarat Electricity Regulatory Commission (Procurement of Energy from Renewable Sources) (Third Amendment) Regulations, 2022 and sets out the Commission's reasons for proposing it, together with an invitation to stakeholders to comment (p1, p4).
Paragraphs 1–2 trace the lineage of the parent regime — the 2010 principal Regulations (Notification No. 01 of 2010) and their First (2014) and Second (2018) Amendments — and state the immediate purpose: the Second Amendment's RPO trajectory runs only to FY 2021-22, so the Commission proposes to extend it to FY 2022-23 and FY 2023-24 (p1).
Paragraphs 3–4 give the policy backdrop: the Central Government's revised Tariff Policy notified on 28.01.2016 under s.3(3) of the Electricity Act, 2003, and its paragraph 6.4(1) on minimum renewable purchase percentages, the treatment of renewable purchase cost in tariff determination, and the Ministry of Power's role in prescribing the long-term RPO growth trajectory (p1–2).
Paragraphs 5–9 explain the trigger. MoP's office memorandum of 08.03.2019 declared large hydropower projects above 25 MW as renewable energy sources and created a Hydropower Purchase Obligation as a separate entity within the non-solar RPO, covering projects commissioned after that date and untied capacity; the memorandum also recounts hydro tariff-rationalisation measures. MoP Order 23/03/2016-R&R of 29.01.2021 then issued the RPO trajectory including HPO and asked SERCs to consider notifying it, and the Commission notes that several other SERCs have already adopted HPO. The MoP trajectory table is reproduced on p3.
Paragraphs 10–12 state the proposal — to specify HPO as a separate entity within the RPO and to notify a trajectory up to FY 2023-24 for HPO alongside wind, solar and other categories — and note that the draft amendment regulations are enclosed and comments are invited (p3–4).
Read with this
The regulation
- Dated 17 Apr 2010Procurement of Energy from Renewable Sources Regulations, 2010
Amendments and corrections
Commencement notices and reasons
- Dated 17 Apr 2010Procurement of Energy from Renewable Sources Regulations, 2010 — Statement of Reasons
- Dated 1 Jul 2015Applicability of Procurement of Energy from Renewable Sources to Captive and Open Access Users — Notification No. 2 of 2015
- Dated 20 Apr 2018Procurement of Energy from Renewable Sources Regulations, 2010 — Second Amendment, 2018 — Statement of Reasons
- Dated 8 Apr 2022Procurement of Energy from Renewable Sources (Third Amendment) Regulations, 2022 — Statement of Reasons
Procedures and orders made under it
- Dated 16 Jul 2010Designating State Nodal Agency for REC, 2010
Proposed changes (drafts with no final yet)
- Dated 30 Sep 2024Procurement of Energy from Renewable Sources Regulations, 2024 — Draft
- Dated 30 Sep 2024Annexure or form: Appendix-I — RPO Compliance Format
Earlier drafts
- Dated 6 Nov 2013Gujarat Procurement of Energy from Renewable Sources (First Amendment) Regulations, 2013
- Dated 20 Nov 2013Procurement of Energy from Renewable Sources (First Amendment) Regulations, 2013 — Corrigendum to Draft Notification
- Dated 30 Jan 2022Procurement of Energy from Renewable Sources (Third Amendment) Regulations, 2022 — Draft
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.