Skip to content

GERC · Gujarat Electricity Regulatory Commission

Procurement of Energy from Renewable Sources (Third Amendment) Regulations, 2022 — Explanatory Memorandum — Draft

Explanatory Memorandum

Explanatory memorandum to a draftDated 30 Jan 2022

Explanatory memorandum to the Procurement of Energy from Renewable Sources (Third Amendment) Regulations, 2022 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Explanatory Memorandum accompanies the draft Gujarat Electricity Regulatory Commission (Procurement of Energy from Renewable Sources) (Third Amendment) Regulations, 2022 and sets out the Commission's reasons for proposing it, together with an invitation to stakeholders to comment (p1, p4).

Paragraphs 1–2 trace the lineage of the parent regime — the 2010 principal Regulations (Notification No. 01 of 2010) and their First (2014) and Second (2018) Amendments — and state the immediate purpose: the Second Amendment's RPO trajectory runs only to FY 2021-22, so the Commission proposes to extend it to FY 2022-23 and FY 2023-24 (p1).

Paragraphs 3–4 give the policy backdrop: the Central Government's revised Tariff Policy notified on 28.01.2016 under s.3(3) of the Electricity Act, 2003, and its paragraph 6.4(1) on minimum renewable purchase percentages, the treatment of renewable purchase cost in tariff determination, and the Ministry of Power's role in prescribing the long-term RPO growth trajectory (p1–2).

Paragraphs 5–9 explain the trigger. MoP's office memorandum of 08.03.2019 declared large hydropower projects above 25 MW as renewable energy sources and created a Hydropower Purchase Obligation as a separate entity within the non-solar RPO, covering projects commissioned after that date and untied capacity; the memorandum also recounts hydro tariff-rationalisation measures. MoP Order 23/03/2016-R&R of 29.01.2021 then issued the RPO trajectory including HPO and asked SERCs to consider notifying it, and the Commission notes that several other SERCs have already adopted HPO. The MoP trajectory table is reproduced on p3.

Paragraphs 10–12 state the proposal — to specify HPO as a separate entity within the RPO and to notify a trajectory up to FY 2023-24 for HPO alongside wind, solar and other categories — and note that the draft amendment regulations are enclosed and comments are invited (p3–4).

Standard name
RPO Regulations
Primary topics
Renewable purchase obligation (RPO / RCO)

Read with this

Procedures and orders made under it

Proposed changes (drafts with no final yet)

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗