GERC · Gujarat Electricity Regulatory Commission
Procurement of Energy from Renewable Sources Regulations, 2024 — Draft
Gujarat Electricity Regulatory Commission (Procurement of Energy from Renewable Sources) Regulations, 2024
Draft regulationDated 30 Sep 2024
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The document presents GERC's proposed Gujarat Electricity Regulatory Commission (Procurement of Energy from Renewable Sources) Regulations, 2024, published as a draft for objections and suggestions (pp1–3). It says it is issued under the Electricity Act 2003, the Energy Conservation Act 2001 and related Central/Ministry of Power instruments, and it responds to CERC REC Regulations 2022 and the MoP RPPO trajectory (pp1–3). The notice gives 30 days from the date of notification to submit objections to the Secretary; the final page is dated 30/09/2024 (pp2, 19). It proposes to replace the 2010 GERC renewable procurement regulations and provides savings on repeal (p19).
Chapter 1 sets the short title, Gujarat-wide extent, commencement on Gazette publication, definitions and RPPO applicability. Obligated entities include designated consumers under the Energy Conservation Act, persons consuming conventional electricity through open access, and conventional captive plants above 100 kW, with retail consumers of a distribution licensee excluded for their retail consumption (pp3–6).
Regulation 4 sets annual RPPO percentages by category—wind, hydro, distributed renewable energy, other renewable energy and total—for each year from 2024-25 to 2029-30, plus a separate energy storage obligation. It defines eligible project vintage and treatment of wind/hydro/other categories, and prescribes how consumption is computed (pp7–10). Regulation 5 allows compliance through purchase, own generation, free power, banking, certificates, rooftop solar and green hydrogen/ammonia, and regulates shortfalls and offsets (pp11–12). Regulation 6 integrates CERC RECs and restricts accreditation where the distribution licensee is already offsetting RPPO (pp12–14).
Regulation 7 designates GEDA as State Agency and requires an RPPO web portal, with quarterly and annual reporting (pp14–15). Regulation 8 requires obligated entities to register and report online, and provides for verification and DISCOM disclosure (pp15–16). Regulation 9 requires compliance petitions and public disclosure, with different routes for entities above and below 1 MW (pp16–17). Regulation 10 imposes penalties, creates a fund and permits carry-forward; a second Regulation 10 deals with purchase under the REC mechanism and APPC rate (pp17–18). Regulations 11–16 provide overriding effect, difficulty removal, directions, inherent powers, repeal and savings, and interpretation (pp18–19).
Read with this
The regulation
- Dated 17 Apr 2010Procurement of Energy from Renewable Sources Regulations, 2010
Amendments and corrections
Commencement notices and reasons
- Dated 17 Apr 2010Procurement of Energy from Renewable Sources Regulations, 2010 — Statement of Reasons
- Dated 1 Jul 2015Applicability of Procurement of Energy from Renewable Sources to Captive and Open Access Users — Notification No. 2 of 2015
- Dated 20 Apr 2018Procurement of Energy from Renewable Sources Regulations, 2010 — Second Amendment, 2018 — Statement of Reasons
- Dated 8 Apr 2022Procurement of Energy from Renewable Sources (Third Amendment) Regulations, 2022 — Statement of Reasons
Procedures and orders made under it
- Dated 16 Jul 2010Designating State Nodal Agency for REC, 2010
Proposed changes (drafts with no final yet)
- Dated 30 Sep 2024Annexure or form: Appendix-I — RPO Compliance Format
Earlier drafts
- Dated 6 Nov 2013Gujarat Procurement of Energy from Renewable Sources (First Amendment) Regulations, 2013
- Dated 20 Nov 2013Procurement of Energy from Renewable Sources (First Amendment) Regulations, 2013 — Corrigendum to Draft Notification
- Dated 30 Jan 2022Procurement of Energy from Renewable Sources (Third Amendment) Regulations, 2022 — Draft
- Dated 30 Jan 2022Explanatory memorandum: Procurement of Energy from Renewable Sources (Third Amendment) Regulations, 2022 — Explanatory Memorandum — Draft
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.