Skip to content

GERC · Gujarat Electricity Regulatory Commission

Procurement of Energy from Renewable Sources Regulations, 2024 — Draft

Gujarat Electricity Regulatory Commission (Procurement of Energy from Renewable Sources) Regulations, 2024

Draft regulationDated 30 Sep 2024

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The document presents GERC's proposed Gujarat Electricity Regulatory Commission (Procurement of Energy from Renewable Sources) Regulations, 2024, published as a draft for objections and suggestions (pp1–3). It says it is issued under the Electricity Act 2003, the Energy Conservation Act 2001 and related Central/Ministry of Power instruments, and it responds to CERC REC Regulations 2022 and the MoP RPPO trajectory (pp1–3). The notice gives 30 days from the date of notification to submit objections to the Secretary; the final page is dated 30/09/2024 (pp2, 19). It proposes to replace the 2010 GERC renewable procurement regulations and provides savings on repeal (p19).

Chapter 1 sets the short title, Gujarat-wide extent, commencement on Gazette publication, definitions and RPPO applicability. Obligated entities include designated consumers under the Energy Conservation Act, persons consuming conventional electricity through open access, and conventional captive plants above 100 kW, with retail consumers of a distribution licensee excluded for their retail consumption (pp3–6).

Regulation 4 sets annual RPPO percentages by category—wind, hydro, distributed renewable energy, other renewable energy and total—for each year from 2024-25 to 2029-30, plus a separate energy storage obligation. It defines eligible project vintage and treatment of wind/hydro/other categories, and prescribes how consumption is computed (pp7–10). Regulation 5 allows compliance through purchase, own generation, free power, banking, certificates, rooftop solar and green hydrogen/ammonia, and regulates shortfalls and offsets (pp11–12). Regulation 6 integrates CERC RECs and restricts accreditation where the distribution licensee is already offsetting RPPO (pp12–14).

Regulation 7 designates GEDA as State Agency and requires an RPPO web portal, with quarterly and annual reporting (pp14–15). Regulation 8 requires obligated entities to register and report online, and provides for verification and DISCOM disclosure (pp15–16). Regulation 9 requires compliance petitions and public disclosure, with different routes for entities above and below 1 MW (pp16–17). Regulation 10 imposes penalties, creates a fund and permits carry-forward; a second Regulation 10 deals with purchase under the REC mechanism and APPC rate (pp17–18). Regulations 11–16 provide overriding effect, difficulty removal, directions, inherent powers, repeal and savings, and interpretation (pp18–19).

Standard name
RPO Regulations
Primary topics
Renewable purchase obligation (RPO / RCO), Energy storage obligation, Renewable energy certificates (REC)

Read with this

Procedures and orders made under it

Proposed changes (drafts with no final yet)

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document