Search the library
Filters
Showing the best matches for “energy storage obligation”: 10 documents. There may be more. Add words, or choose a regulator or a type, to narrow the search.
The state and topic filters do not apply to a word search yet; the regulator, document type and year filters do.
Ancillary Services Regulations, 2025
- 7. Eligibility for an SRAS Provider… for an SRAS Provider A generating station or an entity having energy storage resources or an entity capable of providing demand response, on a standalone or aggregated basis, connected to the intra-State transmission system, shall be …
- DEFINITIONS › 3. Definitions"Energy Storage" in relation to the electricity system, means a facility where electrical energy is converted into any other form of energy which can be stored, and subsequently reconverted into electrical energy; …
2 matching passages in this document
Indian Electricity Grid Code Regulations, 2023
1 amendment on Voltaic
- 30. FREQUENCY CONTROL AND RESERVES › Provided that… second for regional entity generating stations and energy storage systems and 10 (ten) seconds for the state control area. (o) The concerned RLDC shall calculate actual frequency response characteristics of all the control areas within …
- 30. FREQUENCY CONTROL AND RESERVES › (10) Primary ControlPrimary control is local automatic control in a generating unit or energy storage system or demand side resource for the purpose of adjusting its active power output or consumption, as the case may be, in response to frequency excursion. …
3 matching passages in this document
Karnataka Electricity Grid Code (KEGC), 2025
- Provided that… seconds for Intra state entity Generating Stations and energy storage systems. Higher resolution data from GT terminal shall be furnished by Generators to SLDC, which shall be verified by SLDC and same will be furnished to SRLDC. o. …
- 2.5.8 Role of Qualifying Co-ordinating Agency (QCA)… solar and hybrid generators including energy storage system connected to one or more pooling stations represented by it for the purpose of Grid Code in general and operational and scheduling liaison in particular. b. …
3 matching passages in this document
Generation Tariff Regulations, 2024
- [62.9 x S x SHR/ CVPF] x[85/LP]… beneficiaries shall be entitled to an equivalent energy of 75% of the energy utilized in pumping the water from the lower elevation reservoir to the higher elevation reservoir from the generating station during peak hours, …
- 66. Computation and Payment of Capacity Charge and Energy …… Computation and Payment of Capacity Charge and Energy Charge for Pumped Storage Hydro Generating Stations: (1) The fixed cost of a pumped storage hydro generating station shall be computed on an annual basis, based on norms specified …
3 matching passages in this document
Terms and Conditions of Tariff Regulations, 2024
2 amendments on Voltaic
- 71. Norms of Operation for Hydro Generating Stations: The …… beneficiaries shall be entitled to an equivalent energy of 75% of the energy utilized in pumping the water from the lower elevation reservoir to the higher elevation reservoir from the generating station during peak hours, …
- 66. Computation and Payment of Capacity Charge and Energy …… Computation and Payment of Capacity Charge and Energy Charge for Pumped Storage Hydro Generating Stations: (1) The fixed cost of a pumped storage hydro generating station shall be computed on an annual basis, based on norms specified …
3 matching passages in this document
Terms and Conditions of Tariff Regulations, 2014
- (d) Gas-based / Liquid-based thermal generating unit(s)/ … › (E) Auxiliary Energy Consumption… beneficiaries shall be entitled to equivalent energy of 75% of the energy utilized in pumping the water from the lower elevation reservoir to the higher elevation reservoir from the generating station during peak hours and the generating …
- 31. Computation and Payment of Capacity charge and Energy … › 32. Pumped Storage Hydro Generating StationsThe capacity charge payable to a pumped storage hydro generating station for a calendar month shall be: (AFC x NDM / NDY) (in Rupees), if actual Generation during the month is >= 75 % of the Pumping Energy consumed by the station during …
2 matching passages in this document
Connectivity and General Network Access to the inter-State Transmission System (Fourth Amendment) Regulations, 2026
Amends the Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022
- 10. Amendment to Regulation 5.8 of the Principal Regulations › Illustration… "Provided that in case the Applicant is an ESS (excluding Pumped Storage Plant (PSP)), the Bank Guarantee shall be Rs. 5 lakh/MW." 10.5. The words "or Renewable Power Park Developer," shall be inserted after the words "ESS (excluding …
- 4. Amendment to Regulation 4.1 of the Principal RegulationsThe words ", with a minimum energy capacity (in MWh) as twice the Power capacity (in MW) or as notified by the Authority as per system requirement." shall be added at the end of clause (c) of Regulation 4.1 of the Principal Regulations.
3 matching passages in this document
Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022
4 amendments on Voltaic
- 2. Definition › (ab) "Nodal Agency" means"Renewable Energy Generating Station" or "REGS" means a generating station based on a renewable source of energy with or without Energy Storage System and shall include Renewable Hybrid Generating Station; …
- 2. Definition(q) "Energy Storage System" or "ESS" in relation to the electricity system, means a facility where electrical energy is converted into any form of
2 matching passages in this document
Framework for Resource Adequacy Regulations, 2025
- Chapter-1 Preliminary › 4. Definitions… storage systems for energy shift, and demand response measures for managing the intermittency and variability of renewable energy sources l. "Short term" means one year for development of demand forecast, generation resource plan, and …
- Chapter- 3 Demand Assessment and Forecasting › 6. Long-term Demand Forecast… distributive energy resources, storage, and policies, which can impact econometric parameters, impact of national hydrogen mission etc. For each policy, a separate trajectory should be developed for each consumer category. 6.9. …
3 matching passages in this document
Merit Order Despatch and Optimization of Power Purchase Cost Regulations, 2024