CERC · Central Electricity Regulatory Commission
Terms and Conditions of Tariff Regulations, 2019
Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019
RegulationDated 7 Mar 2019In force from 1 Apr 2019No.L-1/236/2018/CERC dated 7th March, 2019
Replaced by Terms and Conditions of Tariff Regulations, 2024
See that regulation for the date it took effect and for anything it keeps in force.
Summary
Summary written by software, from pages 1 to 54 of 142. Check the regulator's original before you rely on it.
The Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 is the principal CERC tariff regulation for the 2019–24 control period. Issued on 7 March 2019, it comes into force on 1 April 2019 and is to remain in force for five years until 31 March 2024 unless reviewed earlier or extended (p1). It is made under section 178 read with section 61 of the Electricity Act, 2003 and applies where the Commission determines tariff under section 62 read with section 79 — principally inter-State generating stations and inter-State transmission systems, including associated communication systems (p1–3).
Chapter 1 (pp1–21) defines the scope exclusions and the regulatory vocabulary. Tariff-based competitively bid projects under section 63 and renewable energy projects covered by CERC’s 2017 RE Tariff Regulations are outside its scope (pp2–3). The definitions cover capital cost, additional capitalisation, change in law, COD, declared capacity, beneficiaries, integrated mines, landed fuel cost, PAF, PLF, useful life and many other terms; they also set separate treatment for auxiliary consumption linked to revised emission standards and sewage treatment (pp3–20).
Chapter 2 (pp22–26) deals with date of commercial operation. COD is determined under the Grid Code; where a transmission system is ready but an interconnected generator or another transmission system is not, the licensee may seek Commission approval with prior notice and a specified document set (pp22–23). Regulation 6 allocates transmission-charge liability when CODs of generation and transmission, or of two transmission systems, mismatch (pp23–25). Regulation 7 treats infirm power as deviation settled through the deviation settlement mechanism and applies revenue above fuel cost to capital cost (pp25–26).
Chapter 3 (pp27–37) is the procedural core. It requires consolidated tariff petitions for existing and new projects and allows part-capacity, expansion, emission-standard and integrated-mine cases (pp27–29). Applications for new projects are to be filed within the stated window after anticipated COD, with provisions for interim tariff based on management or auditor certificates (pp30–31). Existing projects are to file by 31 October 2019 along with true-up for 2014–19 (p31). The Commission may grant interim and final tariff after public objections and hearings; the chapter sets refund and recovery mechanics with interest for differences and for capital expenditure over- or under-shoots beyond a stated threshold (pp32–34). It provides for in-principle approval of additional capitalisation on change in law or force majeure above a stated expenditure threshold (pp34–35), true-up of 2014–19 under the 2014 regulations (p35), and true-up of 2019–24, including an interim true-up in 2021–22 if annual fixed cost rises beyond a stated percentage (pp35–37).
Chapter 4 (pp38–40) sets the tariff structure: two-part capacity and energy charges for thermal stations; capacity and energy charges for hydro; transmission charges for ISTS. It lists the components of annual fixed cost and energy charge, and provides special treatment for thermal stations that have completed 25 years from COD (pp38–40).
Chapters 5–7 (pp41–54) deal with capital. Chapter 5 sets debt-equity principles for new and existing projects, including treatment of excess equity as normative loan and DVC-specific governance (pp41–42). Chapter 6 governs computation of capital cost: inclusions, exclusions, prudence check, IDC/IEDC, controllable and uncontrollable factors, and initial-spares ceilings by asset type (pp43–51). Chapter 7, supplied only up to page 54, begins the rules for additional capitalisation within the original scope before and after cut-off date and beyond original scope, subject to prudence check (pp52–54).
Several later chapters are referenced but not supplied: Chapter 9 on input price for integrated mines, Chapter 11 on tariff computation, and Regulations 44 and 45 on hydro tariff derivation (pp28, 38, 31–32).
Read with this
Amendments and corrections
- Dated 15 Mar 2019Terms and Conditions of Tariff Regulations, 2019 — Corrigendum
- Dated 18 Sep 2019Terms and Conditions of Tariff Regulations, 2019 — Corrigendum
- Dated 25 Aug 2020Terms and Conditions of Tariff (First Amendment) Regulations, 2020
- Dated 19 Feb 2021Terms and Conditions of Tariff Regulations, 2019 — Second Amendment, 2021
- Dated 15 Dec 2023Terms and Conditions of Tariff Regulations, 2019 — Third Amendment, 2023
Commencement notices and reasons
- Dated 22 Mar 2019Terms and Conditions of Tariff Regulations, 2019 — Statement of Objects and Reasons
- Dated 2 Feb 2021Terms and Conditions of Tariff (First Amendment) Regulations, 2020 — Statement of Objects and Reasons
- Published in the Gazette 19 Feb 2021Terms and Conditions of Tariff (Second Amendment) Regulations, 2021 — Statement of Objects & Reasons
- Dated 15 Dec 2023Terms and Conditions of Tariff (Third Amendment) Regulations, 2023 — Statement of Reasons
Procedures and orders made under it
Other copies of these documents (3)
Proposed changes (drafts with no final yet)
- Dated 10 Sep 2023Terms and Conditions of Tariff (Fourth Amendment) Regulations, 2023 — Draft
- Dated 10 Sep 2023Public notice: Draft Terms and Conditions of Tariff (Fourth Amendment) Regulations, 2023 — Public Notice
- Released with the notice dated 10 Sep 2023Explanatory memorandum: Terms and Conditions of Tariff Regulations, 2019 — Fourth Amendment, 2023 — Explanatory Memorandum — Draft
- Dated 5 Oct 2023Hearing notice: Public hearing notice on Draft Terms and Conditions of Tariff (Fourth Amendment) Regulations, 2023
Earlier drafts
- Dated 14 Dec 2018Terms and Conditions of Tariff Regulations, 2019 — Draft
- Dated 14 Dec 2018Public notice: Public Notice on Draft Terms and Conditions of Tariff Regulations, 2019 — tariff period 1.4.2019 to 31.3.2024
- Dated 7 Jan 2019Notice extending the date for comments: Draft Terms and Conditions of Tariff Regulations, 2019 — Public Notice Extending Comments Deadline and Public Hearing, January 2019
- Dated 1 Apr 2020Terms and Conditions of Tariff (First Amendment) Regulations, 2020 — Draft
- Dated 20 Feb 2019Annexure or form: CEA Recommendations on Operation Norms for Thermal Generating Stations — DeSOx/DeNOx, Tariff Period 2019-24
- Released with the notice dated 1 Apr 2020Explanatory memorandum: Draft Terms and Conditions of Tariff (First Amendment) Regulations, 2020 — Explanatory Memorandum
- Dated 1 Apr 2020Public notice: Draft Terms and Conditions of Tariff (First Amendment) Regulations, 2020 — Public Notice
- Released with the notice dated 1 Apr 2020Annexure or form: Terms and Conditions of Tariff (First Amendment) Regulations, 2020 — Appendix II: CEA Supporting Details on Part-Load Heat Rate and DeSOx/DeNOx Norms — Draft
- Dated 30 Apr 2020Notice extending the date for comments: Terms and Conditions of Tariff (First Amendment) Regulations, 2020 — Comment Deadline Extension Notice
- Dated 1 Jun 2020Terms and Conditions of Tariff (Second Amendment) Regulations, 2020 — Draft
- Released with the notice dated 1 Jun 2020Annexure or form: Tariff Filing Forms (Integrated Mine) for Determination of Input Price — Part IV — Draft
- Dated 1 Jun 2020Public notice: Draft Terms and Conditions of Tariff (Second Amendment) Regulations, 2020 — Public Notice
- Released with the notice dated 1 Jun 2020Explanatory memorandum: Terms and Conditions of Tariff, 2019 — Second Amendment, 2020 — Explanatory Memorandum — Draft
- Dated 30 Jun 2020Notice extending the date for comments: Draft Terms and Conditions of Tariff (Second Amendment) Regulations, 2020 — Comment Deadline Extension Public Notice
- Dated 15 Jul 2020Hearing notice: Draft Terms and Conditions of Tariff (Second Amendment) Regulations, 2020 — public hearing notice
- Dated 6 Sep 2022Terms and Conditions of Tariff (Third Amendment) Regulations, 2022 — Draft
- Released with the notice dated 6 Sep 2022Explanatory memorandum: Terms and Conditions of Tariff (Third Amendment) Regulations, 2022 — Explanatory Memorandum — Draft
- Dated 6 Sep 2022Public notice: Terms and Conditions of Tariff (Third Amendment) Regulations, 2022 — Public Notice on Draft
- Dated 9 Nov 2022Hearing notice: Public hearing notice on Draft Terms and Conditions of Tariff (Third Amendment) Regulations, 2022
8 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft and 4 drafts or notices on a draft not held as English text.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.