CERC · Central Electricity Regulatory Commission
Terms and Conditions of Tariff Regulations, 2014
Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014
RegulationDated 21 Feb 2014In force from 1 Apr 2014No.L-1/144/2013/CERC.- dated 21, February, 2014
Replaced by Terms and Conditions of Tariff Regulations, 2019
See that regulation for the date it took effect and for anything it keeps in force.
Summary
Summary written by software, from pages 1 to 55 of 145. Check the regulator's original before you rely on it.
The document is the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014, notified on 21 February 2014 under s.178 read with s.61 of the Electricity Act 2003 (p1). It comes into force on 1.4.2014 and, unless reviewed earlier or extended, remains in force for five years to 31.3.2019 (p1). It applies where CERC must determine tariff for a generating station/unit or an inter-State transmission system/element, including communication system, under s.62 read with s.79; it excludes tariff discovered through s.63 competitive bidding and renewable sources covered by the 2012 RE tariff regulations (p2–3).
Chapter 1 (pp1–20) sets commencement, scope, exclusions and a long list of definitions, including useful life by asset class, change in law, cut-off date, COD, force majeure, prudence check and DICs (p3–20). Chapter 2 (pp21–25) specifies how the date of commercial operation is determined for thermal, hydro, transmission and communication assets, and defines trial run and trial operation (p21–25). Chapter 3 (pp26–37) governs tariff determination procedure: filing for whole station/stage/unit or transmission element, consolidated petitions for existing and new projects, application timelines, handling of deficient petitions, provisional tariff based on projected costs, and truing up. It distinguishes controllable parameters (station heat rate, secondary fuel oil, auxiliary consumption, refinancing) from uncontrollable parameters (force majeure, change in law, primary fuel cost) and provides for sharing/pass-through of gains and losses, with refund/recovery and interest (p33–37).
Chapter 4 (pp38–55) covers capital cost and capital structure: capital cost principles for new and existing projects, exclusions, prudence check, IDC/IEDC computation, controllable/uncontrollable factors in cost escalation, ceiling norms for initial spares, additional capitalisation/decapitalisation, R&M, special allowance for coal/lignite stations, compensation allowance and sale of infirm power (p38–55).
Read with this
Amendments and corrections
Commencement notices and reasons
Other copies of these documents (2)
Earlier drafts
- Dated 25 Jun 2013Terms and Conditions of Tariff from 1.4.2014 — Public Notice
- Dated 24 Jul 2013Terms and Conditions of Tariff for the tariff period from 1.4.2014 — Public Notice extending comment deadline to 14.08.2013
- Dated 6 Dec 2013Draft Terms and Conditions of Tariff Regulations, 2014 (tariff period 1.4.2014 to 31.3.2019) — Public Notice
- Dated 6 Dec 2013Terms and Conditions of Tariff Regulations, 2014 — Draft
- Dated 4 Jun 2015Terms and Conditions of Tariff (First Amendment) Regulations, 2015 — Draft
- Released with the notice dated 4 Jun 2015Explanatory memorandum: Explanatory Memorandum to Draft Terms and Conditions of Tariff (First Amendment) Regulations, 2015
- Dated 4 Jun 2015Public notice: Public Notice on Draft Terms and Conditions of Tariff Regulations, 2014
- Dated 28 Apr 2017Terms and Conditions of Tariff (Second Amendment) Regulations, 2017
- Released with the notice dated 28 Apr 2017Explanatory memorandum: Draft Terms and Conditions for Tariff (Second Amendment) Regulations, 2017 — Explanatory Memorandum
- Dated 28 Apr 2017Public notice: Draft Terms and Conditions of Tariff (Second Amendment) Regulations, 2017 — Public Notice
2 more documents belong here and are not on Voltaic: 1 consultation paper and 1 draft or notice on a draft.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.