Skip to content

CERC · Central Electricity Regulatory Commission

Terms and Conditions of Tariff Regulations, 2014

Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014

RegulationDated 21 Feb 2014In force from 1 Apr 2014No.L-1/144/2013/CERC.- dated 21, February, 2014

Replaced by Terms and Conditions of Tariff Regulations, 2019

See that regulation for the date it took effect and for anything it keeps in force.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software, from pages 1 to 55 of 145. Check the regulator's original before you rely on it.

The document is the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014, notified on 21 February 2014 under s.178 read with s.61 of the Electricity Act 2003 (p1). It comes into force on 1.4.2014 and, unless reviewed earlier or extended, remains in force for five years to 31.3.2019 (p1). It applies where CERC must determine tariff for a generating station/unit or an inter-State transmission system/element, including communication system, under s.62 read with s.79; it excludes tariff discovered through s.63 competitive bidding and renewable sources covered by the 2012 RE tariff regulations (p2–3).

Chapter 1 (pp1–20) sets commencement, scope, exclusions and a long list of definitions, including useful life by asset class, change in law, cut-off date, COD, force majeure, prudence check and DICs (p3–20). Chapter 2 (pp21–25) specifies how the date of commercial operation is determined for thermal, hydro, transmission and communication assets, and defines trial run and trial operation (p21–25). Chapter 3 (pp26–37) governs tariff determination procedure: filing for whole station/stage/unit or transmission element, consolidated petitions for existing and new projects, application timelines, handling of deficient petitions, provisional tariff based on projected costs, and truing up. It distinguishes controllable parameters (station heat rate, secondary fuel oil, auxiliary consumption, refinancing) from uncontrollable parameters (force majeure, change in law, primary fuel cost) and provides for sharing/pass-through of gains and losses, with refund/recovery and interest (p33–37).

Chapter 4 (pp38–55) covers capital cost and capital structure: capital cost principles for new and existing projects, exclusions, prudence check, IDC/IEDC computation, controllable/uncontrollable factors in cost escalation, ceiling norms for initial spares, additional capitalisation/decapitalisation, R&M, special allowance for coal/lignite stations, compensation allowance and sale of infirm power (p38–55).

Standard name
Tariff Regulations
Primary topics
Tariff determination, Generation tariff, Transmission tariff

Read with this

Other copies of these documents (2)

2 more documents belong here and are not on Voltaic: 1 consultation paper and 1 draft or notice on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.