Connectivity and General Network Access to the inter-State Transmission System (Fourth Amendment) Regulations, 2026

Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) (Fourth Amendment) Regulations, 2026

AmendmentDated 11 Nov 2026No. L-1/261/2021/CERC dated 11.11.2026

Amends the Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CERC's Fourth Amendment to its 2022 Connectivity and General Network Access (GNA) Regulations, issued on 11 November 2026 (p1) and expressed to take effect from the date of publication in the Official Gazette (p1). It is a long, dense, largely technical amendment — 33 amending sections — whose centre of gravity is the surety and "route" architecture through which generators, renewable energy generating stations (REGS) and energy storage systems (ESS) obtain, hold and exit inter-State connectivity.

Sections 2 and 10 rework the vocabulary and machinery of Regulation 5.8: new definitions of Land BG, Land BG route, Land route and LoA/PPA route (p1–2); permission for sub-lease documents within a parent/subsidiary group or under Government policy (p5, p6); a detailed scheme for multi-located REGS holding a single LoA or PPA across States, including how LoA quantum is exhausted first at a location and how the balance may be sought against land (p5–6); and a separate bank-guarantee rate for ESS other than pumped storage (p7).

Section 3 (p2) creates an all-or-nothing exit: an entity may withdraw its full connectivity quantum — partial withdrawal is not permitted — within 45 days of final grant, or within 45 days of two years lapsing from in-principle grant, with bank guarantees returned and the application fee forfeited. Section 6 (p3) opens non-solar-hour connectivity at additional substations to REGS or ESS of 50 MW and above, individually or in aggregate through a Lead Generator/Lead ESS, and allows conversion between full-day, solar-hour and non-solar-hour applications.

Section 8 (p3–4) inserts application fees and a set of rules on "additional capacity" alongside an existing grantee — including ESS-co-located REGS, and the consequence for additional capacity when the original grantee relinquishes or is revoked. Section 16 (p9–11) rewrites Regulation 11A obligations on land and financial closure documents, route conversion, and who may satisfy conditions subsequent. Section 15 (p8–9) moves the pre-connectivity milestone from 18 to 6 months and prices second changes of source and land parcel, with a worked illustration.

Sections 20 and 29 (p12, p15) replace the five-year staggered release of Conn-BGs with a single return one week after one year from COD or GNA effectiveness, and Section 31 (p16–17) grants transition relief to entities whose year has already run. Sections 19 and 26 add transfer mechanics for connectivity and for GNA following sale of a plant, ESS or load (p11–12, p14–15). Section 22 (p12–13) permits dual connection — ISTS plus intra-State transmission or distribution — for drawee entities. Section 13 (p7–8) prescribes when the nodal agency must close an application and refund fees and guarantees; Section 33 (p17–18) sets out how Regulation 4.7 applications are processed without ISTS augmentation. Section 32 (p17) requires the nodal agency to revise detailed procedures within 60 days.

Standard name
Connectivity and GNA Regulations
Primary topics
Connectivity and GNA, Open access charges, Energy storage deployment

Read with this

Procedures and orders made under it

Consolidated copies, for reference (1)

Other copies of these documents (5)

Earlier drafts

16 more documents belong here and are not on Voltaic: 12 drafts or notices on a draft not held as English text and 4 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗