Terms and Conditions for Determination of Transmission Tariff (Third Amendment) Regulations, 2023 — Draft

Himachal Pradesh Electricity Regulatory Commission HPERC (Terms and Conditions for Determination of Transmission Tariff) (Third Amendment) Regulations, 2023

Draft amendmentDated 10 Apr 2023No. HPERC-F(1)-3/2018 dated the 10th April, 2023

Draft

A proposal that has since been finalised as the Transmission Tariff Regulations, 2011 — Third Amendment, 2023.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a consultation notice from the Himachal Pradesh Electricity Regulatory Commission, dated 10 April 2023, publishing a draft Third Amendment to the HPERC (Terms and Conditions for Determination of Transmission Tariff) Regulations, 2011 (pp1–2). Objections or suggestions must reach the Secretary by 18 May 2023, and the draft will be taken up after thirty days from its publication in the Rajpatra (p2).

The preamble explains why: the National Tariff Policy requires intra-state transmission to be developed through competitive bidding above a threshold that the State Commission decides, and the Commission notified that threshold — Rs. 45 Crore — on 21 May 2022. The 2011 regulations therefore need to be aligned (p1).

The draft regulation has two clauses (pp2–3). Clause 1 gives the short title and says the regulations are deemed to have come into force from 21 May 2022, i.e. backdated to the threshold notification. Clause 2 substitutes the sub-regulation on adoption of tariff: where tariff has been determined through transparent bidding per Central Government guidelines, the Commission shall adopt it; the first proviso requires intra-state transmission projects above Rs. 45 Crore — a transmission line, a substation, or both as a package — to be developed through Tariff Based Competitive Bidding under State Government guidelines; the second proviso lets the State Government or the Transmission Licensee take a cost-plus route above the threshold only with the Commission's prior approval.

Standard name
Transmission Tariff Regulations
Primary topics
Transmission tariff, Competitive bidding, Tariff determination

Read with this

The regulation

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.