Skip to content

HPERC · Himachal Pradesh Electricity Regulatory Commission

Intra-State Transmission TBCB Threshold Notification, Himachal Pradesh, 2022

Notification w.r.t Development of Intra-State Transmission System through Tariff Based Competitive Bidding Process in the State of Himachal Pradesh

OrderDated 21 May 2022No. HPERC-H(1)-3/2021. dated the 21st May, 2022

Replaced by Transmission Tariff Regulations, 2023

See that regulation for the date it took effect and for anything it keeps in force.

Made under the Transmission Tariff Regulations, 2011.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal- (a) anything done or any action taken or purported to have been done or taken under the repealed Regulations shall, in so far as it is not inconsistent with the provisions of these Regulations, be deemed to have been done or taken under the corresponding provisions of these Regulations;”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a single-page HPERC notification (p1) that fixes the size cut-off at which new intra-state transmission works in Himachal Pradesh must be procured competitively rather than built by the incumbent utility. The Commission determines a threshold of `Rs. 45 Crore` above which every intra-state transmission project — a transmission line, a sub-station, or both as a package where the line is associated with the sub-station — has to be developed through Tariff Based Competitive Bidding, following guidelines to be issued by the State Government (p1).

The notification takes effect from the date it is published in the Rajpatra, Himachal Pradesh; that Gazette date is not printed here (p1). It also directs the State Transmission Utility to approach the State Government so those bidding guidelines are framed within three months of the notification (p1).

The operative content is therefore narrow: a threshold, a scope definition, an applicability date and a rule-making instruction. The detailed bidding procedure itself lives in the State Government guidelines, which did not yet exist when this was issued.

Standard name
Tariff Policy
Primary topics
Competitive bidding

Read with this

The regulation

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document