Transmission Tariff Regulations, 2011

Himachal Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Transmission Tariff) Regulations, 2011

RegulationDated 1 Apr 2011No. HPERC/Trans/479. dated 1st April 2011

Replaced by Transmission Tariff Regulations, 2023

See that regulation for the date it took effect and for anything it keeps in force.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal- (a) anything done or any action taken or purported to have been done or taken under the repealed Regulations shall, in so far as it is not inconsistent with the provisions of these Regulations, be deemed to have been done or taken under the corresponding provisions of these Regulations;”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Himachal Pradesh Electricity Regulatory Commission's principal cost-plus regulation for determining transmission tariffs in the State. Issued as Notification No. HPERC/Trans/479 from Shimla on 1 April 2011, it comes into force with effect from 1 April 2011 (p2) and extends to the whole of Himachal Pradesh. It replaces the 2007 transmission tariff regulations, whose tariff order for the control period ending 31 March 2011 is carried forward (pp1, 29). The Commission states it is aligning with the Central Commission's 2009 Tariff Regulations and the National Tariff Policy, with the next control period beginning 1 April 2011 (p1).

Part-I (pp2–6) sets the short title, extent and commencement, the scope — capital-cost-based transmission tariffs determined by the Commission under section 62 read with section 86 — and a long list of definitions, including ARR, control period, availability, the three classes of transmission customer, cut-off date, date of commercial operation, change in law and useful life.

Part-II (pp7–10) is the guiding-principles part: general approach, the multi-year tariff framework with business plans and performance trajectories, determination of baseline values, approval of capital investment plans and renovation/modernisation proposals, the list of controllable parameters, the true-up rules (O&M surpluses and deficits staying with the licensee; capital, depreciation and financing costs trued up at the end of the control period), and the normative annual transmission system availability targets that govern recovery of full transmission charges.

Part-VI (pp27–29) covers miscellaneous matters: sharing of CDM carbon-credit proceeds with beneficiaries, non-recovery of income tax given a pre-tax return on equity (with deferred tax liability up to 31 March 2011 recoverable directly), foreign-exchange hedging and its direct recovery from users, transitory provisions, issue of orders and practice directions, removal of difficulties, relaxation and inherent powers, interpretation, enquiry, and repeal and savings. Appendix I (pp30–31) gives the asset-wise depreciation schedule; Appendix II (pp32–33) gives the monthly transmission-system availability factor formula and the outages deemed to be available.

Standard name
Transmission Tariff Regulations, Multi Year Tariff Regulations
Primary topics
Transmission tariff, Tariff determination, Multi Year Tariff (MYT)

Read with this

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document