Transmission Licensee ARR & Tariff Filing Formats

INDEX OF REGULATORY COMPLIANCE FORMATS FOR ARR & TARIFF FILING BY TRANSMISSION LICENSEE

OrderDated 30 Nov 2016

Replaced by Transmission Tariff Regulations, 2023

See that regulation for the date it took effect and for anything it keeps in force.

Made under the Transmission Tariff Regulations, 2011.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal- (a) anything done or any action taken or purported to have been done or taken under the repealed Regulations shall, in so far as it is not inconsistent with the provisions of these Regulations, be deemed to have been done or taken under the corresponding provisions of these Regulations;”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This document is the pack of blank compliance formats a transmission licensee must fill in and file with its Annual Revenue Requirement (ARR) and tariff petition. Page 1 is an index of 36 formats in three blocks — Summary (S1–S4), Financial (F1–F18) and Performance (P1–P9) — followed by a key to the year labels PY (previous year), PY1, PY2, CY (current year) and CP (control period). The "Instructions for the Transmission Licensee" on the same page are blank in this text; only the abbreviation key survives (p1).

The summary block (S1–S4, pp2–5) asks for a whole-licensee ARR build-up — receipts, expenditure heads, reasonable return, other income, ARR, and the resulting surplus or shortfall before and after tariff revision — across two previous years, the current year and four control-period years (p2); it also states a post-tax return on equity of 14% (p3), an energy balance by source of supply and category of sale (p4), and a transmission-asset register listing lines and substations by voltage class with bays, transformation capacity, date of commercial operation and whether the element is covered in the present petition (p5).

The financial block (F1–F18, pp6–30) is the bulk. It breaks O&M into repair & maintenance, employee cost with headcount, and administration & general charges (pp6–10); sets out fixed assets and depreciation with separate gross, provision and net columns (p11); and prescribes a financing pack — domestic loans and bonds by lender, project-specific loans, foreign loans with drawdown, repayment and hedging schedules, weighted-average interest on actual loans, a drawdown schedule for IDC and financing charges, and allocation of corporate loans to projects (pp12–17). It then covers capitalised expenses, consumer contributions and grants, scheme-wise capital expenditure by voltage class, capital works in progress, working capital, admitted capital cost for existing projects, capital cost estimates and commissioning schedules for new ones, element-wise cost break-up, financing up to COD, additional capitalisation after COD and its financing, and share capital/reserves/net worth (pp18–30).

The performance block (P1–P9, pp31–40) collects voltage-level transmission losses, metering status by interface category, voltage profile at selected substations, frequency excursions, feeder and transformer outages, transformer failures, major grid disturbances, electrical accidents and peak demand (pp31–40).

Every format is organised by fiscal-year columns, is to be filed region-, project- and element-wise, and repeats the identification block "Name of Region / Project / Transmission Element".

Standard name
Multi Year Tariff Regulations
Primary topics
Transmission tariff, ARR and true-up, Tariff determination

Read with this

The regulation

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.