HPERC · Himachal Pradesh Electricity Regulatory Commission
Transmission Licensee ARR & Tariff Filing Formats
INDEX OF REGULATORY COMPLIANCE FORMATS FOR ARR & TARIFF FILING BY TRANSMISSION LICENSEE
OrderDated 30 Nov 2016
Replaced by Transmission Tariff Regulations, 2023
See that regulation for the date it took effect and for anything it keeps in force.
Made under the Transmission Tariff Regulations, 2011.
Saving clause of the regulation that replaces it: “Notwithstanding such repeal- (a) anything done or any action taken or purported to have been done or taken under the repealed Regulations shall, in so far as it is not inconsistent with the provisions of these Regulations, be deemed to have been done or taken under the corresponding provisions of these Regulations;”
Summary
Summary written by software. Check the regulator's original before you rely on it.
This document is the pack of blank compliance formats a transmission licensee must fill in and file with its Annual Revenue Requirement (ARR) and tariff petition. Page 1 is an index of 36 formats in three blocks — Summary (S1–S4), Financial (F1–F18) and Performance (P1–P9) — followed by a key to the year labels PY (previous year), PY1, PY2, CY (current year) and CP (control period). The "Instructions for the Transmission Licensee" on the same page are blank in this text; only the abbreviation key survives (p1).
The summary block (S1–S4, pp2–5) asks for a whole-licensee ARR build-up — receipts, expenditure heads, reasonable return, other income, ARR, and the resulting surplus or shortfall before and after tariff revision — across two previous years, the current year and four control-period years (p2); it also states a post-tax return on equity of 14% (p3), an energy balance by source of supply and category of sale (p4), and a transmission-asset register listing lines and substations by voltage class with bays, transformation capacity, date of commercial operation and whether the element is covered in the present petition (p5).
The financial block (F1–F18, pp6–30) is the bulk. It breaks O&M into repair & maintenance, employee cost with headcount, and administration & general charges (pp6–10); sets out fixed assets and depreciation with separate gross, provision and net columns (p11); and prescribes a financing pack — domestic loans and bonds by lender, project-specific loans, foreign loans with drawdown, repayment and hedging schedules, weighted-average interest on actual loans, a drawdown schedule for IDC and financing charges, and allocation of corporate loans to projects (pp12–17). It then covers capitalised expenses, consumer contributions and grants, scheme-wise capital expenditure by voltage class, capital works in progress, working capital, admitted capital cost for existing projects, capital cost estimates and commissioning schedules for new ones, element-wise cost break-up, financing up to COD, additional capitalisation after COD and its financing, and share capital/reserves/net worth (pp18–30).
The performance block (P1–P9, pp31–40) collects voltage-level transmission losses, metering status by interface category, voltage profile at selected substations, frequency excursions, feeder and transformer outages, transformer failures, major grid disturbances, electrical accidents and peak demand (pp31–40).
Every format is organised by fiscal-year columns, is to be filed region-, project- and element-wise, and repeats the identification block "Name of Region / Project / Transmission Element".
Read with this
The regulation
- Dated 1 Apr 2011Transmission Tariff Regulations, 2011
Amendments and corrections
Commencement notices and reasons
Procedures and orders made under it
- Dated 2 Apr 2011Multi Year Control Period Notification for the Transmission Licensee, 2011
- Dated 2 Apr 2011Formats for Multi Year Tariff Filings by the Transmission Licensee Order, 2011
- Dated 1 Nov 2013Formats for Multi Year Tariff Filings by the Transmission Licensee Order, 2013
- Dated 30 Nov 2016Transmission Licensee ARR & Tariff Filing Formats
- Dated 21 May 2022Himachal Pradesh Intra-State Transmission TBCB Threshold Order, 2022
- Dated 21 May 2022Intra-State Transmission TBCB Threshold Notification, Himachal Pradesh, 2022
- Dated 2 Dec 2023Fixation of Multiyear Control Period, 2023
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.