Himachal Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Transmission Tariff) (First Amendment) Regulations, 2013

AmendmentDated 1 Nov 2013No. HPERC/F(5)(3)(1)(Trans).- dated 1stNovember, 2013

Replaced by Transmission Tariff Regulations, 2023

See that regulation for the date it took effect and for anything it keeps in force.

Amends the Transmission Tariff Regulations, 2011.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal- (a) anything done or any action taken or purported to have been done or taken under the repealed Regulations shall, in so far as it is not inconsistent with the provisions of these Regulations, be deemed to have been done or taken under the corresponding provisions of these Regulations;”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the First Amendment to the HPERC (Terms and Conditions for Determination of Transmission Tariff) Regulations, 2011, issued by the Himachal Pradesh Electricity Regulatory Commission at Shimla on 1 November 2013 (p1). It was made ahead of the Commission's exercise to determine transmission tariff for the control period starting 1 April 2014, and it comes into force on Rajpatra publication — a date the text does not print — and applies to tariff orders for control periods commencing 1 April 2014 and thereafter (p1).

The amendment rewrites fifteen regulations of the 2011 parent. It redefines the tariff vocabulary — "existing project" and a new "mid-term performance review" — and widens the voltage band that defines the transmission system to high and extra high voltage lines of 33 kV and above (p1). Regulation 7 is changed so the capital investment plan is set with the distribution licensee also in view, and so that approved capex and capitalisation are not revisited mid-period except at the mid-term review and end-of-period true up (p2). Regulation 10 on true up is replaced wholesale, fixing when true ups happen and the principles applied, including that O&M surpluses and deficits stay with the licensee and that force majeure, change-in-law and tax effects pass through as ARR charge or rebate (p2–3).

Regulation 13 gains a new sub-regulation (1-a) on O&M norms — how employee, R&M and A&G trajectories are to be proposed, what is excluded, and what is allowed over and above the norm — together with a replaced sub-regulation (3) giving the O&M expense formula and the definition of each term in it (p3–5). Further amendments cover capital cost treatment for existing projects (reg 14), disallowance of minor asset purchases after the cut-off date (reg 16), grossing up of return on equity and a changed illustration figure (reg 19), the switch of working-capital and loan interest benchmarks to SBI Base Rate plus basis points (regs 22, 26), a substituted safety-standards regulation requiring a safety manual and CEA compliance (reg 30), and a proviso letting the Commission change transmission pricing mid-period to follow CERC's framework (reg 31) (p5–6).

Filing and review machinery is reworked: business plan and tariff application timing (regs 37, 38), and a substituted regulation 39 setting out the scope of the mid-term performance review and the comprehensive review at the end of the control period, including a comparison against approved forecasts and possible revision of principles for the next period (p6–7). Regulation 43's proviso date is replaced with "the end of previous control period" (p8).

Standard name
Transmission Tariff Regulations, Multi Year Tariff Regulations
Primary topics
Transmission tariff, Tariff determination, Multi Year Tariff (MYT)

Read with this

The regulation

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document