HPERC · Himachal Pradesh Electricity Regulatory Commission
Multi Year Control Period Notification for the Transmission Licensee, 2011
Notification of Multi Year Control Period for the Transmission Licencee
OrderDated 2 Apr 2011No. HPERC/Trans/479 dated 02.04.2011
Replaced by Transmission Tariff Regulations, 2023
See that regulation for the date it took effect and for anything it keeps in force.
Made under the Transmission Tariff Regulations, 2011.
Saving clause of the regulation that replaces it: “Notwithstanding such repeal- (a) anything done or any action taken or purported to have been done or taken under the repealed Regulations shall, in so far as it is not inconsistent with the provisions of these Regulations, be deemed to have been done or taken under the corresponding provisions of these Regulations;”
Summary
Summary written by software. Check the regulator's original before you rely on it.
HPERC's Shimla office issued this single-clause notification on 2 April 2011 fixing the multi-year control period for transmission tariff determination in Himachal Pradesh (p1). Acting under clause (16) of regulation 3 of the HPERC (Terms and Conditions for Determination of Transmission Tariff) Regulations, 2011, the Commission fixes a period of three years starting from 1 April 2011 as the multi-year control period for the purposes of those regulations (p1).
It is a date-setting instrument, not a substantive tariff regulation: it sets no parameters, ceilings, formulas or procedures, and names no licensee individually — it operates for the transmission licensee(s) covered by the 2011 regulations. Note the two-day gap between the control period start (1 April 2011) and the notification date (2 April 2011), and that the closing date is left to be read from the three-year duration.
Read with this
The regulation
- Dated 1 Apr 2011Transmission Tariff Regulations, 2011
Amendments and corrections
Commencement notices and reasons
Procedures and orders made under it
- Dated 2 Apr 2011Formats for Multi Year Tariff Filings by the Transmission Licensee Order, 2011
- Dated 1 Nov 2013Formats for Multi Year Tariff Filings by the Transmission Licensee Order, 2013
- Dated 30 Nov 2016Transmission Licensee ARR & Tariff Filing Formats
- Dated 30 Nov 2016Transmission Licensee ARR & Tariff Filing Formats
- Dated 21 May 2022Himachal Pradesh Intra-State Transmission TBCB Threshold Order, 2022
- Dated 21 May 2022Intra-State Transmission TBCB Threshold Notification, Himachal Pradesh, 2022
- Dated 2 Dec 2023Fixation of Multiyear Control Period, 2023
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.