HPERC · Himachal Pradesh Electricity Regulatory Commission

Himachal Pradesh Intra-State Transmission TBCB Threshold Order, 2022

Development of Intra–State Transmission System through Tariff Based Competitive Bidding Process in the State of Himachal Pradesh.

OrderDated 21 May 2022

Replaced by Transmission Tariff Regulations, 2023

See that regulation for the date it took effect and for anything it keeps in force.

Made under the Transmission Tariff Regulations, 2011.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal- (a) anything done or any action taken or purported to have been done or taken under the repealed Regulations shall, in so far as it is not inconsistent with the provisions of these Regulations, be deemed to have been done or taken under the corresponding provisions of these Regulations;”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This order is HPERC's final decision on the single question it set itself: at what project cost must an intra-state transmission scheme in Himachal Pradesh be developed through tariff-based competitive bidding (TBCB) rather than the regulated tariff mechanism. It opens by reciting Section 63 of the Electricity Act 2003, the Ministry of Power's guidelines of 15.03.2021 recommending TBCB for intra-state transmission, and para 5.3 of the National Tariff Policy, which leaves the threshold to be decided by the State Commission (p1).

The question went to consultation: a staff paper notified on 26.02.2022, newspaper publication under Rule 3 of the Electricity (Procedure for Previous Publication) Rules, 2005, a website posting, and a 09.03.2022 letter inviting objections from the State Government, the Directorate of Energy, HPPTCL, HPSEB Ltd, HPPCL and the consumer representative by 30 March 2022 (p1–2). Two stakeholders responded — Sterlite Power and HPPTCL (p2).

Most of the order is an issue-by-issue disposal of their objections (heads A–G, p2–11): whether TBCB applies to new and augmentation projects, whether a line and its associated sub-station can be clubbed to reach the threshold, whether TBCB should start on 1 April 2022, whether TBCB or regulated tariff is cheaper for consumers, who bears cost-overrun risk, how the threshold was calculated, and which projects should be excluded. Repeatedly the Commission holds that these wider questions fall outside the scope of the exercise (p3, p4, p5, p7, p10, p11) and belong to the Central Government, the Ministry of Power guidelines or other law in force.

The operative decision (p11) is a single threshold — Rs. 45 Crore — applied to a transmission line, a sub-station, or both as a package where the sub-station is associated with the line, made under s.181 read with ss.61, 66 and 86 of the Act and clause 5.3 of the Tariff Policy 2016. The order records and rejects HPPTCL's argument that regulated tariff is cheaper, drawing on a comparison table of past competitively bid projects (p6).

Standard name
Tariff Policy
Primary topics
Competitive bidding, Transmission tariff

Read with this

The regulation

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.