Transmission Tariff Regulations, 2011 — Third Amendment, 2023 — Finalisation Order

In the matter of finalization of the Himachal Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Transmission Tariff) (Third Amendment) Regulations, 2023.

OrderDated 1 Jun 2023

Replaced by Transmission Tariff Regulations, 2023

See that regulation for the date it took effect and for anything it keeps in force.

Read with the Transmission Tariff Regulations, 2011.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal- (a) anything done or any action taken or purported to have been done or taken under the repealed Regulations shall, in so far as it is not inconsistent with the provisions of these Regulations, be deemed to have been done or taken under the corresponding provisions of these Regulations;”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the HPERC's order of 1 June 2023 closing out the consultation on the draft HPERC (Terms and Conditions for Determination of Transmission Tariff) (Third Amendment) Regulations, 2023, which amend the Tariff Regulations, 2011 (p1).

Paras 1–4 set out the background: the 2011 Tariff Regulations; para 5.3 of the National Tariff Policy, 2016 requiring intra-State transmission to be developed through competitive bidding above a threshold limit to be fixed by the State Commission; the Commission's notification of a threshold of Rs. 45 Crore on 21 May 2022; and the publication of the draft Amendment Regulations on 11.04.2023 to write that already-notified threshold into the 2011 Regulations (p1).

Paras 5–7 record the prior-publication process — newspaper inserts on 14 April 2023, the draft on the Commission's website, a stakeholder letter of 17.04.2023, and an 18 May 2023 deadline for objections — and note that only HPPTCL responded (p2).

Para 8 works through five HPPTCL submissions with the Commission's view on each: the threshold value for TBCB (rejected; the Commission declines to reopen the limit notified on 21.05.2022); exclusion of externally aided / funded works from TBCB (rejected, but the transmission licensee may seek prior approval in exceptional or urgent circumstances after a prudence check); pooling of HPPTCL's transmission assets (treated as outside the scope of this amendment); carrying cost from COD until billing (outside scope); and the methodology for adjusting STOA charges as non-tariff income against long- and medium-term transmission service charges (outside scope) (p3–5).

The order concludes by approving the draft amendment Regulations as finalised, with need-based consequential changes, for notification as the Third Amendment Regulations, 2023 (p5). The amended regulation text itself is not reproduced here.

Standard name
Transmission Tariff Regulations
Primary topics
Competitive bidding, Transmission tariff

Read with this

The regulation

Commencement notices and reasons

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document