Transmission Licensee ARR & Tariff Filing Formats

INDEX OF REGULATORY COMPLIANCE FORMATS FOR ARR & TARIFF FILING BY TRANSMISSION LICENSEE

OrderDated 30 Nov 2016

Replaced by Transmission Tariff Regulations, 2023

See that regulation for the date it took effect and for anything it keeps in force.

Made under the Transmission Tariff Regulations, 2011.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal- (a) anything done or any action taken or purported to have been done or taken under the repealed Regulations shall, in so far as it is not inconsistent with the provisions of these Regulations, be deemed to have been done or taken under the corresponding provisions of these Regulations;”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a form book, not a substantive tariff order. Page 1 is an index of 35 regulatory compliance formats for an Annual Revenue Requirement (ARR) and tariff filing by a transmission licensee, grouped as summary formats (S1–S4), financial formats (F1–F18) and physical/performance formats (P1–P9), with a legend for PY (previous/past year), CY (current year) and CP (control period) (p1).

Pages 2–5 hold the summary formats: S1 annual revenue requirement (receipts, expenditure, reasonable return, other income, ARR, surplus/shortfall, tariff revision impact) (p2); S2 return on equity; S3 energy balance; S4 transmission lines and substations, with region/project/transmission-element identifiers (pp2–5). The only numerical norm in the document appears here: “Return on Equity shall be 15.5% (post tax).” (p3).

Pages 6–30 are the financial formats: F1 R&M expenses (p6); F2 employee cost and provisions (p7); F3 employee strength (pp8–9); F4 administration & general expenses (p10); F5 fixed assets and depreciation (p11); F6A–F6F domestic, project-specific and foreign loans, weighted average interest, draw-down schedules for IDC and financing charges, and corporate-loan allocation (pp12–17); F7 expenses capitalised (p18); F8 contributions, grants and subsidies (p19); F9 project/scheme-wise capital expenditure (p20); F10 capital works in progress (p21); F11 working capital (p23); F12 admitted capital cost (p24); F13 capital cost estimates and commissioning schedule for new projects (p25); F14 element-wise break-up of capital cost (p26); F15 financial package up to COD (p27); F16 additional capitalisation after COD (p28); F17 financing of additional capitalisation (p29); F18 share capital and reserves/surplus (p30). Most ask for project, region and transmission-element detail and repeat columns for prior years, current year and forward years of the control period.

Pages 31–40 are physical/performance formats: P1 losses in the system by voltage level (p31); P2 status of metering (p32); P3 voltage profile (p34); P4 frequency excursion (p35); P5 HT feeder tripping outages (p36); P6 transformer failures (p37); P7 major system disturbances (p38); P8 electrical accidents (p39); P9 peak demand (p40). The document also contains a heading for a transmission programme from 2014-15 to 2018-19 (p22) and reference dates such as 31.03.2013 for existing assets and exchange rates (pp13–14, 17).

No notification number, issuing authority, gazette date or in-force date is printed. A line item for HPERC licence fee (p10) points to a Himachal Pradesh context, but the text does not state the Commission. The document is therefore best read as a set of blank filing templates, not as an operative regulation.

Standard name
Multi Year Tariff Regulations
Primary topics
Transmission tariff, ARR and true-up, Multi Year Tariff (MYT)

Read with this

The regulation

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.