Terms and Conditions for Determination of Transmission Tariff (Second Amendment) Regulations, 2018 — Draft

Himachal Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Transmission Tariff) (Second Amendment) Regulations, 2018

Draft amendmentDated 8 Oct 2018No. HPERC-F(1)-3/2018.- dated 08th October, 2018

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

HPERC publishes, for objections and suggestions, a draft Second Amendment to its 2011 Transmission Tariff Regulations. The preamble (p1) explains the drivers: alignment with the National Tariff Policy 2016 and Central Commission methodologies, alignment with the Commission's own Terminal Benefits Regulations 2015 and Power Regulatory Accounting Regulations 2014, a shift in the working-capital interest linkage from base rate to MCLR, and the need to close gaps and discrepancies. It also records that the Commission is about to determine transmission tariff for the control period starting 1 April 2019 (p1).

The consultative part (pp1–2) sets a 21-day window, from publication in the Rajpatra, Himachal Pradesh, for objections to be sent to the Secretary, and notes the draft is on the Commission's website.

The draft itself (pp2–10) has 17 clauses. Clauses 1–2 cover commencement and rework regulation 3's definitions, inserting new terms and substituting 'allocation statement', 'change in law' and the residual-definition clause. Clauses 3–6 add ceiling norms of operation, an accounting-manual and regulatory-accounts obligation, segregation of accounts and sub-balance-sheets, and a carrying cost on true-up. Clauses 7–10 replace the capital-cost provisions: initial spares ceilings by asset class, additional capitalisation after the cut-off date, the asset base including retired assets and insurance proceeds, and treatment of consumer contribution, deposit works, grants and capital subsidy. Clauses 11–14 rework financing costs — interest on loan (including a normative rate where there is no actual loan and a refinancing benefit-sharing rule), working capital components, interest on working capital, and depreciation of IT assets. Clauses 15–17 deal with non-tariff income, refund of excess charges with interest, and the split of short-term open access charges (pp9–10).

Standard name
Transmission Tariff Regulations
Primary topics
Transmission tariff, Tariff determination, Return, financing and working capital

Read with this

The regulation

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.