HPERC · Himachal Pradesh Electricity Regulatory Commission
Terms and Conditions for Determination of Transmission Tariff (Second Amendment) Regulations, 2018 — Draft
Himachal Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Transmission Tariff) (Second Amendment) Regulations, 2018
Draft amendmentDated 8 Oct 2018No. HPERC-F(1)-3/2018.- dated 08th October, 2018
Draft
A proposal that has since been finalised as the Terms and Conditions for Determination of Transmission Tariff (Second Amendment) Regulations, 2018.
Summary
Summary written by software. Check the regulator's original before you rely on it.
HPERC publishes, for objections and suggestions, a draft Second Amendment to its 2011 Transmission Tariff Regulations. The preamble (p1) explains the drivers: alignment with the National Tariff Policy 2016 and Central Commission methodologies, alignment with the Commission's own Terminal Benefits Regulations 2015 and Power Regulatory Accounting Regulations 2014, a shift in the working-capital interest linkage from base rate to MCLR, and the need to close gaps and discrepancies. It also records that the Commission is about to determine transmission tariff for the control period starting 1 April 2019 (p1).
The consultative part (pp1–2) sets a 21-day window, from publication in the Rajpatra, Himachal Pradesh, for objections to be sent to the Secretary, and notes the draft is on the Commission's website.
The draft itself (pp2–10) has 17 clauses. Clauses 1–2 cover commencement and rework regulation 3's definitions, inserting new terms and substituting 'allocation statement', 'change in law' and the residual-definition clause. Clauses 3–6 add ceiling norms of operation, an accounting-manual and regulatory-accounts obligation, segregation of accounts and sub-balance-sheets, and a carrying cost on true-up. Clauses 7–10 replace the capital-cost provisions: initial spares ceilings by asset class, additional capitalisation after the cut-off date, the asset base including retired assets and insurance proceeds, and treatment of consumer contribution, deposit works, grants and capital subsidy. Clauses 11–14 rework financing costs — interest on loan (including a normative rate where there is no actual loan and a refinancing benefit-sharing rule), working capital components, interest on working capital, and depreciation of IT assets. Clauses 15–17 deal with non-tariff income, refund of excess charges with interest, and the split of short-term open access charges (pp9–10).
Read with this
The regulation
- Dated 1 Apr 2011Transmission Tariff Regulations, 2011
Amendments and corrections
Commencement notices and reasons
Procedures and orders made under it
- Dated 2 Apr 2011Multi Year Control Period Notification for the Transmission Licensee, 2011
- Dated 2 Apr 2011Formats for Multi Year Tariff Filings by the Transmission Licensee Order, 2011
- Dated 1 Nov 2013Formats for Multi Year Tariff Filings by the Transmission Licensee Order, 2013
- Dated 30 Nov 2016Transmission Licensee ARR & Tariff Filing Formats
- Dated 30 Nov 2016Transmission Licensee ARR & Tariff Filing Formats
- Dated 21 May 2022Himachal Pradesh Intra-State Transmission TBCB Threshold Order, 2022
- Dated 21 May 2022Intra-State Transmission TBCB Threshold Notification, Himachal Pradesh, 2022
- Dated 2 Dec 2023Fixation of Multiyear Control Period, 2023
Earlier drafts
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.