CERC · Central Electricity Regulatory Commission
Guidelines on Cross Border Trade of Electricity, 2016
Guidelines on Cross Border Trade of Electricity
Explanatory memorandum to a draftDated 14 Jan 2016No. 14/1/2016-Trans
Draft
The draft has since been finalised as the Cross Border Trade of Electricity Regulations, 2019.
Explanatory memorandum to the Cross Border Trade of Electricity Regulations, 2017 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a Ministry of Power Office Memorandum issuing the Guidelines on Cross Border Trade of Electricity. The guidelines were prepared by an Inter-Ministerial Working Group in consultation with stakeholders and are aligned with the SAARC Framework Agreement for Energy Cooperation (Electricity) signed on 27.11.2014 (p1, p4). They are meant to facilitate cross-border electricity transactions between India and neighbouring countries, with Bangladesh, Bhutan and Nepal identified as existing trade partners (p1).
Clauses 1–4 set the background, objectives, agreement route and institutional framework: cross-border transactions are to proceed through bilateral agreements between an Indian entity and an entity of the neighbouring country, under inter-government agreements; the Ministry of Power is to designate a Designated Authority; and CERC is to frame binding regulations for cross-border trade (p4–5). Clause 5 sets cooperation and eligibility rules: participating entities generally need one-time approval from the Designated Authority, with ownership thresholds for imports and certified surplus for exports; other entities need case-to-case approval, and equity changes require fresh approval (p5–6). Non-PSU coal-based Indian thermal projects may export only if the Designated Authority certifies surplus capacity (p6).
Clause 6 provides tariff routes: Government-to-Government negotiated tariffs adopted by the Appropriate Commission; competitive bidding under Section 63 for other imports; possible CERC tariff determination for hydro projects; and mutually agreed or bid-based exports subject to transmission/wheeling charges (p7). Clause 7 covers trade through Indian power exchanges under CERC power-market contract categories, with the tradable quantum prescribed by the Designated Authority (p8). Clause 8 addresses transmission planning, access priority, scheduling, accounting and settlement, and independent transmission for generation supplying only neighbouring countries (p8–9). Clause 9 makes grid security paramount; Clause 10 covers dispute resolution, including Singapore International Arbitration Centre for cross-country disputes (p9). Existing cross-border actions are deemed to be under these guidelines and continue until existing contracts expire (p4).
Read with this
The regulation
- Dated 8 Mar 2019Cross Border Trade of Electricity Regulations, 2019
Amendments and corrections
Commencement notices and reasons
- Dated 20 Mar 2019Cross Border Trade of Electricity Regulations, 2019 — Statement of Reasons
- Dated 15 Dec 2023Cross Border Trade of Electricity Regulations, 2019 — First Amendment, 2023 — Statement of Reasons
- Dated 8 Feb 2026Cross Border Trade of Electricity Regulations, 2019 — Second Amendment, 2025 — Statement of Reasons
Consolidated copies, for reference (1)
- Dated 8 Mar 2019Cross Border Trade of Electricity Regulations, 2019
Other copies of these documents (3)
- Dated 8 Mar 2019Cross Border Trade of Electricity Regulations, 2019
- Dated 15 Dec 2023Cross Border Trade of Electricity (First Amendment) Regulations, 2023
- Dated 9 Dec 2025Cross Border Trade of Electricity Regulations, 2019 — Second Amendment, 2025
Earlier drafts
- Dated 16 Feb 2017Cross Border Trade of Electricity Regulations, 2017 — Draft
- Dated 14 Dec 2016Explanatory memorandum: Cross Border Trade of Electricity — Designation of Designated Authority, 2016
- Released with the notice dated 16 Feb 2017Explanatory memorandum: Explanatory Memorandum — Draft Cross Border Trade of Electricity Regulations, 2017
- Dated 16 Feb 2017Public notice: Draft Cross Border Trade of Electricity Regulations, 2017 — Public Notice
- Dated 7 Apr 2017Notice extending the date for comments: Draft Cross Border Trade of Electricity Regulations, 2017 — comment extension notice
- Dated 7 Apr 2017Notice extending the date for comments: Draft Cross Border Trade of Electricity Regulations, 2017 — Public Notice (Extension-II) — comments deadline extended to 17.04.2017
- Dated 28 Aug 2023Cross Border Trade of Electricity (First Amendment) Regulations, 2023
- Dated 28 Aug 2023Explanatory memorandum: Cross-Border Trade of Electricity (First Amendment) Regulations, 2023 — Explanatory Memorandum — Draft
- Dated 28 Aug 2023Public notice: Cross Border Trade of Electricity (First Amendment) Regulations, 2023 — Draft — Public Notice
- Dated 12 Sep 2023Hearing notice: Public hearing notice — Cross-Border Trade of Electricity (First Amendment) Regulations, 2023
- Dated 31 Dec 2024Cross Border Trade of Electricity (Second Amendment) Regulations, 2024 — Draft
- Dated 31 Dec 2024Public notice: Cross Border Trade of Electricity (Second Amendment) Regulations, 2024 — Draft — Public Notice
- Dated 31 Dec 2024Explanatory memorandum: Cross Border Trade of Electricity Regulations, 2019 — Second Amendment, 2024 — Explanatory Memorandum — Draft
- Dated 29 Jan 2025Notice extending the date for comments: Cross Border Trade of Electricity (Second Amendment) Regulations, 2024 — Public Notice, comments deadline extended to 07.02.2025
- Dated 28 Apr 2025Hearing notice: Public hearing notice — Draft Cross Border Trade of Electricity (Second Amendment) Regulations, 2024
3 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.