Skip to content

CERC · Central Electricity Regulatory Commission

Guidelines on Cross Border Trade of Electricity, 2016

Guidelines on Cross Border Trade of Electricity

Explanatory memorandum to a draftDated 14 Jan 2016No. 14/1/2016-Trans

Draft

The draft has since been finalised as the Cross Border Trade of Electricity Regulations, 2019.

Explanatory memorandum to the Cross Border Trade of Electricity Regulations, 2017 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a Ministry of Power Office Memorandum issuing the Guidelines on Cross Border Trade of Electricity. The guidelines were prepared by an Inter-Ministerial Working Group in consultation with stakeholders and are aligned with the SAARC Framework Agreement for Energy Cooperation (Electricity) signed on 27.11.2014 (p1, p4). They are meant to facilitate cross-border electricity transactions between India and neighbouring countries, with Bangladesh, Bhutan and Nepal identified as existing trade partners (p1).

Clauses 1–4 set the background, objectives, agreement route and institutional framework: cross-border transactions are to proceed through bilateral agreements between an Indian entity and an entity of the neighbouring country, under inter-government agreements; the Ministry of Power is to designate a Designated Authority; and CERC is to frame binding regulations for cross-border trade (p4–5). Clause 5 sets cooperation and eligibility rules: participating entities generally need one-time approval from the Designated Authority, with ownership thresholds for imports and certified surplus for exports; other entities need case-to-case approval, and equity changes require fresh approval (p5–6). Non-PSU coal-based Indian thermal projects may export only if the Designated Authority certifies surplus capacity (p6).

Clause 6 provides tariff routes: Government-to-Government negotiated tariffs adopted by the Appropriate Commission; competitive bidding under Section 63 for other imports; possible CERC tariff determination for hydro projects; and mutually agreed or bid-based exports subject to transmission/wheeling charges (p7). Clause 7 covers trade through Indian power exchanges under CERC power-market contract categories, with the tradable quantum prescribed by the Designated Authority (p8). Clause 8 addresses transmission planning, access priority, scheduling, accounting and settlement, and independent transmission for generation supplying only neighbouring countries (p8–9). Clause 9 makes grid security paramount; Clause 10 covers dispute resolution, including Singapore International Arbitration Centre for cross-country disputes (p9). Existing cross-border actions are deemed to be under these guidelines and continue until existing contracts expire (p4).

Standard name
Cross Border Trade of Electricity
Primary topics
Cross-border trade, Tariff determination, Power markets and exchanges

Read with this

The regulation

Consolidated copies, for reference (1)

Other copies of these documents (3)

Earlier drafts

3 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document