Central Electricity Regulatory Commission (Cross Border Trade of Electricity) Regulations, 2017
Draft regulationDated 16 Feb 201713/2/7/2015-PM/CERC dated 16 February, 2017
Draft
A proposal that has since been finalised as the Cross Border Trade of Electricity Regulations, 2019.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a draft CERC notification, dated 16 February 2017, for principal regulations called the Central Electricity Regulatory Commission (Cross Border Trade of Electricity) Regulations, 2017. It is made under section 178 read with section 66 of the Electricity Act 2003 and follows the Ministry of Power's Cross Border Trade of Electricity Guidelines dated 5 December 2016. It would come into force on publication in the Official Gazette, but no Gazette date is printed (p1).
Chapter 1 (pp1–9) sets the title and commencement and a long definitions section. It defines the cross-border access regime and its key actors and concepts: CBTA, applicant, buying/selling entity, interconnection point, designated authority, settlement nodal agency, transmission planning agency, target region, lead generator, access bank guarantee, system operator and grid/transmission terms. The definitions borrow from the Electricity Act, Grid Code, CERC connectivity/open-access regulations and CEA metering regulations.
Chapter 2 (pp9–14) sets general provisions. It applies to participating entities in India and neighbouring countries; cross-border trade is to be through bilateral agreements under the government-to-government framework. It deems actions under agreements in force before 5 December 2016 to be under the new regulations/guidelines until those agreements expire. It sets tariff routes: government-to-government negotiation for government-agreed trade; competitive bidding for imports with adoption by the Appropriate Commission; mutual agreement or bidding for exports; and CERC tariff regulations for the cross-border link. It also establishes the institutional framework (Designated Authority, TPA, SNA, NLDC and CTU), eligibility and one-time approval conditions, and power-exchange trading rules.
Chapter 3 (pp14–23) covers transmission planning, connectivity and access. It provides for joint planning of interconnections, preference for DC links, and independent lines by Indian generators supplying exclusively abroad with GoI approval. It routes applications for connectivity/LTA/MTOA to CTU under the 2009 regulations and STOA to NLDC under the 2008 regulations. It sets application fees, processing timelines, provisional connectivity until LTA, the access bank guarantee, operationalisation of long-term access, firming up of drawal/injection, metering, data/communication, system recording, reactive compensation, safety and cyber-security obligations.
Chapter 4 (pp23–28) is the system operation chapter. It requires reliable and secure grid operation and lays down scheduling through the SNA and system operators, 15-minute scheduling, transmission losses in kind, energy accounting and DSM settlement, transfer capability assessment, curtailment priority (short-term before medium-term before long-term, pro rata within a category), settlement-nodal-agency functions, coordination forums, system security and islanding conditions, outage planning, recovery/black-start procedures and event reporting.
Chapter 5 (pp28–30) deals with charges and payment security. It applies PoC/transmission charges under the Sharing Regulations, allocates transmission losses, covers system operator fees and registration, and requires the CBTA customer to put in place payment security (letters of credit) well before access starts. Default can lead to disqualification from the Indian grid.
Chapter 6 (pp30–31) contains miscellaneous provisions: dispute resolution and SIAC arbitration seated in Singapore, force majeure/change-in-law clauses in agreements, data sharing with CEA/DA, bank guarantee/letter of credit requirements and sovereign guarantee for neighbouring-country entities, and the Commission's power to relax and issue directions.
Read with this
The regulation
- Dated 8 Mar 2019Cross Border Trade of Electricity Regulations, 2019
Amendments and corrections
Commencement notices and reasons
- Dated 20 Mar 2019Cross Border Trade of Electricity Regulations, 2019 — Statement of Reasons
- Dated 15 Dec 2023Cross Border Trade of Electricity Regulations, 2019 — First Amendment, 2023 — Statement of Reasons
- Dated 8 Feb 2026Cross Border Trade of Electricity Regulations, 2019 — Second Amendment, 2025 — Statement of Reasons
Consolidated copies, for reference (1)
- Dated 8 Mar 2019Cross Border Trade of Electricity Regulations, 2019
Other copies of these documents (3)
- Dated 8 Mar 2019Cross Border Trade of Electricity Regulations, 2019
- Dated 15 Dec 2023Cross Border Trade of Electricity (First Amendment) Regulations, 2023
- Dated 9 Dec 2025Cross Border Trade of Electricity Regulations, 2019 — Second Amendment, 2025
Earlier drafts
- Dated 28 Aug 2023Cross Border Trade of Electricity (First Amendment) Regulations, 2023
- Dated 28 Aug 2023Explanatory memorandum: Cross-Border Trade of Electricity (First Amendment) Regulations, 2023 — Explanatory Memorandum — Draft
- Dated 28 Aug 2023Public notice: Cross Border Trade of Electricity (First Amendment) Regulations, 2023 — Draft — Public Notice
- Dated 12 Sep 2023Hearing notice: Public hearing notice — Cross-Border Trade of Electricity (First Amendment) Regulations, 2023
- Dated 31 Dec 2024Cross Border Trade of Electricity (Second Amendment) Regulations, 2024 — Draft
- Dated 31 Dec 2024Public notice: Cross Border Trade of Electricity (Second Amendment) Regulations, 2024 — Draft — Public Notice
- Dated 31 Dec 2024Explanatory memorandum: Cross Border Trade of Electricity Regulations, 2019 — Second Amendment, 2024 — Explanatory Memorandum — Draft
- Dated 29 Jan 2025Notice extending the date for comments: Cross Border Trade of Electricity (Second Amendment) Regulations, 2024 — Public Notice, comments deadline extended to 07.02.2025
- Dated 28 Apr 2025Hearing notice: Public hearing notice — Draft Cross Border Trade of Electricity (Second Amendment) Regulations, 2024
- Dated 14 Jan 2016Explanatory memorandum: Guidelines on Cross Border Trade of Electricity, 2016
- Dated 14 Dec 2016Explanatory memorandum: Cross Border Trade of Electricity — Designation of Designated Authority, 2016
- Released with the notice dated 16 Feb 2017Explanatory memorandum: Explanatory Memorandum — Draft Cross Border Trade of Electricity Regulations, 2017
- Dated 16 Feb 2017Public notice: Draft Cross Border Trade of Electricity Regulations, 2017 — Public Notice
- Dated 7 Apr 2017Notice extending the date for comments: Draft Cross Border Trade of Electricity Regulations, 2017 — comment extension notice
- Dated 7 Apr 2017Notice extending the date for comments: Draft Cross Border Trade of Electricity Regulations, 2017 — Public Notice (Extension-II) — comments deadline extended to 17.04.2017
3 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.