Skip to content

CERC · Central Electricity Regulatory Commission

Cross Border Trade of Electricity Regulations, 2017 — Draft

Central Electricity Regulatory Commission (Cross Border Trade of Electricity) Regulations, 2017

Draft regulationDated 16 Feb 201713/2/7/2015-PM/CERC dated 16 February, 2017

Draft

A proposal that has since been finalised as the Cross Border Trade of Electricity Regulations, 2019.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a draft CERC notification, dated 16 February 2017, for principal regulations called the Central Electricity Regulatory Commission (Cross Border Trade of Electricity) Regulations, 2017. It is made under section 178 read with section 66 of the Electricity Act 2003 and follows the Ministry of Power's Cross Border Trade of Electricity Guidelines dated 5 December 2016. It would come into force on publication in the Official Gazette, but no Gazette date is printed (p1).

Chapter 1 (pp1–9) sets the title and commencement and a long definitions section. It defines the cross-border access regime and its key actors and concepts: CBTA, applicant, buying/selling entity, interconnection point, designated authority, settlement nodal agency, transmission planning agency, target region, lead generator, access bank guarantee, system operator and grid/transmission terms. The definitions borrow from the Electricity Act, Grid Code, CERC connectivity/open-access regulations and CEA metering regulations.

Chapter 2 (pp9–14) sets general provisions. It applies to participating entities in India and neighbouring countries; cross-border trade is to be through bilateral agreements under the government-to-government framework. It deems actions under agreements in force before 5 December 2016 to be under the new regulations/guidelines until those agreements expire. It sets tariff routes: government-to-government negotiation for government-agreed trade; competitive bidding for imports with adoption by the Appropriate Commission; mutual agreement or bidding for exports; and CERC tariff regulations for the cross-border link. It also establishes the institutional framework (Designated Authority, TPA, SNA, NLDC and CTU), eligibility and one-time approval conditions, and power-exchange trading rules.

Chapter 3 (pp14–23) covers transmission planning, connectivity and access. It provides for joint planning of interconnections, preference for DC links, and independent lines by Indian generators supplying exclusively abroad with GoI approval. It routes applications for connectivity/LTA/MTOA to CTU under the 2009 regulations and STOA to NLDC under the 2008 regulations. It sets application fees, processing timelines, provisional connectivity until LTA, the access bank guarantee, operationalisation of long-term access, firming up of drawal/injection, metering, data/communication, system recording, reactive compensation, safety and cyber-security obligations.

Chapter 4 (pp23–28) is the system operation chapter. It requires reliable and secure grid operation and lays down scheduling through the SNA and system operators, 15-minute scheduling, transmission losses in kind, energy accounting and DSM settlement, transfer capability assessment, curtailment priority (short-term before medium-term before long-term, pro rata within a category), settlement-nodal-agency functions, coordination forums, system security and islanding conditions, outage planning, recovery/black-start procedures and event reporting.

Chapter 5 (pp28–30) deals with charges and payment security. It applies PoC/transmission charges under the Sharing Regulations, allocates transmission losses, covers system operator fees and registration, and requires the CBTA customer to put in place payment security (letters of credit) well before access starts. Default can lead to disqualification from the Indian grid.

Chapter 6 (pp30–31) contains miscellaneous provisions: dispute resolution and SIAC arbitration seated in Singapore, force majeure/change-in-law clauses in agreements, data sharing with CEA/DA, bank guarantee/letter of credit requirements and sovereign guarantee for neighbouring-country entities, and the Commission's power to relax and issue directions.

Standard name
Cross Border Trade of Electricity
Primary topics
Cross-border trade, Open access, Tariff determination

Read with this

The regulation

Consolidated copies, for reference (1)

Other copies of these documents (3)

Earlier drafts

3 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document