Skip to content

CERC · Central Electricity Regulatory Commission

Cross Border Trade of Electricity Regulations, 2019

Central Electricity Regulatory Commission (Cross Border Trade of Electricity) Regulations, 2019

Consolidated copyDated 8 Mar 2019No. 13/2/7/2015-PM/CERC dated 8th March, 2019

A consolidated copy of the Cross Border Trade of Electricity Regulations, 2019, published by CERC for reference. It may not include the latest amendments; read it with the amendments listed for the regulation.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

What it is. CERC Notification No. 13/2/7/2015-PM/CERC dated 8 March 2019 makes the Central Electricity Regulatory Commission (Cross Border Trade of Electricity) Regulations, 2019, under s.178 read with s.66 of the Electricity Act 2003 and the Ministry of Power's Guidelines on import/export of electricity (p1). They commence from the date of Gazette publication; the Gazette date is not printed (p1). The text is a consolidated/amended version: several definitions and clauses are marked DELETED and inserted sub-clauses refer to CERC regulations up to 2024 (e.g., pp3, 5, 6, 13, 32).

Chapter 1 (pp1–8) defines the cross-border vocabulary — Participating Entity, Cross Border Customer, CBTL, GNA/T-GNA, Access and Application Bank Guarantees, SNA and SNA Charge, Designated Authority, TPA, ATC/TTC/TRM, System Operator, time-block — and adopts definitions from the Act, GNA Regulations and Grid Code.

Chapter 2 (pp8–12) sets scope and modes of trade: bilateral agreements, bidding, mutual agreements between entities, or Indian power exchanges. It allocates institutional roles to the Designated Authority, Transmission Planning Agency, Settlement Nodal Agency, NLDC (as System Operator) and CTU, and provides routes for tariff determination for imports, exports, hydro imports and CBTLs, including continuing Government-to-Government tariffs.

Chapter 3 (pp12–26) covers transmission planning, connectivity and access. It provides for joint planning and implementation of Cross Border Transmission Links, dedicated transmission systems, spare-capacity open access, application procedures for connectivity, T-GNA and GNA made to CTU/NLDC, fees and bank guarantees, processing timelines, delay-liability rules, access-bank-guarantee relinquishment, effectiveness of GNA, metering, communication, recording instruments, reactive compensation and cyber security.

Chapter 4 (pp26–30) sets system-operation rules: grid security, declaration of TTC/TRM/ATC, scheduling in 15-minute time-blocks, energy accounting and settlement through RPCs and the SNA, deviation and reactive-energy charges, curtailment priority (T-GNA before GNA; bilateral before power-exchange transactions), event reporting and six-monthly operator coordination.

Chapter 5 (pp30–33) deals with payment: transmission charges under the Sharing Regulations, Government-to-Government charges for CBTLs, charges for CBTL open access detailed in Annexure-II, SNA charge, taxes, transmission losses, system-operation fees and a payment-security mechanism based on letters of credit; default can lead to denial of Indian-grid access. It also directs CTU to issue a detailed procedure and formats within three months.

Chapter 6 (pp33–34) provides dispute resolution (mutual, then government-level, then international arbitration), bank requirements, power to relax and power to issue directions. Annexure-I (pp35–36) gives modalities for a generating station under Regulation 10(7) seeking connectivity and access to the Indian grid; Annexure-II (pp37–38) gives the methodology for recovering transmission charges for the Indian portion of CBTLs under Regulation 7(2-i) and 7(2-ii), including per-unit open-access rates, over-recovery sharing and possible CERC tariff determination for the neighbouring-country portion.

Standard name
Cross Border Trade of Electricity
Primary topics
Cross-border trade, Connectivity and GNA, Transmission tariff

Read with this

The regulation

Other copies of these documents (3)

Earlier drafts

3 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document