CERC · Central Electricity Regulatory Commission
Cross Border Trade of Electricity Regulations, 2019
Central Electricity Regulatory Commission (Cross Border Trade of Electricity) Regulations, 2019
Consolidated copyDated 8 Mar 2019No. 13/2/7/2015-PM/CERC dated 8th March, 2019
A consolidated copy of the Cross Border Trade of Electricity Regulations, 2019, published by CERC for reference. It may not include the latest amendments; read it with the amendments listed for the regulation.
Summary
Summary written by software. Check the regulator's original before you rely on it.
What it is. CERC Notification No. 13/2/7/2015-PM/CERC dated 8 March 2019 makes the Central Electricity Regulatory Commission (Cross Border Trade of Electricity) Regulations, 2019, under s.178 read with s.66 of the Electricity Act 2003 and the Ministry of Power's Guidelines on import/export of electricity (p1). They commence from the date of Gazette publication; the Gazette date is not printed (p1). The text is a consolidated/amended version: several definitions and clauses are marked DELETED and inserted sub-clauses refer to CERC regulations up to 2024 (e.g., pp3, 5, 6, 13, 32).
Chapter 1 (pp1–8) defines the cross-border vocabulary — Participating Entity, Cross Border Customer, CBTL, GNA/T-GNA, Access and Application Bank Guarantees, SNA and SNA Charge, Designated Authority, TPA, ATC/TTC/TRM, System Operator, time-block — and adopts definitions from the Act, GNA Regulations and Grid Code.
Chapter 2 (pp8–12) sets scope and modes of trade: bilateral agreements, bidding, mutual agreements between entities, or Indian power exchanges. It allocates institutional roles to the Designated Authority, Transmission Planning Agency, Settlement Nodal Agency, NLDC (as System Operator) and CTU, and provides routes for tariff determination for imports, exports, hydro imports and CBTLs, including continuing Government-to-Government tariffs.
Chapter 3 (pp12–26) covers transmission planning, connectivity and access. It provides for joint planning and implementation of Cross Border Transmission Links, dedicated transmission systems, spare-capacity open access, application procedures for connectivity, T-GNA and GNA made to CTU/NLDC, fees and bank guarantees, processing timelines, delay-liability rules, access-bank-guarantee relinquishment, effectiveness of GNA, metering, communication, recording instruments, reactive compensation and cyber security.
Chapter 4 (pp26–30) sets system-operation rules: grid security, declaration of TTC/TRM/ATC, scheduling in 15-minute time-blocks, energy accounting and settlement through RPCs and the SNA, deviation and reactive-energy charges, curtailment priority (T-GNA before GNA; bilateral before power-exchange transactions), event reporting and six-monthly operator coordination.
Chapter 5 (pp30–33) deals with payment: transmission charges under the Sharing Regulations, Government-to-Government charges for CBTLs, charges for CBTL open access detailed in Annexure-II, SNA charge, taxes, transmission losses, system-operation fees and a payment-security mechanism based on letters of credit; default can lead to denial of Indian-grid access. It also directs CTU to issue a detailed procedure and formats within three months.
Chapter 6 (pp33–34) provides dispute resolution (mutual, then government-level, then international arbitration), bank requirements, power to relax and power to issue directions. Annexure-I (pp35–36) gives modalities for a generating station under Regulation 10(7) seeking connectivity and access to the Indian grid; Annexure-II (pp37–38) gives the methodology for recovering transmission charges for the Indian portion of CBTLs under Regulation 7(2-i) and 7(2-ii), including per-unit open-access rates, over-recovery sharing and possible CERC tariff determination for the neighbouring-country portion.
Read with this
The regulation
- Dated 8 Mar 2019Cross Border Trade of Electricity Regulations, 2019
Amendments and corrections
Commencement notices and reasons
- Dated 20 Mar 2019Cross Border Trade of Electricity Regulations, 2019 — Statement of Reasons
- Dated 15 Dec 2023Cross Border Trade of Electricity Regulations, 2019 — First Amendment, 2023 — Statement of Reasons
- Dated 8 Feb 2026Cross Border Trade of Electricity Regulations, 2019 — Second Amendment, 2025 — Statement of Reasons
Other copies of these documents (3)
- Dated 8 Mar 2019Cross Border Trade of Electricity Regulations, 2019
- Dated 15 Dec 2023Cross Border Trade of Electricity (First Amendment) Regulations, 2023
- Dated 9 Dec 2025Cross Border Trade of Electricity Regulations, 2019 — Second Amendment, 2025
Earlier drafts
- Dated 16 Feb 2017Cross Border Trade of Electricity Regulations, 2017 — Draft
- Dated 14 Jan 2016Explanatory memorandum: Guidelines on Cross Border Trade of Electricity, 2016
- Dated 14 Dec 2016Explanatory memorandum: Cross Border Trade of Electricity — Designation of Designated Authority, 2016
- Released with the notice dated 16 Feb 2017Explanatory memorandum: Explanatory Memorandum — Draft Cross Border Trade of Electricity Regulations, 2017
- Dated 16 Feb 2017Public notice: Draft Cross Border Trade of Electricity Regulations, 2017 — Public Notice
- Dated 7 Apr 2017Notice extending the date for comments: Draft Cross Border Trade of Electricity Regulations, 2017 — comment extension notice
- Dated 7 Apr 2017Notice extending the date for comments: Draft Cross Border Trade of Electricity Regulations, 2017 — Public Notice (Extension-II) — comments deadline extended to 17.04.2017
- Dated 28 Aug 2023Cross Border Trade of Electricity (First Amendment) Regulations, 2023
- Dated 28 Aug 2023Explanatory memorandum: Cross-Border Trade of Electricity (First Amendment) Regulations, 2023 — Explanatory Memorandum — Draft
- Dated 28 Aug 2023Public notice: Cross Border Trade of Electricity (First Amendment) Regulations, 2023 — Draft — Public Notice
- Dated 12 Sep 2023Hearing notice: Public hearing notice — Cross-Border Trade of Electricity (First Amendment) Regulations, 2023
- Dated 31 Dec 2024Cross Border Trade of Electricity (Second Amendment) Regulations, 2024 — Draft
- Dated 31 Dec 2024Public notice: Cross Border Trade of Electricity (Second Amendment) Regulations, 2024 — Draft — Public Notice
- Dated 31 Dec 2024Explanatory memorandum: Cross Border Trade of Electricity Regulations, 2019 — Second Amendment, 2024 — Explanatory Memorandum — Draft
- Dated 29 Jan 2025Notice extending the date for comments: Cross Border Trade of Electricity (Second Amendment) Regulations, 2024 — Public Notice, comments deadline extended to 07.02.2025
- Dated 28 Apr 2025Hearing notice: Public hearing notice — Draft Cross Border Trade of Electricity (Second Amendment) Regulations, 2024
3 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.