Cross Border Trade of Electricity Regulations, 2019
Central Electricity Regulatory Commission (Cross Border Trade of Electricity) Regulations, 2019
Regulation · Gazette copyDated 8 Mar 2019Published in the Gazette 8 Mar 2019No. 13/2/7/2015-PM/CERC dated the 8th March, 2019
The Gazette copy of the Cross Border Trade of Electricity Regulations, 2019.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Central Electricity Regulatory Commission (Cross Border Trade of Electricity) Regulations, 2019, notified in the Gazette on 8 March 2019 (p14) under s.178 read with s.66 of the Electricity Act 2003 and the Ministry of Power's guidelines on import and export of electricity. It builds the regulatory machinery by which entities in neighbouring countries can inject into, draw from, or wheel power across the Indian grid.
Chapter 1 (p14–17) sets the short title and commencement and defines the vocabulary the rest of the instrument runs on — participating entity, designated authority, cross border customer, cross border transmission link, interconnection point, the three access products, settlement nodal agency, and the TTC/ATC/TRM family.
Chapter 2 (p17–19) states applicability to participating entities in India and neighbouring countries, and preserves arrangements under agreements already in force until they expire. It allocates institutional roles — Designated Authority (MoP) for approval and procedure, a Transmission Planning Agency for planning, a Settlement Nodal Agency per neighbouring country for grid-operation charges, NLDC as System Operator and short-term access granter, and CTU for long-term access and medium-term open access. It lays out the tariff routes for import and export (competitive bidding, mutual agreement, government-to-government, or, for hydro imports, Commission determination on stated conditions) and lets Indian trading licensees trade on power exchanges on behalf of participating entities with DA approval.
Chapter 3 (p19–24) is the access core: planning and implementation of cross border links and their exclusion from the ISTS PoC base; application routes and fees to CTU/NLDC by quantum slab; processing timeframes; treatment of commissioning delays on either side; the Access Bank Guarantee and its staged release; operationalisation of long-term access; and technical requirements for metering, communication, disturbance recording, reactive compensation and cyber security.
Chapter 4 (p24–26) governs system operation: grid security and the narrow grounds for isolating a cross border link; declaration of TTC/TRM/ATC with the lower of the two countries' ATC governing; scheduling in 15-minute blocks through the Settlement Nodal Agency; net per-country energy accounting by RPCs with deviation and reactive energy settled through regional pools; the curtailment sequence in contingencies; event reporting and six-monthly operator coordination meetings.
Chapter 5 (p26–27) covers money: PoC charges under the Sharing Regulations, a transmission-loss sharing methodology, system operation fees payable through the Settlement Nodal Agency, and a payment security mechanism with defined credit instruments and denial of grid access on default.
Chapter 6 (p27–28) provides the dispute-resolution ladder (Indian disputes under the Act; cross-border disputes mutual, then government-level, then international arbitration), rules on the currency and banks for guarantees, and the Commission's powers to relax provisions and issue directions.
Read with this
The regulation
- Dated 8 Mar 2019Cross Border Trade of Electricity Regulations, 2019
Amendments and corrections
Commencement notices and reasons
- Dated 20 Mar 2019Cross Border Trade of Electricity Regulations, 2019 — Statement of Reasons
- Dated 15 Dec 2023Cross Border Trade of Electricity Regulations, 2019 — First Amendment, 2023 — Statement of Reasons
- Dated 8 Feb 2026Cross Border Trade of Electricity Regulations, 2019 — Second Amendment, 2025 — Statement of Reasons
Consolidated copies, for reference (1)
- Dated 8 Mar 2019Cross Border Trade of Electricity Regulations, 2019
Other copies of these documents (2)
Earlier drafts
- Dated 16 Feb 2017Cross Border Trade of Electricity Regulations, 2017 — Draft
- Dated 14 Jan 2016Explanatory memorandum: Guidelines on Cross Border Trade of Electricity, 2016
- Dated 14 Dec 2016Explanatory memorandum: Cross Border Trade of Electricity — Designation of Designated Authority, 2016
- Released with the notice dated 16 Feb 2017Explanatory memorandum: Explanatory Memorandum — Draft Cross Border Trade of Electricity Regulations, 2017
- Dated 16 Feb 2017Public notice: Draft Cross Border Trade of Electricity Regulations, 2017 — Public Notice
- Dated 7 Apr 2017Notice extending the date for comments: Draft Cross Border Trade of Electricity Regulations, 2017 — comment extension notice
- Dated 7 Apr 2017Notice extending the date for comments: Draft Cross Border Trade of Electricity Regulations, 2017 — Public Notice (Extension-II) — comments deadline extended to 17.04.2017
- Dated 28 Aug 2023Cross Border Trade of Electricity (First Amendment) Regulations, 2023
- Dated 28 Aug 2023Explanatory memorandum: Cross-Border Trade of Electricity (First Amendment) Regulations, 2023 — Explanatory Memorandum — Draft
- Dated 28 Aug 2023Public notice: Cross Border Trade of Electricity (First Amendment) Regulations, 2023 — Draft — Public Notice
- Dated 12 Sep 2023Hearing notice: Public hearing notice — Cross-Border Trade of Electricity (First Amendment) Regulations, 2023
- Dated 31 Dec 2024Cross Border Trade of Electricity (Second Amendment) Regulations, 2024 — Draft
- Dated 31 Dec 2024Public notice: Cross Border Trade of Electricity (Second Amendment) Regulations, 2024 — Draft — Public Notice
- Dated 31 Dec 2024Explanatory memorandum: Cross Border Trade of Electricity Regulations, 2019 — Second Amendment, 2024 — Explanatory Memorandum — Draft
- Dated 29 Jan 2025Notice extending the date for comments: Cross Border Trade of Electricity (Second Amendment) Regulations, 2024 — Public Notice, comments deadline extended to 07.02.2025
- Dated 28 Apr 2025Hearing notice: Public hearing notice — Draft Cross Border Trade of Electricity (Second Amendment) Regulations, 2024
3 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.