Skip to content

CERC · Central Electricity Regulatory Commission

Cross Border Trade of Electricity Regulations, 2019 — Second Amendment, 2025

Central Electricity Regulatory Commission (Cross Border Trade of Electricity) (Second Amendment) Regulations, 2025

AmendmentDated 9 Dec 2025No. 13/2/7/2015-PM/CERC dated 9.12.2025

Amends the Cross Border Trade of Electricity Regulations, 2019.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Second Amendment to the CERC (Cross Border Trade of Electricity) Regulations, 2019, notified on 9 December 2025 under s.178 read with s.66 of the Electricity Act 2003 and the Ministry of Power's 2018 cross-border import/export guidelines (p1). It comes into force from Gazette publication; the Gazette date is not printed (p1). Its single organising idea is to replace the principal regulations' long-term access / medium-term / short-term open access vocabulary with the General Network Access (GNA) and Temporary GNA (T-GNA) framework of the 2022 Connectivity and GNA Regulations, and to fold cross-border applicants into that machinery.

Regulation 2 rewrites the definitions clause almost wholesale (pp1–4): access terms become GNA/T-GNA, electricity trading licensees of India and Indian generating stations with dedicated lines to a neighbouring country are brought into the "participating entity" fold, definitions of CTU/GNA/T-GNA and the Communication Regulations 2017 are imported, a "Due Date" (45th day from CTU bill presentation) is created, and several obsolete sub-clauses are deleted. Regulation 2(3) adds a general clause that references to Acts, Rules and Regulations include later amendments and re-enactments.

Regulations 3 to 27 then rework the operative regulations one by one (pp4–19). They extend the framework to State Nodal Agencies, add Indian Power Exchange transactions as an access route, restructure Regulation 7 to allow use of spare capacity in the Indian portion of a dedicated line and to let a transmission licensee build the Indian portion of a Cross Border Transmission Link with Government of India approval, and rebuild the application, grant, eligibility and fee provisions for connectivity, GNA and T-GNA — CTU handling connectivity and GNA, NLDC handling T-GNA. Regulations 9, 10, 12 and 15 set the application fees, bank-guarantee architecture (application, connectivity and access guarantees) and a detailed relinquishment regime; Regulation 14 sets liability for delayed commercial operation. Later regulations update effectiveness of GNA, communication and cyber-security obligations, curtailment priority (T-GNA first, then GNA), transmission-loss application, transmission charges, and add a new Regulation 33-A requiring CTU to issue a Detailed Procedure with standard formats within three months, with use of the GNA Regulations formats in the interim.

Regulation 28 adds two Annexures (pp20–24): Annexure-I gives the modalities for connectivity/GNA/T-GNA for an Indian generating station supplying exclusively to a neighbouring country through a dedicated line, and Annexure-II gives the methodology for recovering transmission charges for the Indian portion of a Cross Border Transmission Link under the two new Regulation 7 routes. The closing Note records the publication of the 2019 principal regulations and the 2023 First Amendment (p24).

Standard name
Cross Border Trade of Electricity
Primary topics
Cross-border trade, Connectivity and GNA, Open access

Read with this

The regulation

Amendments and corrections

Consolidated copies, for reference (1)

Other copies of these documents (3)

Earlier drafts

3 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document