CERC · Central Electricity Regulatory Commission
Cross Border Trade of Electricity Regulations, 2019 — Second Amendment, 2025
Central Electricity Regulatory Commission (Cross Border Trade of Electricity) (Second Amendment) Regulations, 2025
AmendmentDated 9 Dec 2025No. 13/2/7/2015-PM/CERC dated 9.12.2025
Amends the Cross Border Trade of Electricity Regulations, 2019.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Second Amendment to the CERC (Cross Border Trade of Electricity) Regulations, 2019, notified on 9 December 2025 under s.178 read with s.66 of the Electricity Act 2003 and the Ministry of Power's 2018 cross-border import/export guidelines (p1). It comes into force from Gazette publication; the Gazette date is not printed (p1). Its single organising idea is to replace the principal regulations' long-term access / medium-term / short-term open access vocabulary with the General Network Access (GNA) and Temporary GNA (T-GNA) framework of the 2022 Connectivity and GNA Regulations, and to fold cross-border applicants into that machinery.
Regulation 2 rewrites the definitions clause almost wholesale (pp1–4): access terms become GNA/T-GNA, electricity trading licensees of India and Indian generating stations with dedicated lines to a neighbouring country are brought into the "participating entity" fold, definitions of CTU/GNA/T-GNA and the Communication Regulations 2017 are imported, a "Due Date" (45th day from CTU bill presentation) is created, and several obsolete sub-clauses are deleted. Regulation 2(3) adds a general clause that references to Acts, Rules and Regulations include later amendments and re-enactments.
Regulations 3 to 27 then rework the operative regulations one by one (pp4–19). They extend the framework to State Nodal Agencies, add Indian Power Exchange transactions as an access route, restructure Regulation 7 to allow use of spare capacity in the Indian portion of a dedicated line and to let a transmission licensee build the Indian portion of a Cross Border Transmission Link with Government of India approval, and rebuild the application, grant, eligibility and fee provisions for connectivity, GNA and T-GNA — CTU handling connectivity and GNA, NLDC handling T-GNA. Regulations 9, 10, 12 and 15 set the application fees, bank-guarantee architecture (application, connectivity and access guarantees) and a detailed relinquishment regime; Regulation 14 sets liability for delayed commercial operation. Later regulations update effectiveness of GNA, communication and cyber-security obligations, curtailment priority (T-GNA first, then GNA), transmission-loss application, transmission charges, and add a new Regulation 33-A requiring CTU to issue a Detailed Procedure with standard formats within three months, with use of the GNA Regulations formats in the interim.
Regulation 28 adds two Annexures (pp20–24): Annexure-I gives the modalities for connectivity/GNA/T-GNA for an Indian generating station supplying exclusively to a neighbouring country through a dedicated line, and Annexure-II gives the methodology for recovering transmission charges for the Indian portion of a Cross Border Transmission Link under the two new Regulation 7 routes. The closing Note records the publication of the 2019 principal regulations and the 2023 First Amendment (p24).
Read with this
The regulation
- Dated 8 Mar 2019Cross Border Trade of Electricity Regulations, 2019
Amendments and corrections
Commencement notices and reasons
- Dated 20 Mar 2019Cross Border Trade of Electricity Regulations, 2019 — Statement of Reasons
- Dated 15 Dec 2023Cross Border Trade of Electricity Regulations, 2019 — First Amendment, 2023 — Statement of Reasons
- Dated 8 Feb 2026Cross Border Trade of Electricity Regulations, 2019 — Second Amendment, 2025 — Statement of Reasons
Consolidated copies, for reference (1)
- Dated 8 Mar 2019Cross Border Trade of Electricity Regulations, 2019
Other copies of these documents (3)
- Dated 8 Mar 2019Cross Border Trade of Electricity Regulations, 2019
- Dated 15 Dec 2023Cross Border Trade of Electricity (First Amendment) Regulations, 2023
- Dated 9 Dec 2025Cross Border Trade of Electricity Regulations, 2019 — Second Amendment, 2025
Earlier drafts
- Dated 16 Feb 2017Cross Border Trade of Electricity Regulations, 2017 — Draft
- Dated 14 Jan 2016Explanatory memorandum: Guidelines on Cross Border Trade of Electricity, 2016
- Dated 14 Dec 2016Explanatory memorandum: Cross Border Trade of Electricity — Designation of Designated Authority, 2016
- Released with the notice dated 16 Feb 2017Explanatory memorandum: Explanatory Memorandum — Draft Cross Border Trade of Electricity Regulations, 2017
- Dated 16 Feb 2017Public notice: Draft Cross Border Trade of Electricity Regulations, 2017 — Public Notice
- Dated 7 Apr 2017Notice extending the date for comments: Draft Cross Border Trade of Electricity Regulations, 2017 — comment extension notice
- Dated 7 Apr 2017Notice extending the date for comments: Draft Cross Border Trade of Electricity Regulations, 2017 — Public Notice (Extension-II) — comments deadline extended to 17.04.2017
- Dated 28 Aug 2023Cross Border Trade of Electricity (First Amendment) Regulations, 2023
- Dated 28 Aug 2023Explanatory memorandum: Cross-Border Trade of Electricity (First Amendment) Regulations, 2023 — Explanatory Memorandum — Draft
- Dated 28 Aug 2023Public notice: Cross Border Trade of Electricity (First Amendment) Regulations, 2023 — Draft — Public Notice
- Dated 12 Sep 2023Hearing notice: Public hearing notice — Cross-Border Trade of Electricity (First Amendment) Regulations, 2023
- Dated 31 Dec 2024Cross Border Trade of Electricity (Second Amendment) Regulations, 2024 — Draft
- Dated 31 Dec 2024Public notice: Cross Border Trade of Electricity (Second Amendment) Regulations, 2024 — Draft — Public Notice
- Dated 31 Dec 2024Explanatory memorandum: Cross Border Trade of Electricity Regulations, 2019 — Second Amendment, 2024 — Explanatory Memorandum — Draft
- Dated 29 Jan 2025Notice extending the date for comments: Cross Border Trade of Electricity (Second Amendment) Regulations, 2024 — Public Notice, comments deadline extended to 07.02.2025
- Dated 28 Apr 2025Hearing notice: Public hearing notice — Draft Cross Border Trade of Electricity (Second Amendment) Regulations, 2024
3 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.