Skip to content

CERC · Central Electricity Regulatory Commission

Explanatory Memorandum — Draft Cross Border Trade of Electricity Regulations, 2017

Explanatory Memorandum

Explanatory memorandum to a draftReleased with the notice dated 16 Feb 2017

Draft

The draft has since been finalised as the Cross Border Trade of Electricity Regulations, 2019.

Explanatory memorandum to the Cross Border Trade of Electricity Regulations, 2017 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CERC's explanatory memorandum for the draft CERC (Cross Border Trade of Electricity) Regulations, 2017. It is not the operative regulation text; it explains the background and salient features of what CERC proposes.

Pages 1–3 set the context: growing regional electricity cooperation, the SAARC Framework Agreement, the Ministry of Power Guidelines of 5 December 2016, and existing bilateral trade with Bhutan, Bangladesh, Nepal and Myanmar, with estimated future flows. Pages 3–4 state objectives and scope: bilateral cross-border trade, binding on participating entities, existing agreements to continue until expiry, and references to other regulations to include later amendments.

Pages 4–6 describe the institutional framework: a Designated Authority, Transmission Planning Agency in each neighbouring country, Settlement Nodal Agency, CTU and NLDC roles. Pages 6–7 set eligibility conditions for applicants, including generation, captive and consumer thresholds. Pages 7–9 cover joint transmission planning and implementation of the cross-border link, cost-plus treatment for the Indian portion and tariff under CERC Tariff Regulations, 2014. Pages 9–11 explain connectivity and long-term/medium-term/short-term open access, additional conditions for foreign entities, application fees, bank guarantees, provisional connectivity and processing timelines. Pages 12–13 cover trade through Indian power exchanges and tariff determination, including government-to-government tariff and deemed adoption of existing agreement tariffs.

Pages 13–16 deal with system operations: available margins, scheduling and dispatch under the Grid Code, congestion and curtailment priority, metering, accounting, deviation settlement and SNA settlement. Pages 17–18 set transmission charges, payment security and bank guarantee/sovereign guarantee requirements. Pages 18–19 outline DA responsibilities and a multi-tier dispute settlement mechanism ending at SIAC arbitration.

Standard name
Cross Border Trade of Electricity
Primary topics
Cross-border trade, Open access, Tariff determination

Read with this

The regulation

Consolidated copies, for reference (1)

Other copies of these documents (3)

Earlier drafts

3 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document