CERC · Central Electricity Regulatory Commission
Explanatory Memorandum — Draft Cross Border Trade of Electricity Regulations, 2017
Explanatory Memorandum
Explanatory memorandum to a draftReleased with the notice dated 16 Feb 2017
Draft
The draft has since been finalised as the Cross Border Trade of Electricity Regulations, 2019.
Explanatory memorandum to the Cross Border Trade of Electricity Regulations, 2017 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is CERC's explanatory memorandum for the draft CERC (Cross Border Trade of Electricity) Regulations, 2017. It is not the operative regulation text; it explains the background and salient features of what CERC proposes.
Pages 1–3 set the context: growing regional electricity cooperation, the SAARC Framework Agreement, the Ministry of Power Guidelines of 5 December 2016, and existing bilateral trade with Bhutan, Bangladesh, Nepal and Myanmar, with estimated future flows. Pages 3–4 state objectives and scope: bilateral cross-border trade, binding on participating entities, existing agreements to continue until expiry, and references to other regulations to include later amendments.
Pages 4–6 describe the institutional framework: a Designated Authority, Transmission Planning Agency in each neighbouring country, Settlement Nodal Agency, CTU and NLDC roles. Pages 6–7 set eligibility conditions for applicants, including generation, captive and consumer thresholds. Pages 7–9 cover joint transmission planning and implementation of the cross-border link, cost-plus treatment for the Indian portion and tariff under CERC Tariff Regulations, 2014. Pages 9–11 explain connectivity and long-term/medium-term/short-term open access, additional conditions for foreign entities, application fees, bank guarantees, provisional connectivity and processing timelines. Pages 12–13 cover trade through Indian power exchanges and tariff determination, including government-to-government tariff and deemed adoption of existing agreement tariffs.
Pages 13–16 deal with system operations: available margins, scheduling and dispatch under the Grid Code, congestion and curtailment priority, metering, accounting, deviation settlement and SNA settlement. Pages 17–18 set transmission charges, payment security and bank guarantee/sovereign guarantee requirements. Pages 18–19 outline DA responsibilities and a multi-tier dispute settlement mechanism ending at SIAC arbitration.
Read with this
The regulation
- Dated 8 Mar 2019Cross Border Trade of Electricity Regulations, 2019
Amendments and corrections
Commencement notices and reasons
- Dated 20 Mar 2019Cross Border Trade of Electricity Regulations, 2019 — Statement of Reasons
- Dated 15 Dec 2023Cross Border Trade of Electricity Regulations, 2019 — First Amendment, 2023 — Statement of Reasons
- Dated 8 Feb 2026Cross Border Trade of Electricity Regulations, 2019 — Second Amendment, 2025 — Statement of Reasons
Consolidated copies, for reference (1)
- Dated 8 Mar 2019Cross Border Trade of Electricity Regulations, 2019
Other copies of these documents (3)
- Dated 8 Mar 2019Cross Border Trade of Electricity Regulations, 2019
- Dated 15 Dec 2023Cross Border Trade of Electricity (First Amendment) Regulations, 2023
- Dated 9 Dec 2025Cross Border Trade of Electricity Regulations, 2019 — Second Amendment, 2025
Earlier drafts
- Dated 16 Feb 2017Cross Border Trade of Electricity Regulations, 2017 — Draft
- Dated 14 Jan 2016Explanatory memorandum: Guidelines on Cross Border Trade of Electricity, 2016
- Dated 14 Dec 2016Explanatory memorandum: Cross Border Trade of Electricity — Designation of Designated Authority, 2016
- Dated 16 Feb 2017Public notice: Draft Cross Border Trade of Electricity Regulations, 2017 — Public Notice
- Dated 7 Apr 2017Notice extending the date for comments: Draft Cross Border Trade of Electricity Regulations, 2017 — comment extension notice
- Dated 7 Apr 2017Notice extending the date for comments: Draft Cross Border Trade of Electricity Regulations, 2017 — Public Notice (Extension-II) — comments deadline extended to 17.04.2017
- Dated 28 Aug 2023Cross Border Trade of Electricity (First Amendment) Regulations, 2023
- Dated 28 Aug 2023Explanatory memorandum: Cross-Border Trade of Electricity (First Amendment) Regulations, 2023 — Explanatory Memorandum — Draft
- Dated 28 Aug 2023Public notice: Cross Border Trade of Electricity (First Amendment) Regulations, 2023 — Draft — Public Notice
- Dated 12 Sep 2023Hearing notice: Public hearing notice — Cross-Border Trade of Electricity (First Amendment) Regulations, 2023
- Dated 31 Dec 2024Cross Border Trade of Electricity (Second Amendment) Regulations, 2024 — Draft
- Dated 31 Dec 2024Public notice: Cross Border Trade of Electricity (Second Amendment) Regulations, 2024 — Draft — Public Notice
- Dated 31 Dec 2024Explanatory memorandum: Cross Border Trade of Electricity Regulations, 2019 — Second Amendment, 2024 — Explanatory Memorandum — Draft
- Dated 29 Jan 2025Notice extending the date for comments: Cross Border Trade of Electricity (Second Amendment) Regulations, 2024 — Public Notice, comments deadline extended to 07.02.2025
- Dated 28 Apr 2025Hearing notice: Public hearing notice — Draft Cross Border Trade of Electricity (Second Amendment) Regulations, 2024
3 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft.