CERC · Central Electricity Regulatory Commission
Cross Border Trade of Electricity Regulations, 2019 — Statement of Reasons
Statement of Reasons
Statement of reasonsDated 20 Mar 2019No. 13/2/7/2015-PM/CERC dated 20th March, 2019
The commission's reasons for the Cross Border Trade of Electricity Regulations, 2019 or one of its amendments.
Summary
Summary written by software, from pages 1 to 29 of 75. Check the regulator's original before you rely on it.
This is CERC's Statement of Reasons (No. 13/2/7/2015-PM/CERC, dated 20 March 2019) for the Central Electricity Regulatory Commission (Cross Border Trade of Electricity) Regulations, 2019. It takes each provision in turn, prints the draft text put out for comment in February 2017, summarises the stakeholder comments and the public hearing of 22 March 2017, and records the Commission's analysis, decision and finalised wording (pp1–4). Because the final numbering differs from the draft's, it also serves as the map between the two texts.
The Introduction (pp1–2) sets the statutory basis (s.178 read with s.66, Electricity Act 2003) and explains that the final draft was recast to absorb the Ministry of Power's Guidelines for Import/Export (Cross Border) of Electricity-2018 of 18 December 2018, which replaced the 2016 guidelines and introduced tripartite arrangements across India, approvals by a Designated Authority and access to Indian power exchanges. Twenty-two organisations commented and eleven made oral submissions; the lists are in Annexures I and II (p1).
Regulation 2 on definitions (pp3–13) carries the bulk of the drafting change. 'Applicant' is narrowed to a neighbouring-country entity recognised as a Participating Entity (p5); the proposed Cross Border Transmission Access (CBTA) and its customer and agreement definitions are deleted so that cross border users take the established LTA, MTOA and STOA routes (pp6–8); Cross Border Transmission Link is redrawn and a new Dedicated Transmission System definition added (pp8–10); Connectivity is retained in simplified form (pp10–11); and the document lists which definitions were newly inserted and which twenty-one were dropped as unused (pp11–13).
Scope (Regulation 3, pp13–18) confines Indian entities to the existing Connectivity and STOA Regulations, allows trade through bilateral agreements, bidding, mutual agreements and tripartite arrangements across India, and provides a savings clause for agreements already in force. Institutional Framework (Regulation 4, pp18–21) allocates roles to the Designated Authority, Transmission Planning Agency, Settlement Nodal Agency, NLDC and CTU. Tariff Determination (Regulation 5, pp21–27) sets out the routes for import, export, government-to-government transactions and the cross border transmission link, including the hydro-import proviso and payment of transmission and wheeling charges. Trade through Indian Power Exchanges (Regulation 6, pp27–29) covers eligibility, Designated Authority approval, contract categories, the trading-licensee route and quantum ceilings.
Read with this
The regulation
- Dated 8 Mar 2019Cross Border Trade of Electricity Regulations, 2019
Amendments and corrections
Commencement notices and reasons
Consolidated copies, for reference (1)
- Dated 8 Mar 2019Cross Border Trade of Electricity Regulations, 2019
Other copies of these documents (3)
- Dated 8 Mar 2019Cross Border Trade of Electricity Regulations, 2019
- Dated 15 Dec 2023Cross Border Trade of Electricity (First Amendment) Regulations, 2023
- Dated 9 Dec 2025Cross Border Trade of Electricity Regulations, 2019 — Second Amendment, 2025
Earlier drafts
- Dated 16 Feb 2017Cross Border Trade of Electricity Regulations, 2017 — Draft
- Dated 14 Jan 2016Explanatory memorandum: Guidelines on Cross Border Trade of Electricity, 2016
- Dated 14 Dec 2016Explanatory memorandum: Cross Border Trade of Electricity — Designation of Designated Authority, 2016
- Released with the notice dated 16 Feb 2017Explanatory memorandum: Explanatory Memorandum — Draft Cross Border Trade of Electricity Regulations, 2017
- Dated 16 Feb 2017Public notice: Draft Cross Border Trade of Electricity Regulations, 2017 — Public Notice
- Dated 7 Apr 2017Notice extending the date for comments: Draft Cross Border Trade of Electricity Regulations, 2017 — comment extension notice
- Dated 7 Apr 2017Notice extending the date for comments: Draft Cross Border Trade of Electricity Regulations, 2017 — Public Notice (Extension-II) — comments deadline extended to 17.04.2017
- Dated 28 Aug 2023Cross Border Trade of Electricity (First Amendment) Regulations, 2023
- Dated 28 Aug 2023Explanatory memorandum: Cross-Border Trade of Electricity (First Amendment) Regulations, 2023 — Explanatory Memorandum — Draft
- Dated 28 Aug 2023Public notice: Cross Border Trade of Electricity (First Amendment) Regulations, 2023 — Draft — Public Notice
- Dated 12 Sep 2023Hearing notice: Public hearing notice — Cross-Border Trade of Electricity (First Amendment) Regulations, 2023
- Dated 31 Dec 2024Cross Border Trade of Electricity (Second Amendment) Regulations, 2024 — Draft
- Dated 31 Dec 2024Public notice: Cross Border Trade of Electricity (Second Amendment) Regulations, 2024 — Draft — Public Notice
- Dated 31 Dec 2024Explanatory memorandum: Cross Border Trade of Electricity Regulations, 2019 — Second Amendment, 2024 — Explanatory Memorandum — Draft
- Dated 29 Jan 2025Notice extending the date for comments: Cross Border Trade of Electricity (Second Amendment) Regulations, 2024 — Public Notice, comments deadline extended to 07.02.2025
- Dated 28 Apr 2025Hearing notice: Public hearing notice — Draft Cross Border Trade of Electricity (Second Amendment) Regulations, 2024
3 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.