Skip to content

CERC · Central Electricity Regulatory Commission

Cross Border Trade of Electricity Regulations, 2019 — Statement of Reasons

Statement of Reasons

Statement of reasonsDated 20 Mar 2019No. 13/2/7/2015-PM/CERC dated 20th March, 2019

The commission's reasons for the Cross Border Trade of Electricity Regulations, 2019 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software, from pages 1 to 29 of 75. Check the regulator's original before you rely on it.

This is CERC's Statement of Reasons (No. 13/2/7/2015-PM/CERC, dated 20 March 2019) for the Central Electricity Regulatory Commission (Cross Border Trade of Electricity) Regulations, 2019. It takes each provision in turn, prints the draft text put out for comment in February 2017, summarises the stakeholder comments and the public hearing of 22 March 2017, and records the Commission's analysis, decision and finalised wording (pp1–4). Because the final numbering differs from the draft's, it also serves as the map between the two texts.

The Introduction (pp1–2) sets the statutory basis (s.178 read with s.66, Electricity Act 2003) and explains that the final draft was recast to absorb the Ministry of Power's Guidelines for Import/Export (Cross Border) of Electricity-2018 of 18 December 2018, which replaced the 2016 guidelines and introduced tripartite arrangements across India, approvals by a Designated Authority and access to Indian power exchanges. Twenty-two organisations commented and eleven made oral submissions; the lists are in Annexures I and II (p1).

Regulation 2 on definitions (pp3–13) carries the bulk of the drafting change. 'Applicant' is narrowed to a neighbouring-country entity recognised as a Participating Entity (p5); the proposed Cross Border Transmission Access (CBTA) and its customer and agreement definitions are deleted so that cross border users take the established LTA, MTOA and STOA routes (pp6–8); Cross Border Transmission Link is redrawn and a new Dedicated Transmission System definition added (pp8–10); Connectivity is retained in simplified form (pp10–11); and the document lists which definitions were newly inserted and which twenty-one were dropped as unused (pp11–13).

Scope (Regulation 3, pp13–18) confines Indian entities to the existing Connectivity and STOA Regulations, allows trade through bilateral agreements, bidding, mutual agreements and tripartite arrangements across India, and provides a savings clause for agreements already in force. Institutional Framework (Regulation 4, pp18–21) allocates roles to the Designated Authority, Transmission Planning Agency, Settlement Nodal Agency, NLDC and CTU. Tariff Determination (Regulation 5, pp21–27) sets out the routes for import, export, government-to-government transactions and the cross border transmission link, including the hydro-import proviso and payment of transmission and wheeling charges. Trade through Indian Power Exchanges (Regulation 6, pp27–29) covers eligibility, Designated Authority approval, contract categories, the trading-licensee route and quantum ceilings.

Standard name
Cross Border Trade of Electricity
Primary topics
Cross-border trade, Tariff determination, Power markets and exchanges

Read with this

The regulation

Consolidated copies, for reference (1)

Other copies of these documents (3)

Earlier drafts

3 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document