CERC · Central Electricity Regulatory Commission
Cross Border Trade of Electricity Regulations, 2019
Central Electricity Regulatory Commission (Cross Border Trade of Electricity) Regulations, 2019
RegulationDated 8 Mar 2019No. 13/2/7/2015-PM/CERC dated 8th March, 2019
2 amendments to it are on Voltaic, the latest dated 9 Dec 2025.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Central Electricity Regulatory Commission's (Cross Border Trade of Electricity) Regulations, 2019 (Notification No. 13/2/7/2015-PM/CERC, dated 8 March 2019) create the framework for import and export of electricity between India and its neighbouring countries, and for transactions that cross India between two neighbouring countries. They are made under Section 178 read with Section 66 of the Electricity Act 2003 and the Ministry of Power's guidelines on import and export of electricity, and come into force from the date of publication in the Official Gazette — a date not printed in this text (p1).
Chapter 1 (pp1–9) is preliminary: short title and commencement, plus a long list of definitions that set the vocabulary for the rest — Participating Entity, Cross Border Customer, Designated Authority, Settlement Nodal Agency, Cross Border Transmission Link, Interconnection Point, Access Bank Guarantee, transfer-capability terms and the access categories (long-term, medium-term and short-term).
Chapter 2 (pp9–13) sets scope and general provisions. The regulations apply to Participating Entities in India and neighbouring countries engaged in cross-border trade, while Indian entities seeking grid access for such trade continue under the Connectivity Regulations and STOA Regulations (Reg 3). It allocates institutional roles: the MoP-designated Designated Authority facilitates approvals; a Transmission Planning Agency plans the cross-border transmission; the Settlement Nodal Agency settles grid-operation charges for each neighbouring country; NLDC acts as System Operator and grants short-term open access; CTU grants long-term access and medium-term open access (Reg 4). Tariff for imports may be discovered by competitive bidding per the Tariff Policy or mutually agreed; hydro imports from neighbouring countries can be determined by the Commission if the generator approaches through its government and the Indian buyer agrees; export tariffs may be mutually agreed or bid; government-to-government tariffs are final and continue under existing IGAs until expiry; CBTL tariffs are determined by bidding, G2G negotiation or the Commission (Reg 5). Indian trading licensees may trade on Indian power exchanges on behalf of a neighbouring-country Participating Entity with Designated Authority approval (Reg 6).
Chapter 3 (pp13–25) covers transmission planning, connectivity and access. Cross Border Transmission Links are planned jointly by the two countries' Transmission Planning Agencies with government approval; the link is not part of the basic ISTS network for PoC charges, and its tariff is payable by the Applicant (Reg 7). Participating Entities apply separately for connectivity, long-term access, medium-term open access (to CTU) and short-term open access (to NLDC), with application fees, Designated Authority approval or IGA copy, and — for long-term access — an Access Bank Guarantee (Regs 8–12, 15). Timeframes for CTU processing, delay consequences for generation and transmission projects, operationalisation of long-term access, metering, data communication, system recording, reactive compensation and cyber security are specified (Regs 13–21).
Chapter 4 (pp25–30) governs system operation: reliable and secure operation, no isolation of CBTL except in defined emergencies, assessment of TTC/TRM/ATC with the lower of the two countries' ATC used, 15-minute scheduling, net energy accounting by RPCs, deviation charges under the DSM Regulations, curtailment priority (short-term first, then medium-term, then long-term, pro-rata within a category), event reporting and six-monthly coordination meetings.
Chapter 5 (pp30–32) deals with payment: PoC injection/withdrawal charges under the Sharing Regulations, transmission-loss sharing methodology, system operation fees paid through the Settlement Nodal Agency, and payment security in the form of letters of credit at least 90 days before access commences.
Chapter 6 (pp32–33) covers dispute resolution (Indian disputes under the Act; cross-border disputes mutual for 60 days, then government-level, then international arbitration), bank instruments in Indian rupees from a nationalized Indian bank or a confirmed neighbouring-country bank, and the Commission's powers to relax provisions and issue directions.
Read with this
Amendments and corrections
Commencement notices and reasons
- Dated 20 Mar 2019Cross Border Trade of Electricity Regulations, 2019 — Statement of Reasons
- Dated 15 Dec 2023Cross Border Trade of Electricity Regulations, 2019 — First Amendment, 2023 — Statement of Reasons
- Dated 8 Feb 2026Cross Border Trade of Electricity Regulations, 2019 — Second Amendment, 2025 — Statement of Reasons
Consolidated copies, for reference (1)
- Dated 8 Mar 2019Cross Border Trade of Electricity Regulations, 2019
Other copies of these documents (3)
- Dated 8 Mar 2019Cross Border Trade of Electricity Regulations, 2019
- Dated 15 Dec 2023Cross Border Trade of Electricity (First Amendment) Regulations, 2023
- Dated 9 Dec 2025Cross Border Trade of Electricity Regulations, 2019 — Second Amendment, 2025
Earlier drafts
- Dated 16 Feb 2017Cross Border Trade of Electricity Regulations, 2017 — Draft
- Dated 14 Jan 2016Explanatory memorandum: Guidelines on Cross Border Trade of Electricity, 2016
- Dated 14 Dec 2016Explanatory memorandum: Cross Border Trade of Electricity — Designation of Designated Authority, 2016
- Released with the notice dated 16 Feb 2017Explanatory memorandum: Explanatory Memorandum — Draft Cross Border Trade of Electricity Regulations, 2017
- Dated 16 Feb 2017Public notice: Draft Cross Border Trade of Electricity Regulations, 2017 — Public Notice
- Dated 7 Apr 2017Notice extending the date for comments: Draft Cross Border Trade of Electricity Regulations, 2017 — comment extension notice
- Dated 7 Apr 2017Notice extending the date for comments: Draft Cross Border Trade of Electricity Regulations, 2017 — Public Notice (Extension-II) — comments deadline extended to 17.04.2017
- Dated 28 Aug 2023Cross Border Trade of Electricity (First Amendment) Regulations, 2023
- Dated 28 Aug 2023Explanatory memorandum: Cross-Border Trade of Electricity (First Amendment) Regulations, 2023 — Explanatory Memorandum — Draft
- Dated 28 Aug 2023Public notice: Cross Border Trade of Electricity (First Amendment) Regulations, 2023 — Draft — Public Notice
- Dated 12 Sep 2023Hearing notice: Public hearing notice — Cross-Border Trade of Electricity (First Amendment) Regulations, 2023
- Dated 31 Dec 2024Cross Border Trade of Electricity (Second Amendment) Regulations, 2024 — Draft
- Dated 31 Dec 2024Public notice: Cross Border Trade of Electricity (Second Amendment) Regulations, 2024 — Draft — Public Notice
- Dated 31 Dec 2024Explanatory memorandum: Cross Border Trade of Electricity Regulations, 2019 — Second Amendment, 2024 — Explanatory Memorandum — Draft
- Dated 29 Jan 2025Notice extending the date for comments: Cross Border Trade of Electricity (Second Amendment) Regulations, 2024 — Public Notice, comments deadline extended to 07.02.2025
- Dated 28 Apr 2025Hearing notice: Public hearing notice — Draft Cross Border Trade of Electricity (Second Amendment) Regulations, 2024
3 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of CERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.