Skip to content

CERC · Central Electricity Regulatory Commission

Cross Border Trade of Electricity Regulations, 2019 — Second Amendment, 2024 — Explanatory Memorandum — Draft

Draft Central Electricity Regulatory Commission Cross Border Trade of Electricity) (Second Amendment), Regulations 2024

Explanatory memorandum to a draftDated 31 Dec 2024No. 13/2/7/2015-PM/CERC dated 31.12.2024

Explanatory memorandum to the Cross Border Trade of Electricity (Second Amendment) Regulations, 2024 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CERC's Explanatory Memorandum for the draft Central Electricity Regulatory Commission (Cross Border Trade of Electricity) (Second Amendment) Regulations, 2024, issued on 31.12.2024 (p1). It explains proposed changes to the 2019 CBTE Regulations, as first amended in 2023, and is organised around four themes.

Part A (pp2–5) aligns the CBTE Regulations with the 2022 GNA Regulations. It proposes replacing LTA and MTOA with GNA and STOA with T-GNA, removing old definitions and adding GNA-related definitions; requires separate applications for connectivity and access; confirms that Indian trading licensees engaged in cross-border trade may seek GNA or T-GNA; and proposes application fees, bank guarantees and one-time connectivity charges.

Part B (pp5–9) responds to MoP's 12.08.2024 amendments to the Cross Border Guidelines and DA Procedure. It introduces standby connectivity for Indian generating stations supplying electricity exclusively to a neighbouring country through a dedicated transmission line, allowing connection to the Indian grid under conditions, without deemed GNA. Annexure-I (pp8–9) sets modalities for connectivity, GNA and T-GNA for such entities, including approvals, applications, bank guarantees and timelines.

Part C (pp9–18) deals with planning and implementation of Cross Border Transmission Links and their transmission charges. It describes three CBTL models — jointly planned government-to-government links, entity-owned dedicated lines, and merchant transmission licensee lines — and proposes tariff determination, yearly transmission charge recovery, pro-rata open access charges, sharing of excess recovery, and true-up. It also amends delay treatment, Access Bank Guarantee rules, regulatory compliance references, transmission loss treatment and system-operator coordination.

The document is a draft explanatory memorandum; it does not state an in-force date.

Standard name
Cross Border Trade of Electricity
Primary topics
Cross-border trade, Connectivity and GNA, Transmission tariff

Read with this

The regulation

Consolidated copies, for reference (1)

Other copies of these documents (3)

Earlier drafts

3 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document