CERC · Central Electricity Regulatory Commission
Cross Border Trade of Electricity Regulations, 2019 — Second Amendment, 2024 — Explanatory Memorandum — Draft
Draft Central Electricity Regulatory Commission Cross Border Trade of Electricity) (Second Amendment), Regulations 2024
Explanatory memorandum to a draftDated 31 Dec 2024No. 13/2/7/2015-PM/CERC dated 31.12.2024
Draft
The draft has since been finalised as the Cross Border Trade of Electricity Regulations, 2019 — Second Amendment, 2025.
Explanatory memorandum to the Cross Border Trade of Electricity (Second Amendment) Regulations, 2024 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is CERC's Explanatory Memorandum for the draft Central Electricity Regulatory Commission (Cross Border Trade of Electricity) (Second Amendment) Regulations, 2024, issued on 31.12.2024 (p1). It explains proposed changes to the 2019 CBTE Regulations, as first amended in 2023, and is organised around four themes.
Part A (pp2–5) aligns the CBTE Regulations with the 2022 GNA Regulations. It proposes replacing LTA and MTOA with GNA and STOA with T-GNA, removing old definitions and adding GNA-related definitions; requires separate applications for connectivity and access; confirms that Indian trading licensees engaged in cross-border trade may seek GNA or T-GNA; and proposes application fees, bank guarantees and one-time connectivity charges.
Part B (pp5–9) responds to MoP's 12.08.2024 amendments to the Cross Border Guidelines and DA Procedure. It introduces standby connectivity for Indian generating stations supplying electricity exclusively to a neighbouring country through a dedicated transmission line, allowing connection to the Indian grid under conditions, without deemed GNA. Annexure-I (pp8–9) sets modalities for connectivity, GNA and T-GNA for such entities, including approvals, applications, bank guarantees and timelines.
Part C (pp9–18) deals with planning and implementation of Cross Border Transmission Links and their transmission charges. It describes three CBTL models — jointly planned government-to-government links, entity-owned dedicated lines, and merchant transmission licensee lines — and proposes tariff determination, yearly transmission charge recovery, pro-rata open access charges, sharing of excess recovery, and true-up. It also amends delay treatment, Access Bank Guarantee rules, regulatory compliance references, transmission loss treatment and system-operator coordination.
The document is a draft explanatory memorandum; it does not state an in-force date.
Read with this
The regulation
- Dated 8 Mar 2019Cross Border Trade of Electricity Regulations, 2019
Amendments and corrections
Commencement notices and reasons
- Dated 20 Mar 2019Cross Border Trade of Electricity Regulations, 2019 — Statement of Reasons
- Dated 15 Dec 2023Cross Border Trade of Electricity Regulations, 2019 — First Amendment, 2023 — Statement of Reasons
- Dated 8 Feb 2026Cross Border Trade of Electricity Regulations, 2019 — Second Amendment, 2025 — Statement of Reasons
Consolidated copies, for reference (1)
- Dated 8 Mar 2019Cross Border Trade of Electricity Regulations, 2019
Other copies of these documents (3)
- Dated 8 Mar 2019Cross Border Trade of Electricity Regulations, 2019
- Dated 15 Dec 2023Cross Border Trade of Electricity (First Amendment) Regulations, 2023
- Dated 9 Dec 2025Cross Border Trade of Electricity Regulations, 2019 — Second Amendment, 2025
Earlier drafts
- Dated 16 Feb 2017Cross Border Trade of Electricity Regulations, 2017 — Draft
- Dated 14 Jan 2016Explanatory memorandum: Guidelines on Cross Border Trade of Electricity, 2016
- Dated 14 Dec 2016Explanatory memorandum: Cross Border Trade of Electricity — Designation of Designated Authority, 2016
- Released with the notice dated 16 Feb 2017Explanatory memorandum: Explanatory Memorandum — Draft Cross Border Trade of Electricity Regulations, 2017
- Dated 16 Feb 2017Public notice: Draft Cross Border Trade of Electricity Regulations, 2017 — Public Notice
- Dated 7 Apr 2017Notice extending the date for comments: Draft Cross Border Trade of Electricity Regulations, 2017 — comment extension notice
- Dated 7 Apr 2017Notice extending the date for comments: Draft Cross Border Trade of Electricity Regulations, 2017 — Public Notice (Extension-II) — comments deadline extended to 17.04.2017
- Dated 28 Aug 2023Cross Border Trade of Electricity (First Amendment) Regulations, 2023
- Dated 28 Aug 2023Explanatory memorandum: Cross-Border Trade of Electricity (First Amendment) Regulations, 2023 — Explanatory Memorandum — Draft
- Dated 28 Aug 2023Public notice: Cross Border Trade of Electricity (First Amendment) Regulations, 2023 — Draft — Public Notice
- Dated 12 Sep 2023Hearing notice: Public hearing notice — Cross-Border Trade of Electricity (First Amendment) Regulations, 2023
- Dated 31 Dec 2024Cross Border Trade of Electricity (Second Amendment) Regulations, 2024 — Draft
- Dated 31 Dec 2024Public notice: Cross Border Trade of Electricity (Second Amendment) Regulations, 2024 — Draft — Public Notice
- Dated 29 Jan 2025Notice extending the date for comments: Cross Border Trade of Electricity (Second Amendment) Regulations, 2024 — Public Notice, comments deadline extended to 07.02.2025
- Dated 28 Apr 2025Hearing notice: Public hearing notice — Draft Cross Border Trade of Electricity (Second Amendment) Regulations, 2024
3 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.