CERC · Central Electricity Regulatory Commission
Cross Border Trade of Electricity (Second Amendment) Regulations, 2024 — Draft
Central Electricity Regulatory Commission (Cross Border Trade of Electricity) (Second Amendment) Regulations, 2024
Draft amendmentDated 31 Dec 2024No. 13/2/7/2015-PM/CERC dated 31.12.2024
Draft
A proposal that has since been finalised as the Cross Border Trade of Electricity Regulations, 2019 — Second Amendment, 2025.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a draft CERC notification dated 31 December 2024 (No. 13/2/7/2015-PM/CERC) proposing the Second Amendment to the CERC (Cross Border Trade of Electricity) Regulations, 2019 (p1). It is made under section 178 read with section 66 of the Electricity Act 2003 and the Ministry of Power's 2018 Guidelines on Import/Export (Cross Border) of Electricity (p1).
The bulk of the draft — clauses 2 to 26, running from page 1 to page 16 — is a clause-by-clause rewrite of the 2019 Principal Regulations. Its organising idea is to replace the older access categories (long-term access, medium-term and short-term open access) with General Network Access (GNA) and Temporary GNA (T-GNA) as defined in the CERC GNA Regulations, 2022, and to extend applicant eligibility to electricity trading licensees of India (pp1–10). The Regulation 2 amendments add new definitions — GNA, T-GNA and Communication Regulations — and redefine Cross Border Customer, Cross Border Transmission Link and Dedicated Transmission System, while deleting superseded sub-clauses (pp1–4). Later clauses rework the application, bank-guarantee, exit, relinquishment and encashment regime (Regulations 9, 10, 12, 15), the procedures for grant of connectivity by CTU and of T-GNA by NLDC (Regulations 10 and 11), who develops and maintains a cross-border link and its Indian portion (Regulation 7, pp5–6), the consequences of delay in commissioning on either side (Regulations 14 and 15, pp10–13), communication and cyber-security obligations (Regulations 18 and 21, p14), curtailment priority (Regulation 27, p15) and the basis for transmission charges and losses (Regulations 30 and 31, pp15–16).
The draft closes with two new Annexures. Annexure-I (pp17–18) sets out the step-by-step modalities for connectivity, GNA and T-GNA for a generating station supplying power exclusively to a neighbouring country through a dedicated transmission system. Annexure-II (pp19–21) gives the methodology for determining and recovering transmission charges on the Indian portion of a cross-border link developed by a participating entity or by a transmission licensee, including the per-unit rate, over-drawal and over-injection charges and the sharing of over-recovery. A closing Note records the Gazette publication details of the 2019 Principal Regulations and the 2023 First Amendment (p21).
Read with this
The regulation
- Dated 8 Mar 2019Cross Border Trade of Electricity Regulations, 2019
Amendments and corrections
Commencement notices and reasons
- Dated 20 Mar 2019Cross Border Trade of Electricity Regulations, 2019 — Statement of Reasons
- Dated 15 Dec 2023Cross Border Trade of Electricity Regulations, 2019 — First Amendment, 2023 — Statement of Reasons
- Dated 8 Feb 2026Cross Border Trade of Electricity Regulations, 2019 — Second Amendment, 2025 — Statement of Reasons
Consolidated copies, for reference (1)
- Dated 8 Mar 2019Cross Border Trade of Electricity Regulations, 2019
Other copies of these documents (3)
- Dated 8 Mar 2019Cross Border Trade of Electricity Regulations, 2019
- Dated 15 Dec 2023Cross Border Trade of Electricity (First Amendment) Regulations, 2023
- Dated 9 Dec 2025Cross Border Trade of Electricity Regulations, 2019 — Second Amendment, 2025
Earlier drafts
- Dated 16 Feb 2017Cross Border Trade of Electricity Regulations, 2017 — Draft
- Dated 14 Jan 2016Explanatory memorandum: Guidelines on Cross Border Trade of Electricity, 2016
- Dated 14 Dec 2016Explanatory memorandum: Cross Border Trade of Electricity — Designation of Designated Authority, 2016
- Released with the notice dated 16 Feb 2017Explanatory memorandum: Explanatory Memorandum — Draft Cross Border Trade of Electricity Regulations, 2017
- Dated 16 Feb 2017Public notice: Draft Cross Border Trade of Electricity Regulations, 2017 — Public Notice
- Dated 7 Apr 2017Notice extending the date for comments: Draft Cross Border Trade of Electricity Regulations, 2017 — comment extension notice
- Dated 7 Apr 2017Notice extending the date for comments: Draft Cross Border Trade of Electricity Regulations, 2017 — Public Notice (Extension-II) — comments deadline extended to 17.04.2017
- Dated 28 Aug 2023Cross Border Trade of Electricity (First Amendment) Regulations, 2023
- Dated 28 Aug 2023Explanatory memorandum: Cross-Border Trade of Electricity (First Amendment) Regulations, 2023 — Explanatory Memorandum — Draft
- Dated 28 Aug 2023Public notice: Cross Border Trade of Electricity (First Amendment) Regulations, 2023 — Draft — Public Notice
- Dated 12 Sep 2023Hearing notice: Public hearing notice — Cross-Border Trade of Electricity (First Amendment) Regulations, 2023
- Dated 31 Dec 2024Public notice: Cross Border Trade of Electricity (Second Amendment) Regulations, 2024 — Draft — Public Notice
- Dated 31 Dec 2024Explanatory memorandum: Cross Border Trade of Electricity Regulations, 2019 — Second Amendment, 2024 — Explanatory Memorandum — Draft
- Dated 29 Jan 2025Notice extending the date for comments: Cross Border Trade of Electricity (Second Amendment) Regulations, 2024 — Public Notice, comments deadline extended to 07.02.2025
- Dated 28 Apr 2025Hearing notice: Public hearing notice — Draft Cross Border Trade of Electricity (Second Amendment) Regulations, 2024
3 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.