CERC · Central Electricity Regulatory Commission
Cross Border Trade of Electricity Regulations, 2019 — Second Amendment, 2025
Central Electricity Regulatory Commission (Cross Border Trade of Electricity) (Second Amendment) Regulations, 2025
Amendment · Gazette copyDated 9 Dec 2025Published in the Gazette 19 Dec 2025F. No. 13/2/7/2015-PM/CERC dated 9th December, 2025
The Gazette copy of the Cross Border Trade of Electricity Regulations, 2019 — Second Amendment, 2025.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the second amendment to CERC's Cross Border Trade of Electricity Regulations, 2019. It is short-titled on page 13 and is made under Section 178 read with Section 66 of the Electricity Act 2003, and under the Ministry of Power's 2018 Guidelines on Import/Export (Cross Border) of Electricity. It comes into force from the date of publication in the Official Gazette — the Gazette is dated 19 December 2025 (p1), while the notification itself is dated 9 December 2025 (p13).
The dominant move is terminological and structural: across the Principal Regulations the old access vocabulary — long-term access, medium-term open access, short-term open access, and references to the Connectivity and STOA Regulations — is replaced by General Network Access (GNA) and Temporary GNA (T-GNA) under the GNA Regulations, 2022. Clause 2 rewrites the definition clause, inserting GNA, T-GNA, GNA Regulations, Communication Regulations and a new 'Due Date', deleting several sub-clauses, and adding a general interpretation clause that references to Acts/Rules/Regulations include later amendments (pp13–15).
Clauses 3 to 8 (pp15–18) rework the architecture of who applies where: connectivity and GNA applications go to CTU, T-GNA applications to NLDC, with separate application routes for injection into and drawal from the Indian grid, and an express route for electricity trading licensees of India. Clauses 9 to 14 (pp16–21) rebuild the fee and bank-guarantee regime — non-refundable application fees, application bank guarantees and access bank guarantees, one-time connectivity charges, and a detailed treatment of relinquishment of GNA with different outcomes depending on whether a contract has been awarded, whether GNA is effective, and whether augmentation is involved. Clause 6 (pp15–16) newly allows spare capacity on the Indian portion of a dedicated transmission system to be used under open access, and lets a transmission licensee develop the Indian portion of a Cross Border Transmission Link with Government of India approvals.
Clauses 15 to 25 (pp21–23) update effectiveness/operationalisation wording, communication and cyber-security obligations for Participating Entities, control-room manning, curtailment priority (T-GNA curtailed before GNA, bilateral before collective transactions), transmission-charge heads for the Indian grid and for CBTLs, and the transmission-loss rule. Clause 27 inserts a new Regulation 33-A requiring CTU, as nodal agency, to issue a Detailed Procedure for Connectivity and GNA, with prescribed formats, within three months, with a transitional proviso pending issuance of those formats (p23). Clause 28 adds Annexure-I, the modalities for connectivity/GNA/T-GNA for an entity supplying power exclusively to a neighbouring country through a dedicated system under Regulation 10(7) (pp24–25), and Annexure-II, the methodology for recovering transmission charges on the Indian portion of a Cross Border Transmission Link, whether used under open access or booked on a dedicated basis, including treatment of over-recovery (pp25–26). The closing Note merely records where the Principal Regulations and the First Amendment were published (p26).
Read with this
The regulation
- Dated 8 Mar 2019Cross Border Trade of Electricity Regulations, 2019
Amendments and corrections
Commencement notices and reasons
- Dated 20 Mar 2019Cross Border Trade of Electricity Regulations, 2019 — Statement of Reasons
- Dated 15 Dec 2023Cross Border Trade of Electricity Regulations, 2019 — First Amendment, 2023 — Statement of Reasons
- Dated 8 Feb 2026Cross Border Trade of Electricity Regulations, 2019 — Second Amendment, 2025 — Statement of Reasons
Consolidated copies, for reference (1)
- Dated 8 Mar 2019Cross Border Trade of Electricity Regulations, 2019
Other copies of these documents (2)
- Dated 8 Mar 2019Cross Border Trade of Electricity Regulations, 2019
- Dated 15 Dec 2023Cross Border Trade of Electricity (First Amendment) Regulations, 2023
Earlier drafts
- Dated 16 Feb 2017Cross Border Trade of Electricity Regulations, 2017 — Draft
- Dated 14 Jan 2016Explanatory memorandum: Guidelines on Cross Border Trade of Electricity, 2016
- Dated 14 Dec 2016Explanatory memorandum: Cross Border Trade of Electricity — Designation of Designated Authority, 2016
- Released with the notice dated 16 Feb 2017Explanatory memorandum: Explanatory Memorandum — Draft Cross Border Trade of Electricity Regulations, 2017
- Dated 16 Feb 2017Public notice: Draft Cross Border Trade of Electricity Regulations, 2017 — Public Notice
- Dated 7 Apr 2017Notice extending the date for comments: Draft Cross Border Trade of Electricity Regulations, 2017 — comment extension notice
- Dated 7 Apr 2017Notice extending the date for comments: Draft Cross Border Trade of Electricity Regulations, 2017 — Public Notice (Extension-II) — comments deadline extended to 17.04.2017
- Dated 28 Aug 2023Cross Border Trade of Electricity (First Amendment) Regulations, 2023
- Dated 28 Aug 2023Explanatory memorandum: Cross-Border Trade of Electricity (First Amendment) Regulations, 2023 — Explanatory Memorandum — Draft
- Dated 28 Aug 2023Public notice: Cross Border Trade of Electricity (First Amendment) Regulations, 2023 — Draft — Public Notice
- Dated 12 Sep 2023Hearing notice: Public hearing notice — Cross-Border Trade of Electricity (First Amendment) Regulations, 2023
- Dated 31 Dec 2024Cross Border Trade of Electricity (Second Amendment) Regulations, 2024 — Draft
- Dated 31 Dec 2024Public notice: Cross Border Trade of Electricity (Second Amendment) Regulations, 2024 — Draft — Public Notice
- Dated 31 Dec 2024Explanatory memorandum: Cross Border Trade of Electricity Regulations, 2019 — Second Amendment, 2024 — Explanatory Memorandum — Draft
- Dated 29 Jan 2025Notice extending the date for comments: Cross Border Trade of Electricity (Second Amendment) Regulations, 2024 — Public Notice, comments deadline extended to 07.02.2025
- Dated 28 Apr 2025Hearing notice: Public hearing notice — Draft Cross Border Trade of Electricity (Second Amendment) Regulations, 2024
3 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.