CERC · Central Electricity Regulatory Commission

Cross Border Trade of Electricity Regulations, 2019 — Second Amendment, 2025

Central Electricity Regulatory Commission (Cross Border Trade of Electricity) (Second Amendment) Regulations, 2025

Amendment · Gazette copyDated 9 Dec 2025Published in the Gazette 19 Dec 2025F. No. 13/2/7/2015-PM/CERC dated 9th December, 2025

The Gazette copy of the Cross Border Trade of Electricity Regulations, 2019 — Second Amendment, 2025.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the second amendment to CERC's Cross Border Trade of Electricity Regulations, 2019. It is short-titled on page 13 and is made under Section 178 read with Section 66 of the Electricity Act 2003, and under the Ministry of Power's 2018 Guidelines on Import/Export (Cross Border) of Electricity. It comes into force from the date of publication in the Official Gazette — the Gazette is dated 19 December 2025 (p1), while the notification itself is dated 9 December 2025 (p13).

The dominant move is terminological and structural: across the Principal Regulations the old access vocabulary — long-term access, medium-term open access, short-term open access, and references to the Connectivity and STOA Regulations — is replaced by General Network Access (GNA) and Temporary GNA (T-GNA) under the GNA Regulations, 2022. Clause 2 rewrites the definition clause, inserting GNA, T-GNA, GNA Regulations, Communication Regulations and a new 'Due Date', deleting several sub-clauses, and adding a general interpretation clause that references to Acts/Rules/Regulations include later amendments (pp13–15).

Clauses 3 to 8 (pp15–18) rework the architecture of who applies where: connectivity and GNA applications go to CTU, T-GNA applications to NLDC, with separate application routes for injection into and drawal from the Indian grid, and an express route for electricity trading licensees of India. Clauses 9 to 14 (pp16–21) rebuild the fee and bank-guarantee regime — non-refundable application fees, application bank guarantees and access bank guarantees, one-time connectivity charges, and a detailed treatment of relinquishment of GNA with different outcomes depending on whether a contract has been awarded, whether GNA is effective, and whether augmentation is involved. Clause 6 (pp15–16) newly allows spare capacity on the Indian portion of a dedicated transmission system to be used under open access, and lets a transmission licensee develop the Indian portion of a Cross Border Transmission Link with Government of India approvals.

Clauses 15 to 25 (pp21–23) update effectiveness/operationalisation wording, communication and cyber-security obligations for Participating Entities, control-room manning, curtailment priority (T-GNA curtailed before GNA, bilateral before collective transactions), transmission-charge heads for the Indian grid and for CBTLs, and the transmission-loss rule. Clause 27 inserts a new Regulation 33-A requiring CTU, as nodal agency, to issue a Detailed Procedure for Connectivity and GNA, with prescribed formats, within three months, with a transitional proviso pending issuance of those formats (p23). Clause 28 adds Annexure-I, the modalities for connectivity/GNA/T-GNA for an entity supplying power exclusively to a neighbouring country through a dedicated system under Regulation 10(7) (pp24–25), and Annexure-II, the methodology for recovering transmission charges on the Indian portion of a Cross Border Transmission Link, whether used under open access or booked on a dedicated basis, including treatment of over-recovery (pp25–26). The closing Note merely records where the Principal Regulations and the First Amendment were published (p26).

Standard name
Cross Border Trade of Electricity
Primary topics
Cross-border trade, Connectivity and GNA, Open access

Read with this

The regulation

Consolidated copies, for reference (1)

Other copies of these documents (2)

Earlier drafts

3 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗