CERC · Central Electricity Regulatory Commission
Terms and Conditions of Tariff (Second Amendment) Regulations, 2007 — UI Charges
Central Electricity Regulatory Commission (Terms and Conditions of Tariff) (Second Amendment) Regulations, 2007
Amendment · Gazette copyDated 26 Apr 2007Published in the Gazette 27 Apr 2007In force from 30 Apr 2007No. L-7/25(5)/2003-CERC dated 26th April, 2007
Replaced by Terms and Conditions of Tariff Regulations, 2009
See that regulation for the date it took effect and for anything it keeps in force.
The Gazette copy of the Terms and Conditions of Tariff Regulations, 2004 — Second Amendment, 2007.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a Central Electricity Regulatory Commission notification published in the Gazette of India (Extraordinary) on 27 April 2007 (p1), issued on 26 April 2007 under section 178 of the Electricity Act, 2003. It is the Second Amendment to the CERC (Terms and Conditions of Tariff) Regulations, 2004 — the "principal regulations" — and it is a narrow, single-subject amendment: it rewrites the Unscheduled Interchange (UI) Charges provision in full (p3–4).
The operative part has three clauses. Clause 1 gives the short title and states that the regulations take effect from 00.00 hours of 30 April 2007 (p4). Clause 2 substitutes Regulation 24 and clause 3 substitutes Regulation 42 of the principal regulations, both with identically worded new text (p4–6). The substituted provision defines UI for a generator and for a beneficiary, requires UI to be worked out for every 15-minute time block, and settles all UI transactions on the average frequency of the block under a frequency-linked rate schedule — a table of average-frequency bands in Hz mapped to a UI rate in paise per kWh, running from a zero rate at the top of the frequency range down to its highest rate at the bottom (p4–5). The text also states the paise-per-kWh value of each 0.02 Hz step in three frequency ranges (p4).
Two notes follow each substituted regulation. The first reserves the Commission's power to change the frequency range and UI rates through a separate notification (p4, p5). The second creates a safe harbour from allegations of gaming — generation up to a stated share of declared capacity in a 15-minute block and averaging up to a stated share over a day is not treated as gaming and earns UI charges — and beyond that, requires the Regional Load Despatch Centre to investigate; if gaming is found, the generator's UI charges on that excess generation are reduced to zero and the amount is adjusted in beneficiaries' UI accounts in proportion to their capacity share in the station (p5–6).
The closing note records the notification history of the principal regulations and the four amendments made to them before this one (p6). The whole document is essentially about how deviation from schedule is priced and policed on a frequency basis.
Read with this
The regulation
- Dated 26 Mar 2004Terms and Conditions of Tariff Regulations, 2004
Amendments and corrections
- Dated 11 Aug 2005Terms and Conditions of Tariff (First Amendment) Regulations, 2005
- Dated 13 Mar 2007Terms and Conditions of Tariff (Amendment) Regulations, 2007
- Dated 26 Apr 2007Terms and Conditions of Tariff Regulations, 2004 — Second Amendment, 2007
- Dated 27 Sep 2007Terms and Conditions of Tariff Regulations, 2004 — Third Amendment, 2007
- Dated 28 Dec 2007Terms and Conditions of Tariff (Fourth Amendment) Regulations, 2007
Procedures and orders made under it
Other copies of these documents (3)
- Dated 26 Mar 2004Terms and Conditions of Tariff Regulations, 2004
- Dated 13 Mar 2007Terms and Conditions of Tariff (Amendment) Regulations, 2007
- Dated 28 Dec 2007Terms and Conditions of Tariff Regulations, 2004 — Fourth Amendment, 2007
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.