Terms and Conditions of Tariff (Second Amendment) Regulations, 2007 — UI Charges

Central Electricity Regulatory Commission (Terms and Conditions of Tariff) (Second Amendment) Regulations, 2007

Amendment · Gazette copyDated 26 Apr 2007Published in the Gazette 27 Apr 2007In force from 30 Apr 2007No. L-7/25(5)/2003-CERC dated 26th April, 2007

Replaced by Terms and Conditions of Tariff Regulations, 2009

See that regulation for the date it took effect and for anything it keeps in force.

The Gazette copy of the Terms and Conditions of Tariff Regulations, 2004 — Second Amendment, 2007.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a Central Electricity Regulatory Commission notification published in the Gazette of India (Extraordinary) on 27 April 2007 (p1), issued on 26 April 2007 under section 178 of the Electricity Act, 2003. It is the Second Amendment to the CERC (Terms and Conditions of Tariff) Regulations, 2004 — the "principal regulations" — and it is a narrow, single-subject amendment: it rewrites the Unscheduled Interchange (UI) Charges provision in full (p3–4).

The operative part has three clauses. Clause 1 gives the short title and states that the regulations take effect from 00.00 hours of 30 April 2007 (p4). Clause 2 substitutes Regulation 24 and clause 3 substitutes Regulation 42 of the principal regulations, both with identically worded new text (p4–6). The substituted provision defines UI for a generator and for a beneficiary, requires UI to be worked out for every 15-minute time block, and settles all UI transactions on the average frequency of the block under a frequency-linked rate schedule — a table of average-frequency bands in Hz mapped to a UI rate in paise per kWh, running from a zero rate at the top of the frequency range down to its highest rate at the bottom (p4–5). The text also states the paise-per-kWh value of each 0.02 Hz step in three frequency ranges (p4).

Two notes follow each substituted regulation. The first reserves the Commission's power to change the frequency range and UI rates through a separate notification (p4, p5). The second creates a safe harbour from allegations of gaming — generation up to a stated share of declared capacity in a 15-minute block and averaging up to a stated share over a day is not treated as gaming and earns UI charges — and beyond that, requires the Regional Load Despatch Centre to investigate; if gaming is found, the generator's UI charges on that excess generation are reduced to zero and the amount is adjusted in beneficiaries' UI accounts in proportion to their capacity share in the station (p5–6).

The closing note records the notification history of the principal regulations and the four amendments made to them before this one (p6). The whole document is essentially about how deviation from schedule is priced and policed on a frequency basis.

Standard name
Tariff Regulations
Primary topics
Deviation settlement (DSM)

Read with this

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗