Terms and Conditions of Tariff Regulations, 2004 — Appendix-I Part-I Tariff Filing Forms (Thermal)

Appendix-I PART-I TARIFF FILING FORMS (THERMAL)

OrderDate not stated

Replaced by Terms and Conditions of Tariff Regulations, 2009

See that regulation for the date it took effect and for anything it keeps in force.

Made under the Terms and Conditions of Tariff Regulations, 2004.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is Appendix-I Part-I of CERC's thermal tariff filing material: a set of blank forms, checklists and notes that a generating company must complete when filing a tariff petition for a thermal station (p1–2). It is not a substantive tariff regulation and sets no numerical norms; it specifies what information the Commission requires and how it is to be presented.

Part-I opens with a checklist of forms and supporting documents to be ticked, covering the Summary Sheet, Plant Characteristics, foreign loans, construction/supply/service packages, financial package up to COD, project-specific loans, additional capitalisation after COD, depreciation, interest on loans, advance against depreciation and interest on working capital, plus loan agreements, BPSA/PPA copies and other information (p2).

The Summary Sheet gives a year-wise tabulation of cost and energy-charge elements such as depreciation, interest on loan, return on equity, AAD, interest on working capital, O&M expenses and primary/secondary fuel energy charges (p3). Form-2 captures plant characteristics, fuels, cooling system and environmental features (p4). Form-3 is the normative-parameter form, listing the parameters used in tariff computations — return on equity, availability, PLF, auxiliary consumption, heat rate, fuel-oil consumption, O&M, working-capital components, incentive rate and fuel-stock periods (p5).

The capital-cost forms require an abstract of admitted capital cost with the relevant CERC order reference (p6), new-project estimates (p7), and detailed break-ups of capital cost for coal/lignite-based projects and a variant with WHRB island (p8, p10). Form-5D breaks construction/supply/service packages down by award route, dates, value and expenditure up to COD (p12). Loan forms capture project-specific loans and allocation of corporate loans, with detailed notes on source, currency, interest type, base rate, margin, caps/floors, moratorium, repayment and exchange rates (p13–14).

Later forms cover additional capitalisation after COD (p15), depreciation rate calculation against CERC's depreciation schedule (p17), interest on working capital (p18) and fuel details for energy computation (p19).

Standard name
Tariff Regulations
Primary topics
Tariff determination, Capital cost and investment, Return, financing and working capital

Read with this

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.