Terms and Conditions of Tariff Regulations, 2004 — Appendix-I Part-I Tariff Filing Forms (Thermal)
Appendix-I PART-I TARIFF FILING FORMS (THERMAL)
OrderDate not stated
Replaced by Terms and Conditions of Tariff Regulations, 2009
See that regulation for the date it took effect and for anything it keeps in force.
Made under the Terms and Conditions of Tariff Regulations, 2004.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is Appendix-I Part-I of CERC's thermal tariff filing material: a set of blank forms, checklists and notes that a generating company must complete when filing a tariff petition for a thermal station (p1–2). It is not a substantive tariff regulation and sets no numerical norms; it specifies what information the Commission requires and how it is to be presented.
Part-I opens with a checklist of forms and supporting documents to be ticked, covering the Summary Sheet, Plant Characteristics, foreign loans, construction/supply/service packages, financial package up to COD, project-specific loans, additional capitalisation after COD, depreciation, interest on loans, advance against depreciation and interest on working capital, plus loan agreements, BPSA/PPA copies and other information (p2).
The Summary Sheet gives a year-wise tabulation of cost and energy-charge elements such as depreciation, interest on loan, return on equity, AAD, interest on working capital, O&M expenses and primary/secondary fuel energy charges (p3). Form-2 captures plant characteristics, fuels, cooling system and environmental features (p4). Form-3 is the normative-parameter form, listing the parameters used in tariff computations — return on equity, availability, PLF, auxiliary consumption, heat rate, fuel-oil consumption, O&M, working-capital components, incentive rate and fuel-stock periods (p5).
The capital-cost forms require an abstract of admitted capital cost with the relevant CERC order reference (p6), new-project estimates (p7), and detailed break-ups of capital cost for coal/lignite-based projects and a variant with WHRB island (p8, p10). Form-5D breaks construction/supply/service packages down by award route, dates, value and expenditure up to COD (p12). Loan forms capture project-specific loans and allocation of corporate loans, with detailed notes on source, currency, interest type, base rate, margin, caps/floors, moratorium, repayment and exchange rates (p13–14).
Later forms cover additional capitalisation after COD (p15), depreciation rate calculation against CERC's depreciation schedule (p17), interest on working capital (p18) and fuel details for energy computation (p19).
Read with this
The regulation
- Dated 26 Mar 2004Terms and Conditions of Tariff Regulations, 2004
Amendments and corrections
- Dated 11 Aug 2005Terms and Conditions of Tariff (First Amendment) Regulations, 2005
- Dated 13 Mar 2007Terms and Conditions of Tariff (Amendment) Regulations, 2007
- Dated 26 Apr 2007Terms and Conditions of Tariff Regulations, 2004 — Second Amendment, 2007
- Dated 27 Sep 2007Terms and Conditions of Tariff Regulations, 2004 — Third Amendment, 2007
- Dated 28 Dec 2007Terms and Conditions of Tariff (Fourth Amendment) Regulations, 2007
Procedures and orders made under it
Other copies of these documents (4)
- Dated 26 Mar 2004Terms and Conditions of Tariff Regulations, 2004
- Dated 13 Mar 2007Terms and Conditions of Tariff (Amendment) Regulations, 2007
- Dated 26 Apr 2007Terms and Conditions of Tariff (Second Amendment) Regulations, 2007 — UI Charges
- Dated 28 Dec 2007Terms and Conditions of Tariff Regulations, 2004 — Fourth Amendment, 2007
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.