CERC · Central Electricity Regulatory Commission
Terms and Conditions of Tariff Regulations, 2004 — Third Amendment, 2007
Central Electricity Regulatory Commission (Terms and Conditions of Tariff) (Third Amendment) Regulations, 2007
AmendmentDated 27 Sep 2007In force from 1 Oct 2007No. L-7/25(5)/2003-CERC dated the 27th September, 2007
Replaced by Terms and Conditions of Tariff Regulations, 2009
See that regulation for the date it took effect and for anything it keeps in force.
Amends the Terms and Conditions of Tariff Regulations, 2004.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Central Electricity Regulatory Commission's Third Amendment in 2007 to the CERC (Terms and Conditions of Tariff) Regulations, 2004. Issued on 27 September 2007 and brought into force on 1 October 2007, it substitutes Regulation 16 of the principal regulations in full, replacing the existing norms of operation with a new set (p1).
The substituted Regulation 16 specifies the operating norms that determine recovery of full capacity (fixed) charges and eligibility for incentives. It sets target availability and target plant load factor for incentive for thermal stations, with separate treatment for specified Neyveli Lignite Corporation units (p1). It then lays down gross station heat rate norms for coal-based units by size and stabilization status, with station-specific carve-outs for Talcher and Tanda; a lignite moisture multiplier; and gas turbine/combined cycle norms for existing NTPC stations, post-1.4.2004 stations, and small gas stations (p2–3). It also specifies secondary fuel oil consumption norms for coal and lignite stations (p3–4), auxiliary energy consumption norms differentiated by cooling arrangement and boiler feed pump type (p4–5), and stabilization periods for coal/lignite and gas stations (p5).
The amendment says relaxed stabilization-period norms cease from 1.4.2006 (p5). A final note lists the principal regulations and the prior 2004–2007 amendments for version history (p5). For analysts, this is the operative CERC text on thermal/gas operating norms and the benchmark against which fixed-charge recovery and incentives were assessed.
Read with this
The regulation
- Dated 26 Mar 2004Terms and Conditions of Tariff Regulations, 2004
Amendments and corrections
- Dated 11 Aug 2005Terms and Conditions of Tariff (First Amendment) Regulations, 2005
- Dated 13 Mar 2007Terms and Conditions of Tariff (Amendment) Regulations, 2007
- Dated 26 Apr 2007Terms and Conditions of Tariff Regulations, 2004 — Second Amendment, 2007
- Dated 28 Dec 2007Terms and Conditions of Tariff (Fourth Amendment) Regulations, 2007
Procedures and orders made under it
Other copies of these documents (4)
- Dated 26 Mar 2004Terms and Conditions of Tariff Regulations, 2004
- Dated 13 Mar 2007Terms and Conditions of Tariff (Amendment) Regulations, 2007
- Dated 26 Apr 2007Terms and Conditions of Tariff (Second Amendment) Regulations, 2007 — UI Charges
- Dated 28 Dec 2007Terms and Conditions of Tariff Regulations, 2004 — Fourth Amendment, 2007
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.