Terms and Conditions of Tariff (Amendment) Regulations, 2007

Central Electricity Regulatory Commission (Terms and Conditions of Tariff) (Amendment) Regulations, 2007

Amendment · Gazette copyDated 13 Mar 2007Published in the Gazette 14 Mar 2007In force from 1 Apr 2007L-7/25(5)/2003-CERC dated 13th March, 2007

Replaced by Terms and Conditions of Tariff Regulations, 2009

See that regulation for the date it took effect and for anything it keeps in force.

The Gazette copy of the Terms and Conditions of Tariff (Amendment) Regulations, 2007.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Gazette of India (Extraordinary), Part III—Section 4, No. 60 of 14 March 2007 carries a Central Electricity Regulatory Commission notification dated 13 March 2007, No. L-7/25(5)/2003-CERC (p1, p4). Made under section 178 of the Electricity Act, 2003 and issued after previous publication, it further amends the CERC (Terms and Conditions of Tariff) Regulations, 2004 — "the principal regulations" (p4).

The operative text is two regulations. Regulation 1 gives the short title — CERC (Terms and Conditions of Tariff) (Amendment) Regulations, 2007 — and brings them into force on 1 April 2007 (p4). Regulation 2 substitutes Regulation 16 of the principal regulations in full, replacing it with a fresh set of operating norms for thermal generating stations (p4–5).

The substituted Regulation 16 has six heads. Head (i) sets target availability for recovery of full capacity (fixed) charges, with pro-rata recovery below target, nil capacity charges at zero availability, and separate treatment for named Neyveli Lignite Corporation and Talcher stations (p5). Head (ii) sets the target plant load factor for incentive, on the same station groupings (p5). Head (iii) sets gross station heat rate differentiated by set size, coal/lignite/gas fuel, named stations and machine classes, with lignite moisture multiplying factors, an adjustment for electrically driven boiler feed pumps, and a weighted-average rule for mixed set sizes (p5–6). Heads (iv) and (v) set secondary fuel oil consumption and auxiliary energy consumption, distinguishing stabilization from subsequent operation, cooling-tower arrangements and boiler feed pump drive (p6–7). Head (vi) defines the stabilization period, fixes its duration by fuel type, and records that it and the relaxed norms cease to apply from 1 April 2006 (p7).

A closing note records the principal regulations' notification date and the three earlier First Amendment Regulations (p7).

Standard name
Tariff Regulations
Primary topics
Generation tariff, Tariff determination

Read with this

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.