CERC · Central Electricity Regulatory Commission
Terms and Conditions of Tariff (Fourth Amendment) Regulations, 2007
Central Electricity Regulatory Commission (Terms and Conditions of Tariff) (Fourth Amendment) Regulations, 2007
AmendmentDated 28 Dec 2007In force from 7 Jan 2008No. L-7/25(5)/2003-CERC dated 28th December 2007
Replaced by Terms and Conditions of Tariff Regulations, 2009
See that regulation for the date it took effect and for anything it keeps in force.
Amends the Terms and Conditions of Tariff Regulations, 2004.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the CERC's fourth 2007 amendment to its 2004 tariff regulations, issued on 28 December 2007 and commencing at 00:00 hrs on 7 January 2008 (p1). It is a short operative instrument — six regulation changes plus a closing note — not a self-contained code.
Paragraph 2 removes the need to file Forms 5B, 5C and 5D when applying for a provisional tariff (p1). Paragraphs 3 and 5 substitute Regulations 19 and 35 with a single identical clause on sale of infirm power: infirm power is accounted as Unscheduled Interchange and paid from the regional or State UI pool at the applicable frequency-linked UI rate, and the revenue earned must be applied to reduce capital cost rather than be treated as revenue (p1–2).
Paragraphs 4 and 6 substitute Regulations 24(1) and 42(1), defining how UI is computed — actual minus scheduled generation, or actual minus scheduled drawal, for each 15-minute time block — and setting out the frequency-linked UI rate table on which all UI transactions are charged, with a cap for coal/lignite-firing stations and APM-gas-only stations when generation exceeds schedule (p1–4). Regulation 42's replacement also carries the hydro provisions: hydro stations may deviate to follow frequency and inflow so long as they do not game the system or cause a grid constraint, with whole-day net energy deviations trued up through the schedule for Day+3 (p3–4).
Paragraph 7 amends Regulation 45: revisions to declared capability, energy and beneficiary requisitions are allowed only in a contingency and take effect from the sixth time block (p4), and a new clause (xix) states the hydro scheduling rule that daily scheduled energy equals declared available energy, with a worked illustration of the (Day+3) compensation formula (p4). A closing note on p5 lists the principal regulations and the six amendments already made to them.
Read with this
The regulation
- Dated 26 Mar 2004Terms and Conditions of Tariff Regulations, 2004
Amendments and corrections
- Dated 11 Aug 2005Terms and Conditions of Tariff (First Amendment) Regulations, 2005
- Dated 13 Mar 2007Terms and Conditions of Tariff (Amendment) Regulations, 2007
- Dated 26 Apr 2007Terms and Conditions of Tariff Regulations, 2004 — Second Amendment, 2007
- Dated 27 Sep 2007Terms and Conditions of Tariff Regulations, 2004 — Third Amendment, 2007
Procedures and orders made under it
Other copies of these documents (4)
- Dated 26 Mar 2004Terms and Conditions of Tariff Regulations, 2004
- Dated 13 Mar 2007Terms and Conditions of Tariff (Amendment) Regulations, 2007
- Dated 26 Apr 2007Terms and Conditions of Tariff (Second Amendment) Regulations, 2007 — UI Charges
- Dated 28 Dec 2007Terms and Conditions of Tariff Regulations, 2004 — Fourth Amendment, 2007
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.