CERC · Central Electricity Regulatory Commission
Terms and Conditions of Tariff Regulations, 2004 — Fourth Amendment, 2007
Central Electricity Regulatory Commission (Terms and Conditions of Tariff) (Fourth Amendment) Regulations, 2007
Amendment · Gazette copyDated 28 Dec 2007Published in the Gazette 31 Dec 2007In force from 7 Jan 2008No. L-7/25(5)/2003-CERC. dated 28th December, 2007
Replaced by Terms and Conditions of Tariff Regulations, 2009
See that regulation for the date it took effect and for anything it keeps in force.
The Gazette copy of the Terms and Conditions of Tariff (Fourth Amendment) Regulations, 2007.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Central Electricity Regulatory Commission's Fourth Amendment to its 2004 Terms and Conditions of Tariff Regulations, issued on 28 December 2007 and published in the Gazette of India (Extraordinary), Part III, Section 4 on 31 December 2007 (p1, p5). It comes into force at 00.00 hrs on 7 January 2008 (p6).
The amendment touches several regulations of the principal regulations. It eases provisional tariff filings by removing the need to file Forms 5B, 5C and 5D with an application for determination of provisional tariff (p6). It restates the treatment of infirm power — accounted as Unscheduled Interchange and paid from the regional or State UI pool at the applicable frequency-linked UI rate, with any revenue earned applied to reduce capital cost and not treated as revenue (p6).
The core of the document is the Unscheduled Interchange regime. UI is defined for a generating station and for a beneficiary as the gap between actual and scheduled generation or drawal, worked out for each 15-minute time block, and priced off a frequency-linked rate schedule that pays nothing at or above a ceiling frequency and rises in steps as frequency falls, with a cap on rates payable for excess generation by coal- or lignite-fired stations and stations burning APM gas (pp6–8). The rate schedule is expressly subject to change by separate notification (pp7–8).
Hydro-electric stations are given flexibility to deviate from schedule in response to frequency and inflow, provided they do not game the system or cause a grid constraint, with the day's net energy deviation trued up in the Day+3 schedule using a formula illustrated on p9. Revision of declared capability is permitted only in a contingency, effective from the sixth time block (p8). A closing note lists the principal regulations and the five earlier amendments (p9).
Read with this
The regulation
- Dated 26 Mar 2004Terms and Conditions of Tariff Regulations, 2004
Amendments and corrections
- Dated 11 Aug 2005Terms and Conditions of Tariff (First Amendment) Regulations, 2005
- Dated 13 Mar 2007Terms and Conditions of Tariff (Amendment) Regulations, 2007
- Dated 26 Apr 2007Terms and Conditions of Tariff Regulations, 2004 — Second Amendment, 2007
- Dated 27 Sep 2007Terms and Conditions of Tariff Regulations, 2004 — Third Amendment, 2007
- Dated 28 Dec 2007Terms and Conditions of Tariff (Fourth Amendment) Regulations, 2007
Procedures and orders made under it
Other copies of these documents (3)
- Dated 26 Mar 2004Terms and Conditions of Tariff Regulations, 2004
- Dated 13 Mar 2007Terms and Conditions of Tariff (Amendment) Regulations, 2007
- Dated 26 Apr 2007Terms and Conditions of Tariff (Second Amendment) Regulations, 2007 — UI Charges
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.