CERC · Central Electricity Regulatory Commission
Hydro Tariff Filing Forms, Appendix-I Part-II — Terms and Conditions of Tariff Regulations, 2004
Appendix-I PART-II TARIFF FILING FORMS (HYDRO)
OrderDate not stated
Replaced by Terms and Conditions of Tariff Regulations, 2009
See that regulation for the date it took effect and for anything it keeps in force.
Made under the Terms and Conditions of Tariff Regulations, 2004.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the forms annexure — Appendix-I, Part-II — of CERC's tariff-filing regime: the set of proformas a hydro generating station must complete and file in support of a tariff petition (p1). It does not itself set tariff norms; it prescribes what the petitioner must disclose and in what format.
Form-1 (p3) is a summary sheet. The station-data form (p4) captures COD, type of hydro station, installed capacity, free power to the home state, excitation type, design energy, auxiliary consumption, transformation losses, saleable primary energy, primary energy rate and charge, and capacity index, with month-wise design energy to be filed separately.
Cost forms follow: Form-5 abstracts capital cost already admitted by CERC for existing stations, split domestic and foreign and cross-referenced to the admitting order (p5); Form-5A estimates cost for new projects at a stated price level and exchange rate, excluding and including IDC & FC, alongside a unit-wise commissioning schedule (p6). Two break-up forms give the head-of-works build-up of capital cost — infrastructure, major civil works, hydro-mechanical equipment, plant and equipment, taxes and duties, construction and pre-commissioning, overheads, IDC and FC — with original cost, variation and admitted cost columns and a time/cost-overrun note (p7–8). A package-wise form lists each construction, supply or service package with procurement route, dates, value and expenditure to COD, and requires mixed-currency packages to be shown separately with exchange rate and date (p9).
The loan forms cover the weighted average rate of interest on actual loans — source, currency, sanction, interest type and rate, caps/floors, moratorium, repayment period and frequency, and base exchange rate — package by package (p10–11). Further forms compute depreciation against CERC's depreciation schedule (p12) and interest on working capital (p13). Form-17 sets out the O&M calculation, including the base-O&M formula with escalation and the abnormal items (insurgency security, siltation, staff redeployment) that must be flagged (p14); Form-18 collects historical O&M, corporate expense and employee-number data (p15).
The only dates are benchmark and example dates.
Read with this
The regulation
- Dated 26 Mar 2004Terms and Conditions of Tariff Regulations, 2004
Amendments and corrections
- Dated 11 Aug 2005Terms and Conditions of Tariff (First Amendment) Regulations, 2005
- Dated 13 Mar 2007Terms and Conditions of Tariff (Amendment) Regulations, 2007
- Dated 26 Apr 2007Terms and Conditions of Tariff Regulations, 2004 — Second Amendment, 2007
- Dated 27 Sep 2007Terms and Conditions of Tariff Regulations, 2004 — Third Amendment, 2007
- Dated 28 Dec 2007Terms and Conditions of Tariff (Fourth Amendment) Regulations, 2007
Procedures and orders made under it
Other copies of these documents (4)
- Dated 26 Mar 2004Terms and Conditions of Tariff Regulations, 2004
- Dated 13 Mar 2007Terms and Conditions of Tariff (Amendment) Regulations, 2007
- Dated 26 Apr 2007Terms and Conditions of Tariff (Second Amendment) Regulations, 2007 — UI Charges
- Dated 28 Dec 2007Terms and Conditions of Tariff Regulations, 2004 — Fourth Amendment, 2007
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.