Skip to content

CERC · Central Electricity Regulatory Commission

Hydro Tariff Filing Forms, Appendix-I Part-II — Terms and Conditions of Tariff Regulations, 2004

Appendix-I PART-II TARIFF FILING FORMS (HYDRO)

OrderDate not stated

Replaced by Terms and Conditions of Tariff Regulations, 2009

See that regulation for the date it took effect and for anything it keeps in force.

Made under the Terms and Conditions of Tariff Regulations, 2004.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the forms annexure — Appendix-I, Part-II — of CERC's tariff-filing regime: the set of proformas a hydro generating station must complete and file in support of a tariff petition (p1). It does not itself set tariff norms; it prescribes what the petitioner must disclose and in what format.

Form-1 (p3) is a summary sheet. The station-data form (p4) captures COD, type of hydro station, installed capacity, free power to the home state, excitation type, design energy, auxiliary consumption, transformation losses, saleable primary energy, primary energy rate and charge, and capacity index, with month-wise design energy to be filed separately.

Cost forms follow: Form-5 abstracts capital cost already admitted by CERC for existing stations, split domestic and foreign and cross-referenced to the admitting order (p5); Form-5A estimates cost for new projects at a stated price level and exchange rate, excluding and including IDC & FC, alongside a unit-wise commissioning schedule (p6). Two break-up forms give the head-of-works build-up of capital cost — infrastructure, major civil works, hydro-mechanical equipment, plant and equipment, taxes and duties, construction and pre-commissioning, overheads, IDC and FC — with original cost, variation and admitted cost columns and a time/cost-overrun note (p7–8). A package-wise form lists each construction, supply or service package with procurement route, dates, value and expenditure to COD, and requires mixed-currency packages to be shown separately with exchange rate and date (p9).

The loan forms cover the weighted average rate of interest on actual loans — source, currency, sanction, interest type and rate, caps/floors, moratorium, repayment period and frequency, and base exchange rate — package by package (p10–11). Further forms compute depreciation against CERC's depreciation schedule (p12) and interest on working capital (p13). Form-17 sets out the O&M calculation, including the base-O&M formula with escalation and the abnormal items (insurgency security, siltation, staff redeployment) that must be flagged (p14); Form-18 collects historical O&M, corporate expense and employee-number data (p15).

The only dates are benchmark and example dates.

Standard name
Tariff Regulations
Primary topics
Tariff determination, Generation tariff, Capital cost and investment

Read with this

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document