CERC · Central Electricity Regulatory Commission

Terms and Conditions of Tariff (Amendment) Regulations, 2007

Central Electricity Regulatory Commission (Terms and Conditions of Tariff) (Amendment) Regulations, 2007

AmendmentDated 13 Mar 2007In force from 1 Apr 2007No. L-7/25(5)/2003-CERC dated the 13th March 2007

Replaced by Terms and Conditions of Tariff Regulations, 2009

See that regulation for the date it took effect and for anything it keeps in force.

Amends the Terms and Conditions of Tariff Regulations, 2004.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a CERC notification of 13 March 2007 that substitutes Regulation 16 (Norms of Operation) of the CERC (Terms and Conditions of Tariff) Regulations, 2004 in its entirety (p1–6). It is made under section 178 of the Electricity Act, 2003 and comes into force on 1.4.2007 (p1). It does not restate the tariff framework: it replaces only the operating norms used to work out recovery of capacity (fixed) charges and incentives for thermal, lignite-fired and gas/combined-cycle generating stations.

The substituted Regulation 16 covers, in order: target availability for recovery of full capacity charges (p1–2), target plant load factor for incentive (p2), gross station heat rate by fuel and unit size (p2–4), secondary fuel oil consumption (p4), auxiliary energy consumption (p4–5), and the stabilization period with its relaxed norms (p5–6). Most parameters are generic by technology and unit size, but several named stations get their own norms — Neyveli Lignite's TPS-I and TPS-II, Talcher, Tanda and NTPC's gas stations — so the amendment is partly a schedule of station-specific carve-outs (p2–5).

Two structural points matter. Recovery below target availability is expressed as a pro rata rule, with nil capacity charges at zero availability (p2). And the final Note in the substituted text says the stabilization period and relaxed norms cease to apply from 1.4.2006 (p6) — a date earlier than this amendment's own commencement, which a reader must reconcile with the rest of the clause.

A closing Note lists the principal regulations (Gazette 29.3.2004) and three earlier amendments (2004, 2005, 2006) (p6), placing this as the next in the series — though each of the three is itself numbered 'First Amendment'.

Standard name
Tariff Regulations
Primary topics
Tariff determination, Generation tariff

Read with this

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document