CERC · Central Electricity Regulatory Commission
Terms and Conditions of Tariff Regulations, 2004
Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2004
Regulation · Gazette copyDated 26 Mar 2004In force from 1 Apr 2004No. L-7/25(5)/2003-TC. dated 26th March, 2004
Replaced by Terms and Conditions of Tariff Regulations, 2009
See that regulation for the date it took effect and for anything it keeps in force.
The Gazette copy of the Terms and Conditions of Tariff Regulations, 2004.
Summary
Summary written by software, from pages 1 to 201 of 304. Check the regulator's original before you rely on it.
This is the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2004, notified at New Delhi on 26 March 2004 and made under Section 178 of the Electricity Act, 2003 (p172). They come into force on 1.4.2004 for five years unless reviewed earlier or extended (p172). The supplied excerpt covers Chapter 1 (Preliminary), Chapter 2 (Thermal Power Generating Stations) and the start of Chapter 3 (Hydro Power Generating Stations).
Chapter 1 (pp172–176) sets scope and general tariff principles. Competitively bid tariffs are to be adopted, while the regulations apply where CERC determines tariff on capital cost (p172). Norms are ceiling norms and parties may agree improved norms (p172). Tariff is determined stage-wise/unit-wise for generation and line/sub-station/system-wise for transmission (p173). Applications for new projects are made in two stages—provisional tariff and final tariff (p173). Tax on core-business income is a pass-through with an escrow mechanism, and foreign exchange rate variation is recovered directly from beneficiaries (pp174–175). The Commission may relax norms and remove difficulties (pp175–176). The Net Fixed Assets approach is preserved for Neyveli Lignite’s TPS-I and TPS-II (p176).
Chapter 2 (pp176–198) governs thermal stations. It defines key terms (pp176–179), then structures tariff as two-part: annual capacity (fixed) charges covering interest on loan, depreciation including advance against depreciation, return on equity, O&M expenses and interest on working capital, plus energy (variable) charges covering fuel cost (p179). It prescribes ceiling norms of operation for target availability, target PLF, gross station heat rate, secondary fuel oil consumption, auxiliary energy consumption and stabilization periods, with separate treatment for coal, lignite, gas/combined cycle, small gas stations and named plants (pp179–183). It sets rules on capital cost, additional capitalisation and debt-equity ratio, and detailed computation of capacity charges (pp183–191). Energy charges are formula-based and adjusted for fuel price or heat value variation (pp191–192). It provides for incentive, UI charges, rebate and late payment surcharge (pp192–193), scheduling, demonstration of declared capability, metering/accounting, and monthly billing/payment (pp193–198).
Chapter 3 (pp198–201) begins hydro power stations. It defines hydro-specific terms such as design energy, primary/secondary energy, saleable primary/secondary energy, capacity index, daily capacity index, deemed generation and hydro station types (pp198–201). It then starts norms of operation for recovery of full capacity charges, with normative capacity index by station type and by first-year/other periods (p201).
Read with this
The regulation
- Dated 26 Mar 2004Terms and Conditions of Tariff Regulations, 2004
Amendments and corrections
- Dated 11 Aug 2005Terms and Conditions of Tariff (First Amendment) Regulations, 2005
- Dated 13 Mar 2007Terms and Conditions of Tariff (Amendment) Regulations, 2007
- Dated 26 Apr 2007Terms and Conditions of Tariff Regulations, 2004 — Second Amendment, 2007
- Dated 27 Sep 2007Terms and Conditions of Tariff Regulations, 2004 — Third Amendment, 2007
- Dated 28 Dec 2007Terms and Conditions of Tariff (Fourth Amendment) Regulations, 2007
Procedures and orders made under it
Other copies of these documents (3)
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.