CERC · Central Electricity Regulatory Commission

Terms and Conditions of Tariff Regulations, 2004 — Second Amendment, 2007

Central Electricity Regulatory Commission (Terms and Conditions of Tariff) (Second Amendment) Regulations, 2007

AmendmentDated 26 Apr 2007In force from 30 Apr 2007No. L-7/25(5)/2003-CERC dated the 26th April 2007

Replaced by Terms and Conditions of Tariff Regulations, 2009

See that regulation for the date it took effect and for anything it keeps in force.

Amends the Terms and Conditions of Tariff Regulations, 2004.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a short amending notification issued by the Central Electricity Regulatory Commission on 26 April 2007, made under Section 178 of the Electricity Act, 2003, and it does one substantive thing: it replaces the unscheduled interchange (UI) charges provisions of the CERC (Terms and Conditions of Tariff) Regulations, 2004 with a restated text (p1).

Paragraph 1 sets the short title and brings the amendment into force from 00.00 hours on 30 April 2007 (p1). Paragraph 2 substitutes Regulation 24 of the principal regulations, and paragraph 3 substitutes Regulation 42 — the two substituted texts are word-for-word identical, each covering machinery for settling deviations between actual and scheduled generation or drawal (p1–4).

The substituted provision defines UI as actual generation (or drawal) minus scheduled generation (or drawal), computed for each 15-minute time block, and prices all UI transactions off the average frequency of the block using a frequency-linked rate schedule in 0.02 Hz steps, expressed in paise per kWh (p1–3). It states that the frequency range and rates may be changed later by a separate notification of the Commission (p2, p3).

The provision also sets a tolerance band on declared capacity within which a generator's excess output is not treated as gaming and does attract UI charges; generation beyond that band is investigated by the Regional Load Despatch Centre, and where gaming is found the UI charges are reduced to zero and the amount is credited to beneficiaries' UI accounts in proportion to their capacity share in the station (p2, p4).

A Note on the last page records when the principal regulations were gazetted and lists the four amendments made to them up to that point (p4).

Standard name
Tariff Regulations
Primary topics
Deviation settlement (DSM)

Read with this

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document