CERC · Central Electricity Regulatory Commission

Terms and Conditions of Tariff Regulations, 2009

Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2009

RegulationDated 19 Jan 2009In force from 1 Apr 2009No.L-7/145(160)/2008-CERC dated 19th January, 2009

Replaced by Terms and Conditions of Tariff Regulations, 2014

See that regulation for the date it took effect and for anything it keeps in force.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software, from pages 1 to 46 of 63. Check the regulator's original before you rely on it.

The notification is CERC's principal tariff regulation for the 2009-14 control period, made under s.178 of the Electricity Act, 2003 and applying to generating stations, other than non-conventional energy sources, and the inter-State transmission system where CERC determines tariff under s.62 read with s.79 (p1–2). It comes into force on 1.4.2009 and is to remain in force for five years unless reviewed or extended; pre-1.4.2009 projects whose tariff was not finally determined are to have tariff up to 31.3.2009 determined under the 2004 regulations (p1).

Chapter 1 (p1–9) defines the tariff vocabulary — capital cost, COD, cut-off date, change in law, availability measures, useful life and the like — and states the regulation's scope. Chapter 2 (p10–19) sets the procedural and capital-cost machinery: application for tariff under the 2004 procedure regulations and Appendix I, auditor-certified capex, provisional billing for existing projects, truing up after the control period, admission of capital cost after prudence check, initial-spares ceilings, additional capitalisation, R&M and life extension, including a special allowance route for coal/lignite stations, treatment of infirm power, and the debt-equity norm.

Chapter 3 (p20–41) is the computation core. It fixes the components of annual fixed cost; provides the method for return on equity, interest on loan, depreciation, interest on working capital and O&M expenses; gives formulas for secondary fuel oil expense and fuel-price adjustment; and sets out capacity-charge and energy-charge formulas for thermal and hydro stations, transmission charges for ISTS, and treatment of UI. It also permits the Department of Atomic Energy to adopt the same tariff structure for nuclear stations (p36).

Chapter 4 contains operational norms. Regulation 25 makes recovery of capacity, energy and transmission charges dependent on achieving these norms, allows revision of station heat rate norms for relaxed-norm stations, and provides for sharing SFC savings. Regulation 26 begins the thermal norms: NAPAF for different categories of stations, gross station heat rate for existing stations and for new stations achieving COD on or after 1.4.2009, including design heat rate caps. The remaining chapters, regulations and appendices are not available here.

Standard name
Tariff Regulations
Primary topics
Tariff determination, Generation tariff, Transmission tariff

Read with this

Other copies of these documents (5)

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document