Explanatory Memorandum to Draft Terms and Conditions of Tariff (First Amendment) Regulations, 2015

Explanatory Memorandum to Draft Central Electricity Regulatory Commission (Terms and Conditions of Tariff) (First Amendment) Regulations, 2015

Explanatory memorandum to a draftReleased with the notice dated 4 Jun 2015

Explanatory memorandum to the Terms and Conditions of Tariff (First Amendment) Regulations, 2015 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the explanatory memorandum that accompanies the draft Central Electricity Regulatory Commission (Terms and Conditions of Tariff) (First Amendment) Regulations, 2015. It explains why CERC proposes ten changes to the 2014 Tariff Regulations, which took effect on 1.4.2014, and reproduces the text of each proposed amendment (p1–7).

The immediate trigger is the Ministry of Power gas scheme, O.M. No. 4/2/2015-Th.I dated 27.3.2015. The memorandum summarises that scheme's scope, PSDF funding, eligibility and stakeholder sacrifices, and proposes a new Regulation 23A to let CERC determine tariffs of covered gas-based stations in deviation from the 2014 Regulations (p1, p4–5).

The other amendments are technical and corrective. They provide for true-up of interim point-of-connection transmission charges and existing-project tariffs with simple interest (Regulation 7, p2); cap hydro scheduled generation at saleable design energy for gain-sharing reconciliation (Regulation 8, p2–3); include foreign exchange risk variation in capital cost (Regulation 9, p3); add IEDC to a cost-escalation proviso (Regulation 12, p3–4); exclude deferred tax from the effective tax rate and correct a typographical error (Regulation 25, p5–6); treat IT equipment and software salvage value as nil (Regulation 27, p6); correct a Durgapur TPS unit designation (Regulation 29, p6); restate deferred tax liability recovery for three historical periods (Regulation 49, p6–7); and add communication asset depreciation rates to Appendix II (p7).

The document is a statement of reasons for a draft amendment, not the notified regulation. It is aimed at CERC tariff stakeholders: generating companies, transmission licensees, beneficiaries and gas-based generators.

Standard name
Tariff Regulations
Primary topics
Tariff determination, Generation tariff, Transmission tariff

Read with this

The regulation

Other copies of these documents (2)

2 more documents belong here and are not on Voltaic: 1 consultation paper and 1 draft or notice on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document