Draft Terms and Conditions for Tariff (Second Amendment) Regulations, 2017 — Explanatory Memorandum

Explanatory Memorandum for the "Draft Central Electricity Regulatory Commission (Terms and Conditions for Tariff) (Second Amendment) Regulations, 2017"

Explanatory memorandum to a draftReleased with the notice dated 28 Apr 2017

Explanatory memorandum to the draft Terms and Conditions of Tariff (Second Amendment) Regulations, 2017.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Central Electricity Regulatory Commission's explanatory memorandum for the draft (Terms and Conditions for Tariff) (Second Amendment) Regulations, 2017. It is a consultation-stage justification rather than the amendment itself: it explains why the Commission proposes to end the Transmission Majoration Factor (TMF).

Paragraphs 1–2 (p1–2) reproduce Regulation 4.10A of the 2001 Tariff Regulations, inserted by the First Amendment dated 21.9.2001, which created TMF as a pre-tax markup on transmission charges for projects executed through IPTC/JV routes, payable over the life of the project to a licensee under Section 27C of the Indian Electricity Act, 1910 who was licensed up to 31.3.2004. The memorandum records that Powerlinks Transmission Limited, licensed on 13.11.2003 for 25 years, was the only JV-route licensee in 2001-04 and that orders dated 24.6.2004 and 28.4.2008 confirmed TMF for the project's life.

Paragraphs 3–4 (p2) tabulate transmission licences issued in each tariff period by route, and explain how tariffs are set for each: cost-plus for JV projects and for dedicated lines converted to ISTS under Regulation 6(c) of the 2009 licence regulations, and bid-discovered charges for IPTC and Section 63 projects. None of the other private-participation projects receives a promotional incentive.

Paragraphs 5–6 (p3) record objections from respondents including BRPL and UPPCL in Petitions 18/TT/2014 and 20/TT/2014, the Commission's order of 6.5.2016 directing staff to examine whether TMF should continue, and a table of the majoration Powerlinks actually recovered over 2006-07 to 2013-14.

Paragraph 7 (p3–4) is the operative proposal: insert Regulation 49A into the 2014 Tariff Regulations so that TMF allowed under Regulation 4.10A of the 2001 regulations stands withdrawn with prospective effect, balancing the interests of the developer and consumers.

Standard name
Tariff Regulations
Primary topics
Transmission tariff

Read with this

The regulation

Other copies of these documents (2)

2 more documents belong here and are not on Voltaic: 1 consultation paper and 1 draft or notice on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document