Terms and Conditions of Tariff from 1.4.2014 — Public Notice

Terms and Conditions of Tariff for the tariff period commencing from 1.4.2014

Public notice on a draftDated 25 Jun 2013No. 20/2013/CERC/Fin(Vol-I)/Tariff Reg/CERC dated 25th June'2013

Draft

The draft has since been finalised as the Terms and Conditions of Tariff Regulations, 2014.

Public notice on a draft that is not on Voltaic.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A one-page public notice from CERC (p1) opening consultation on the terms and conditions of tariff for the control period 1.4.2014 to 31.3.2019. It records that the current tariff period ends on 31 March 2014 and that work has begun on fresh terms and conditions for 2014-19, given sector developments during the current period, current and perceived challenges, and the need for market development (p1).

The notice restates the Commission's tariff jurisdiction — central generating companies, generators with a composite scheme of generation and sale in more than one State, inter-State transmission, and transmission licensees (p1). An approach paper is enclosed for consultation, and comments are invited from the public, industry players and other stakeholders, including on issues not covered in the paper that bear on tariff terms (p1). Submissions (three hard copies plus a soft copy) must reach the Commission's office by 24.7.2013 (p1). It is signed by the Chief (Finance).

Primary topics
Tariff determination

Read with this

The regulation

Other copies of these documents (2)

2 more documents belong here and are not on Voltaic: 1 consultation paper and 1 draft or notice on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document