Terms and Conditions of Tariff (First Amendment) Regulations, 2015 — Draft
Central Electricity Regulatory Commission (Terms and Conditions of Tariff) (First Amendment) Regulations, 2015
Draft amendmentDated 4 Jun 2015No. L-1/144/2013/CERC dated 4 th June, 2015
Draft
A proposal that has since been finalised as the Terms and Conditions of Tariff Regulations, 2014 — First Amendment, 2015.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a Central Electricity Regulatory Commission instrument dated 4 June 2015 (No. L-1/144/2013/CERC), headed "Draft Notification", which makes the CERC (Terms and Conditions of Tariff) (First Amendment) Regulations, 2015 amending the CERC (Terms and Conditions of Tariff) Regulations, 2014 ("the Principal Regulations") (p1, p3). It is made under Section 178 read with Section 61 of the Electricity Act, 2003 (p1).
Regulation 1 gives the short title and commencement: everything takes effect from Gazette publication, except the newly inserted Regulation 23A, which is given effect from 1 June 2015 and applies for 2015-16 and 2016-17 unless extended (p1). Regulation 2 adds provisos to Regulation 7 of the Principal Regulations requiring generating companies and transmission licensees to recover or refund the difference between the tariff under the existing proviso and the tariff under Regulation 6, with simple interest at the bank rate, in six equal monthly instalments (p1–2).
On page 2 the draft amends Regulation 8(6) to cap a hydro station's scheduled generation at saleable design energy; adds a sub-clause to Regulation 9(2)(b) bringing foreign-exchange gains or losses on construction-period loans into capital cost; inserts "IEDC" alongside "IDC" in Regulation 12(2)(ii); inserts new Regulation 23A directing that tariffs of gas-based stations covered by the Ministry of Power's gas utilisation scheme be determined in consideration of that scheme in deviation from the relevant regulations; substitutes the wording of Regulation 25(1) so that income tax on other business streams is excluded from the effective tax rate; adds a proviso to Regulation 27(3) treating salvage value of IT equipment and software as nil and the whole asset value as depreciable; and substitutes a Durgapur TPS unit in the table under Regulation 29(1)(b).
Page 3 substitutes Regulation 49 in full, governing which periods' deferred tax liabilities generating companies and transmission licensees may recover directly from beneficiaries or long-term customers/DICs, and adds an entry to the depreciation table in Appendix II under Serial No. (o). A closing Note records that the Principal Regulations were published on 12 March 2014 (p3).
Read with this
The regulation
- Dated 21 Feb 2014Terms and Conditions of Tariff Regulations, 2014
Amendments and corrections
Commencement notices and reasons
Other copies of these documents (2)
Earlier drafts
- Dated 25 Jun 2013Terms and Conditions of Tariff from 1.4.2014 — Public Notice
- Dated 24 Jul 2013Terms and Conditions of Tariff for the tariff period from 1.4.2014 — Public Notice extending comment deadline to 14.08.2013
- Dated 6 Dec 2013Draft Terms and Conditions of Tariff Regulations, 2014 (tariff period 1.4.2014 to 31.3.2019) — Public Notice
- Dated 6 Dec 2013Terms and Conditions of Tariff Regulations, 2014 — Draft
- Dated 28 Apr 2017Terms and Conditions of Tariff (Second Amendment) Regulations, 2017
- Released with the notice dated 28 Apr 2017Explanatory memorandum: Draft Terms and Conditions for Tariff (Second Amendment) Regulations, 2017 — Explanatory Memorandum
- Dated 28 Apr 2017Public notice: Draft Terms and Conditions of Tariff (Second Amendment) Regulations, 2017 — Public Notice
- Released with the notice dated 4 Jun 2015Explanatory memorandum: Explanatory Memorandum to Draft Terms and Conditions of Tariff (First Amendment) Regulations, 2015
- Dated 4 Jun 2015Public notice: Public Notice on Draft Terms and Conditions of Tariff Regulations, 2014
2 more documents belong here and are not on Voltaic: 1 consultation paper and 1 draft or notice on a draft.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.