CERC · Central Electricity Regulatory Commission
Terms and Conditions of Tariff Regulations, 2014 — First Amendment, 2015
Central Electricity Regulatory Commission (Terms and Conditions of Tariff) (First Amendment) Regulations, 2015
AmendmentDated 5 Nov 2015No. L-1/144/2013/CERC dated 5 th of November, 2015
Replaced by Terms and Conditions of Tariff Regulations, 2019
See that regulation for the date it took effect and for anything it keeps in force.
Amends the Terms and Conditions of Tariff Regulations, 2014.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a single-issue amendment notification from the Central Electricity Regulatory Commission, dated 5 November 2015 and numbered L-1/144/2013/CERC, made under Section 178 read with Section 61 of the Electricity Act, 2003 (p1). It amends the CERC (Terms and Conditions of Tariff) Regulations, 2014, which it calls the "Principal Regulations" — the note at the end records that those were published on 12 March 2014 in the Gazette of India Extraordinary (p4).
The amendment works through eleven numbered clauses. The bulk of it touches the cost and gain-sharing machinery of the principal regulations: a new proviso under Regulation 7 providing for recovery or refund of a tariff difference with simple interest at the bank rate in three equal monthly instalments (p1–2); a substituted sharing sentence and a new hydro-specific formula under Regulation 8(6) for gains on operational parameters and auxiliary energy consumption, split with beneficiaries (p2); a new sub-clause under Regulation 9(2)(b) bringing foreign-exchange risk variation on construction-period loans into capital cost (p3); insertion of "and IEDC" beside "IDC" in Regulation 12 (p3); a substituted sentence in Regulation 25(1) on tax from other business streams (p3); a proviso under Regulation 27(3) on salvage value of IT equipment and software (p3); a station-name correction in the Regulation 29 table (p3); a fully substituted Regulation 49 on which periods' deferred tax liabilities are recoverable from beneficiaries, long term transmission customers or DICs (p4); and an addition to the Appendix II depreciation table under Serial No. (o) (p4).
The headline substantive change is the insertion of new Regulation 23A, which routes tariff determination for gas-based generating stations covered by the Ministry of Power's "Scheme for Utilization of Gas based power generation capacity" (OM dated 27.3.2015) through that scheme "in deviation of the relevant regulations" (p3). Unusually, this regulation alone is backdated: it takes effect from 1 June 2015 and applies for 2015-16 and 2016-17 unless extended, while everything else commences on Gazette publication (p1).
Read with this
The regulation
- Dated 21 Feb 2014Terms and Conditions of Tariff Regulations, 2014
Amendments and corrections
Commencement notices and reasons
Other copies of these documents (2)
Earlier drafts
- Dated 25 Jun 2013Terms and Conditions of Tariff from 1.4.2014 — Public Notice
- Dated 24 Jul 2013Terms and Conditions of Tariff for the tariff period from 1.4.2014 — Public Notice extending comment deadline to 14.08.2013
- Dated 6 Dec 2013Draft Terms and Conditions of Tariff Regulations, 2014 (tariff period 1.4.2014 to 31.3.2019) — Public Notice
- Dated 6 Dec 2013Terms and Conditions of Tariff Regulations, 2014 — Draft
- Dated 4 Jun 2015Terms and Conditions of Tariff (First Amendment) Regulations, 2015 — Draft
- Released with the notice dated 4 Jun 2015Explanatory memorandum: Explanatory Memorandum to Draft Terms and Conditions of Tariff (First Amendment) Regulations, 2015
- Dated 4 Jun 2015Public notice: Public Notice on Draft Terms and Conditions of Tariff Regulations, 2014
- Dated 28 Apr 2017Terms and Conditions of Tariff (Second Amendment) Regulations, 2017
- Released with the notice dated 28 Apr 2017Explanatory memorandum: Draft Terms and Conditions for Tariff (Second Amendment) Regulations, 2017 — Explanatory Memorandum
- Dated 28 Apr 2017Public notice: Draft Terms and Conditions of Tariff (Second Amendment) Regulations, 2017 — Public Notice
2 more documents belong here and are not on Voltaic: 1 consultation paper and 1 draft or notice on a draft.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.