Terms and Conditions of Tariff, 2014 — First Amendment, 2015 — Statement of Reasons

Central Electricity Regulatory Commission (Terms and Conditions of Tariff) (First Amendment) Regulations, 2015

Statement of reasonsDated 4 Dec 2015

Replaced by Terms and Conditions of Tariff Regulations, 2019

See that regulation for the date it took effect and for anything it keeps in force.

The commission's reasons for the Terms and Conditions of Tariff Regulations, 2014 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CERC's Statement of Reasons dated 4 December 2015 (p1) for the draft Central Electricity Regulatory Commission (Terms and Conditions of Tariff) (First Amendment) Regulations, 2015. It explains why the Commission proposed to amend the 2014 Tariff Regulations — principally to give effect to the Ministry of Power's Scheme for utilization of gas based power generation capacity (O.M. No. 4/2/2015-Th.1 dated 27.3.2015) and to remove ambiguities in the 2014 regulations (p1) — and records the consultation and the Commission's final decisions on each proposed change. The document is not itself the amending regulation; the operative text is in the separate First Amendment Regulations.

Paragraphs 1–5 (pp1–2) set out the background and public consultation: the public notice issued on 4 June (printed as 4.6.2012), comments invited by 19 June 2015, a public hearing held on 19 August 2015, written comments from Ratnagiri Gas and Power, PGCIL, NHPC, NTPC, THDC, NEEPCO and United Residents of Delhi, and participation in the hearing by NHDC, PGCIL, NHPC, THDC and a consumer (pp1–2).

The rest of the document takes each proposed amendment in turn, summarises stakeholder comments and gives the Commission's analysis and decision. Paragraph 6 (pp2–4) covers Regulation 7: recovery/refund of the difference between the provisional/90% tariff and the tariff finally determined, with simple interest at the bank rate and recovery in equal monthly instalments. The Commission reduced the draft's six equal monthly instalments to three, and left late payment surcharge to Regulation 45 (pp3–4). Paragraph 7 (pp4–8) deals with Regulation 8(6): sharing of net gains from controllable parameters. It sets out separate formulae for hydro stations whose saleable scheduled generation exceeds saleable design energy, and retains 60:40 sharing between generating station and beneficiaries (pp7–8). Paragraph 8 (pp8–9) adds gains or losses on foreign exchange rate variation on construction-period loans to capital cost. Paragraph 9 (pp9–10) inserts 'IEDC' into the Regulation 12(2)(ii) proviso so a generating company also bears IEDC where its station is not commissioned with the associated transmission system. Paragraph 10 (pp10–11) adds Regulation 23A, enabling tariff of gas-based stations covered by the MoP scheme to be determined in deviation of the relevant 2014 regulations. Paragraph 11 (pp11–12) corrects Regulation 25 to read 'actual income tax' on other business streams. Paragraph 12 (pp12–13) adds a proviso for nil salvage value of IT equipment and software and clarifies treatment of SCADA/WAMS/fibre-optic assets. Paragraph 13 (p13) corrects the unit number of Durgapur TPS in Regulation 29(1)(b). Paragraph 14 (pp13–14) substitutes Regulation 49 on deferred tax liabilities, making those for 2009-14 and 2014-19 non-recoverable from beneficiaries/long-term customers. Paragraph 15 (p14) records that PGCIL's additional suggestions on O&M norms and related matters fall outside the amendment's scope and were not considered.

Standard name
Tariff Regulations
Primary topics
Tariff determination, Generation tariff, Capital cost and investment

Read with this

The regulation

Other copies of these documents (2)

2 more documents belong here and are not on Voltaic: 1 consultation paper and 1 draft or notice on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document